Technical assistance, inspection and management of major to Puerto de Cotos station. Particularly noteworthy is the tun-
infrastructure projects. nel that crosses the summit of Puerto de Navacerrada, with a
New technologies such as application design and develop- length of 670 meters.
ment, system integration and consulting. The works include the correction of the deficiencies in the
R+D consultancy and management. superstructure, the installation of the track and the installation
European funding consultancy. of new track equipment, as well as the improvement of the guía de empresas
existing functional characteristics with the renovation of the
Star products: ENGINEERING AND CONSULTANCY: 1. EDI platforms in the stations and stops.
Design Railways Project Huancayo – Huancavelica (FHH).
Perú. 2. Construction projects for the renovation of Alcalá de As far as electrification is concerned, the 1.5 kV DC power
Henares station and La Garena and Soto del Henares Halts, supply will be maintained and it is planned to install a new
Madrid. overhead contact line, dismantling the existing one and ad-
apting it to the pantographs of the new rolling stock that will
Activity in the year: be put into service. New electronic interlockings will be in-
Spain stalled, depending on the ENCE (Electronic Interlocking Con-
In the last five years, the company has undergone a significant trol Equipment) at Navacerrada, and the installations will be
development in Spain, standing out in several key projects automatically controlled by the CTC (Centralized Traffic Con-
for the strengthening of the national railway network, inclu- trol) at Madrid - Chamartín. In addition, an automatic release
ding the company’s participation in major projects such as #blockade on a single track will be installed in accordance
the Mediterranean Corridor and the high-speed line that will with the new block system.
connect Madrid with Portugal, which has led to the growth
of the Railway Infrastructure and Technical Assistance De- TECHNICAL ASSISTANCE FOR THE CONTROL AND SU-
partments. PERVISION OF THE WORKS TO REMOVE THE TELEPHO-
NE BLOCKAGE BETWEEN ZAFRA-HUELVA FREIGHT AND
Furthermore, since the creation of the Telecommunications ZAFRA-LLANO DE LA GRANJA
and Signaling Department in 2023, contracts worth more than
7 million euros have been won, making Consultrans a leader The objective of this project is to progressively minimize the
in the sector. Consultrans has been the engineering compa- risks caused by the human factor in the railway traffic proces-
ny chosen by the main signaling companies (Siemens, Enyse, ses. It is part of the plan to improve the safety equipment of the
CAF and Hitachi) to design their projects. network, which includes the elimination of telephone blocka-
des and the installation of minimum train protection systems.
Among the projects in which Consultrans has participated, the
following stand out: The works cover two conventional single track lines with la-
teral signaling and without conventional ASFA, with a total
TECHNICAL ASSISTANCE FOR THE CONTROL AND SU- length of 219 km, where it will be necessary to replace the
PERVISION OF THE WORKS OF THE REHABILITATION current mechanical interlockings with new electronic inter-
PROJECT OF LINE 116 LOS COTOS - CERCEDILLA. SEC- lockings, install new LED signals and axle counters for train
TION: CERCEDILLA STATION - LOS COTOS STATION. detection. The new interlocking functionalities will be inte-
INFRASTRUCTURE, TRACK, COMPLETE RENOVATION OF grated into the Seville CTC.
C.A.R. AND ELIMINATION OF TELEPHONE BLOCKAGE.
TECHNICAL ASSISTANCE FOR THE CONTROL AND SU-
The scope of these actions is part of the Comprehensive Im- PERVISION OF TRACK AND Catenary WORKS ON THE
provement Plan for Madrid’s Cercanías Services 2018-2025, CASTELLÓN-VINAROZ, VINAROZ-VANDELLÓS AND
with the aim of maintaining the quality of the service to ensure VANDELLÓS-LA BOELLA INTERCHANGES
user satisfaction and loyalty, activating immediate measures
for service reliability. With a total length of 188 km within the Valencia-Tarragona
line, this action, key to the development of the Mediterranean
The works will be carried out on the Cercedilla-Los Cotos line, Corridor, aims to ensure the continuity of the line through the
which corresponds to line C-9 within the Madrid Cercanías Trans-European Transport Network, through the implementa-
network and line 116 of the ADIF network. It is 18.1 kilo- tion of standard or international gauge.
meters long and generally runs uphill from Cercedilla station In addition, the stations along the line will be adapted and the