company guide some Media and Larga Distancia services of Renfe Operadora. TECHNICAL ASSISTANCE FOR THE CONTROL AND SU-
It also includes the transformation of the current track 10C for
PERVISION OF THE EXECUTION OF THE WORKS FOR THE
PROVISION OF AUTOMATIC BLOCKING DEVICES FOR
the use of the regular services of line C-5 (Móstoles-El Soto -
THE DUAL CARRIAGE OF THE R3 LINE OF THE BARCELO-
Atocha - Fuenlabrada - Humanes), eliminating its status as a
NA SUBURBAN RAILWAY ON THE PARETS DEL VALLÉS -
siding, as well as modifications to the existing points tracks at
LA GARRIGA
the southern end of the station.
The objective of the project is to equip the Parets del Vallès-
The signaling works will consist of the modification of the
field elements, as well as the adaptation of the existing interior
with the Automatic Blocking System (ABS), and adapt it to the
equipment in the cab and the necessary modifications to the
ENCE, PLO and CTC. These works will be carried out in coor-
planned doubling of the line.
dination with the track project. La Garriga section of the Barcelona R3 suburban railway line
It includes the modification of the existing electronic interlok-
kings, the installation of new LED signals, the complete rene-
The technical assistance work will ensure that the works are wal of the track circuits with audio frequency technology and
carried out in accordance with current quality, safety and ASFA digital equipment.
environmental regulations. It will also include the review of
technical documents, quality control, supervision of the dif- It also includes the adaptation of telecommunications systems
ferent phases of construction and, finally, the commissioning through new permanent fiber optic lines, IP equipment, and
and handover of the facilities to the corresponding mainte- the integration of video surveillance and object detection sy-
nance department. stems.
TECHNICAL ASSISTANCE FOR THE DEVELOPMENT AND IM- This project is part of the track doubling works aimed at im-
PLEMENTATION OF A UNIFIED CONTROL CENTRE FOR ERTMS proving the capacity and efficiency of the rail service on this
(CCUE) AND ADAPTATION OF EXISTING FACILITIES AND EQUIP- important regional link. The geographical location of the sec-
MENT ON HIGH-SPEED LINES IN THE NORTH-WEST REGION tion, in the province of Barcelona, Catalonia, is key to the
The objective of this project is to unify and standardize the development of the railway infrastructure in the area, allowing
ERTMS control centers on all high-speed lines in the north- for a greater frequency and quality of passenger transport.
west region, including the continuity and automation of the
process of applying temporary speed restrictions. TECHNICAL ASSISTANCE FOR THE CONTROL AND SU-
PERVISION OF THE EXECUTION OF THE WORKS FOR
This will improve not only the operation of ERTMS, but also its THE COMPREHENSIVE IMPROVEMENT OF THE HUESCA-
maintenance, as real-time information on the status of operati- CANFRANC LINE. CANFRANC-CANFRANC BRANCH LINE
ons will be available at local and backup centers on all lines. (L-204).
The objective of this project is the comprehensive improve-
Consultrans is the expert consultancy that Adif has entrusted ment of the Huesca-Canfranc line (L-204), on the Ayerbe-Can-
with ensuring that this project is carried out in accordance franc section. This project is essential to strengthen cross-bor-
with the requirements of reliability, availability, maintaina- der connectivity between Spain and France, boosting freight
bility and safety (RAMS and Regulation 402), as well as the transport and regional economic development.
highest levels of cybersecurity and interoperability, through
Installation of the new equipment. The project includes significant improvements to the railway
Detailed engineering for the specification, design, develop- signaling and control systems and the telecommunications
ment and configuration of the ERTMS Unified Control Center network, including: interlockings and signal blocks, LED light
(CCUE), as well as the performance of functional validation signals, train protection systems, level crossing protection,
tests and the verification of the installations in each of the pro- Centralized Traffic Control (CTC), fiber optics, IP network and
visional and definitive situations. GSM-R mobile network.
Adaptation of the current maintenance processes (Service Le-
vel Agreements - SLAs, penalties and KPIs). TECHNICAL ASSISTANCE FOR PROJECT DESIGN, CON-
Planning of training activities aimed at training Adif/Adif AV staff in TROL AND SUPERVISION OF TELECOMMUNICATIONS
the use and operation of the new ERTMS Unified Control Center. WORKS. LOT 2: CENTRAL, SOUTHERN AND EASTERN
GEOGRAPHICAL AREA