The design of projects and technical assistance in telecommu-  recently completed or ongoing projects, the following stand
               nications works is being carried out for the important invest-  out:
               ments that Adif is making in a plan whose precedents go back
               decades with the design and deployment of the first railway   Detailed Engineering for the Coronel-Lota Railway Service
               radio, fiber optic, transmission and IP networks:  Consultrans will execute the Basic and Detailed Engineering
               Elimination of telephone blocks to minimize the risk of human   for the extension of the railway service between Coronel and   guía de empresas
               error: more than 3,500 km of network where it is planned to   Lota, comprehensively addressing  all railway, non-railway,
               renovate interlockings, drives, signals and detection systems,   and  civil  works  specialties  necessary  to  enable  future  pas-
               to provide them with automatic blocking and remote control   senger operations. Our work includes the gathering and va-
               in CTC, and which requires new telecommunications net-  lidation of design criteria, the preparation and processing of
               works, both fixed (fiber, transmission and IP) and GSM-R.  the Environmental Impact Study until obtaining a favorable
               Renewal of the signaling and power remote controls to redun-  Environmental Qualification Resolution, and the coordinated
               dant architectures without single point of failure in the remote   development of engineering at its various levels. This also
               controls and in the control centers, and accessible on the net-  incorporates the background information required for expro-
               work for the operators.                          priations, land relocations, and sector-specific permits, all in
               Improvement of telecommunications, which includes actions   strict compliance with EFE standards and current and future
               such as renewal of recorders and operational telephony, ob-  operating conditions for freight and passengers.
               solete power and transmission equipment, deployment of heat
               detectors or the new operational IP network.     Based on our experience and methodology, we also integrate
               Deployment and renovation of physical telecommunications   interference management, coordination between specialties
               infrastructure, thousands of miles of fiber optic cable where   and third parties, the definition of the work plan and construc-
               it was deteriorating, where there was copper, or where there   tability, the preparation of the official budget, and the social
               was a need for new services.                     and private evaluation required by the Ministry of Social De-
               Projects for the implementation of the cybersecurity plan in   velopment. The specialties covered by the project include:
               the telecommunications network, separation of networks, IDS/  Railway Engineering, Non-Railway Engineering, Civil Works,
               IPS, firewalls, IAM, probes, TLS/SSL, MFA, antivirus, SIA/SIEM,   Signaling and Interlocking Systems, Railway Telecommunica-
               etc.                                             tions, Operational Support Systems, Command and Superviso-
               Deployment of GSMR for ERTMS required by Europe for com-  ry Control System (SCADA/CTC), Expropriations, Eradications
               muter and mainline rail hubs.                    and Resettlements, Sectoral Permits, Interference Treatment,
               Deployment of the FRMCS network (Rail 5G), which will re-  Works Plan and Constructability, Project Budget, Social and
               place the current radio systems (PMR, Tetra, Train-to-Ground   Private Evaluation.
               or GSM-R).
                                                                TECHNICAL INSPECTION SERVICE FOR THE CONSTRUC-
               International                                    TION OF RAILWAY WORKS AND COMPLEMENTARY
               Latino America – Chile                           WORKS FOR THE SANTIAGO – BATUCO TRAIN PROJECT,
               Consultrans in Chile continues to consolidate its growth as   MAPOCHO – BATUCO SECTION
               part of its strategic commitment to the region. The national
               staff has been expanded, incorporating new specialties into   Consultrans is part of the contract for the Technical Inspec-
               the local team. In addition to projects for our main client, Em-  tion of the Santiago-Batuco Train, Mapocho–Batuco section,
               presa Ferrocarriles del Estado (EFE), we have added private   with the objective of verifying, supervising and ensuring
               clients, with projects of various kinds, as well as providing   that all works executed by the Contractor are developed in
               support to other Consultrans offices in other countries.  accordance with the plans, technical specifications, current
               Chile continues to invest in rail, generating significant invest-  regulations and scope defined in the Santiago–Batuco Train
               ments for the coming years. These include new commuter li-  project. This includes a comprehensive review of the railway,
               nes in Santiago (Melipilla and Batuco), the extension of the   civil, road, hydraulic, electrical, and architectural works, en-
               Coronel-Lota line, tram systems in various regions, and future   compassing everything from the railway platform, drainage,
               extensions of the Santiago Metro, including the future connec-  pipelines, retaining walls, and containment structures, to track
               tion to Santiago Airport. New freight rail connections to ports,   construction, installation of the electric traction system, sta-
               such as the Mega Port of San Antonio, and the various new   tions, maintenance centers, train sheds, and grade-separated
               services throughout Chile being reactivated by EFE, lead us to   vehicular and pedestrian crossings.
               anticipate a high level of activity for our company. Among the