company guide Among the general project features are the construction of 3,240 meters above sea level, reaching an altitude of 2,819
meters at kilometer point 76+700, before ascending to Hu-
three railway lines, two for commuter passenger service (elec-
ancavelica at 3,680 meters above sea level, with gradients
trified) and one for freight, with a total length of 27 km, com-
pleting a track network of over 100 km across the three lines.
exceeding 30% in some sections.
Latin America - Mexico
Consultrans is developing the Environmental Impact Assess-
Consultrans is providing international technical assistance for
ments (EDI) for both permanent and early works, as well as
the EDI for rolling stock. The work to be carried out includes
the supervision and technical support for the design of the
EAC-350 catenary electrification system and the interfaces of
Section 5N and Section 6 of the Maya Train.
new railway bridges, 38 tunnels, riverbank protection, draina-
ge works, stations, stops, maintenance workshops, switching
These actions are part of the construction of the Tren Maya, the comprehensive design of the project, encompassing 15
yards, level crossings, signaling, superstructure, assembly, and
which covers 5 Mexican states over a distance of 1,554 km logistics for the future construction. It also includes the Envi-
and has 19 stations. The route has been divided into the con- ronmental Management Instrument (IGA).
struction of 7 sections. Sections 1 and 7 meet at the Escárcega
station in Campeche, completing the ring that surrounds the Africa
Yucatán Peninsula. Mixed traffic, both passengers and freight, Consultrans aims to develop its commercial activities in Africa
is expected. Our activities will be centered on sections 5N and become a benchmark for the development of railway in-
and 6. frastructure and urban mobility. During 2023, strong alliances
have been forged with multilateral financing agencies, public
Section 5N runs from Cancun to Playa del Carmen, a distance institutions and local partners.
of 43.58 km, and includes the Puerto Morelos station. Due
to the uniqueness of the line, which includes three very long The company has participated in international processes in
viaducts, a significant amount of catenary work was required. countries such as Kenya, Tanzania, South Africa and Nami-
The length of the viaducts is 50% of the length of the railway. bia. Consultrans’ presence in Uganda has been consolidated
Section 6 runs from Tulum to Chetumal and is 250.56 km and strengthened as it moves forward with new projects in
long, with 4 stations (Tulum, Felipe Carrillo Puerto, Bacalar the country. Some of the current projects in Uganda include:
and Chetumal), which meant that the design of the catenary
had to take into account the technical constraints of the track Railway Signaling Feasibility Study Consultancy
configuration at these stations. The objective of this contract is to provide a technical propo-
Latin America – Peru sal for a feasibility study to determine the benefits of imple-
Consultrans continues to consolidate its presence in the Pe- menting a signaling system on the Ugandan railway network.
ruvian market, developing the detailed engineering for the
Huancayo-Huancalevica railway project, currently the most A technical study has been carried out on various railway
important in the country, and completing its consulting con- signaling options to improve the existing network in Ugan-
tract for the World Bank. da operated by the Uganda Railways Corporation (URC).
Currently, the network has minimal signaling, which limits
Perú has a very significant railway investment plan, including capacity, safety and operational efficiency. The implemen-
the expansion of Line 1 of the Metro and the new Lines 3 and tation of modern systems such as automatic block signaling,
4 planned for the city of Lima. This is in addition to several automatic train protection (ATP) systems, electronic inter-
commuter rail lines throughout the country, as well as various lockings and digital technologies was analyzed to optimize
connections to ports and potential mining sector needs. operations and improve safety. Key factors such as the re-
quired electrical power, reliable communications, efficient
Development of the Detailed Engineering Design (EDI) for level crossing management and fencing protection are also
the Huancayo-Huancalevica Railway (FHH) addressed. In addition, technical, financial, and operatio-
The Huancayo-Huancalevica railway corridor has been in nal aspects are evaluated, risks are identified, and specific
operation since 1926, and given its location, it has always recommendations are made to ensure the viability and su-
faced significant geological challenges, as it runs through an stainability of the project.
area highly susceptible to landslides and rockfalls. Likewise,
the aforementioned corridor operates under unique conditi- The study recommends a move towards automated and cen-
ons in terms of altitude, as the route runs from Huancayo at tralized signaling, emphasizes the importance of training local