Page 334 - Anuario FFCC - 2026
P. 334

company guide  some Media and Larga Distancia services of Renfe Operadora.   TECHNICAL ASSISTANCE FOR THE CONTROL AND SU-

                 It also includes the transformation of the current track 10C for
                                                                   PERVISION OF THE EXECUTION OF THE WORKS FOR THE
                                                                   PROVISION OF AUTOMATIC BLOCKING DEVICES FOR
                 the use of the regular services of line C-5 (Móstoles-El Soto -
                                                                   THE DUAL CARRIAGE OF THE R3 LINE OF THE BARCELO-
                 Atocha - Fuenlabrada - Humanes), eliminating its status as a
                                                                   NA SUBURBAN RAILWAY ON THE PARETS DEL VALLÉS -
                 siding, as well as modifications to the existing points tracks at
                                                                   LA GARRIGA
                 the southern end of the station.
                                                                   The objective of the project is to equip the Parets del Vallès-
                 The signaling works will consist of the modification of the
                 field elements, as well as the adaptation of the existing interior
                                                                   with the Automatic Blocking System (ABS), and adapt it to the
                 equipment in the cab and the necessary modifications to the
                 ENCE, PLO and CTC. These works will be carried out in coor-
                                                                   planned doubling of the line.
                 dination with the track project.                  La Garriga section of the Barcelona R3 suburban railway line
                                                                   It includes the modification of the existing electronic interlok-
                                                                   kings, the installation of new LED signals, the complete rene-
                 The technical assistance work will ensure that the works are   wal of the track circuits with audio frequency technology and
                 carried out in accordance with current quality, safety and   ASFA digital equipment.
                 environmental regulations. It will also include the review of
                 technical documents, quality control, supervision of the dif-  It also includes the adaptation of telecommunications systems
                 ferent phases of construction and, finally, the commissioning   through new permanent fiber optic lines, IP equipment, and
                 and handover of the facilities to the corresponding mainte-  the integration of video surveillance and object detection sy-
                 nance department.                                 stems.

                 TECHNICAL ASSISTANCE FOR THE DEVELOPMENT AND IM-  This project is part of the track doubling works aimed at im-
                 PLEMENTATION OF A UNIFIED CONTROL CENTRE FOR ERTMS   proving the capacity and efficiency of the rail service on this
                 (CCUE) AND ADAPTATION OF EXISTING FACILITIES AND EQUIP-  important regional link. The geographical location of the sec-
                 MENT ON HIGH-SPEED LINES IN THE NORTH-WEST REGION   tion, in the province of Barcelona, Catalonia, is key to the
                 The objective of this project is to unify and standardize the   development of the railway infrastructure in the area, allowing
                 ERTMS control centers on all high-speed lines in the north-  for a greater frequency and quality of passenger transport.
                 west region, including the continuity and automation of the
                 process of applying temporary speed restrictions.  TECHNICAL ASSISTANCE FOR THE CONTROL AND SU-
                                                                   PERVISION  OF THE  EXECUTION  OF THE  WORKS FOR
                 This will improve not only the operation of ERTMS, but also its   THE COMPREHENSIVE IMPROVEMENT OF THE HUESCA-
                 maintenance, as real-time information on the status of operati-  CANFRANC LINE. CANFRANC-CANFRANC BRANCH LINE
                 ons will be available at local and backup centers on all lines.  (L-204).

                                                                   The objective of this project is the comprehensive improve-
                 Consultrans is the expert consultancy that Adif has entrusted   ment of the Huesca-Canfranc line (L-204), on the Ayerbe-Can-
                 with ensuring that this project is carried out in accordance   franc section. This project is essential to strengthen cross-bor-
                 with the requirements of reliability, availability, maintaina-  der connectivity between Spain and France, boosting freight
                 bility and safety (RAMS and Regulation 402), as well as the   transport and regional economic development.
                 highest levels of cybersecurity and interoperability, through
                 Installation of the new equipment.                The project includes significant improvements to the railway
                 Detailed engineering for the specification, design, develop-  signaling and control systems and the telecommunications
                 ment and configuration of the ERTMS Unified Control Center   network, including: interlockings and signal blocks, LED light
                 (CCUE), as well as the performance of functional validation   signals, train protection systems, level crossing protection,
                 tests and the verification of the installations in each of the pro-  Centralized Traffic Control (CTC), fiber optics, IP network and
                 visional and definitive situations.               GSM-R mobile network.
                 Adaptation of the current maintenance processes (Service Le-
                 vel Agreements - SLAs, penalties and KPIs).       TECHNICAL ASSISTANCE FOR PROJECT DESIGN, CON-
                 Planning of training activities aimed at training Adif/Adif AV staff in   TROL AND SUPERVISION OF TELECOMMUNICATIONS
                 the use and operation of the new ERTMS Unified Control Center.  WORKS. LOT 2: CENTRAL, SOUTHERN AND EASTERN
                                                                   GEOGRAPHICAL AREA




       332                                                     Anuario del Ferrocarril 2026 Spanish Railway Yearbook
   329   330   331   332   333   334   335   336   337   338   339