Page 333 - Anuario FFCC - 2026
P. 333
BASIC DESIGN AND CONSTRUCTION PROJECT FOR THE Coordination of the works with the existing electrical substa-
RENOVATION OF PASAIA STATION (GUIPÚZCOA) tion on the site, developing integrated solutions within the
The aim of the project is to study alternatives for the renovati- project.
on of the current Pasaia Station building, which is unused and Reconfiguration of the surrounding urban areas and of the ve-
in a poor state of repair, as well as the railway yard that serves hicular and pedestrian accesses.
the C-1 San Sebastián and Media Distancia Irún/Vitoria lines. Construction of a new underpass with the necessary vertical guía de empresas
communication cores and access points.
The project includes, on the one hand, architectural integra- Upgrade and adaptation of the platforms to the new track lay-
tion into the environment, compliance with accessibility pa- out and the general renovation of the station.
rameters, improvement of pedestrian flows and integration of
the current track. Meanwhile, the Project for the renovation of La Garena and
It also includes the replacement of the current level crossing Soto del Henares halt will involve the following construction
between the side platform and the central platform, which se- works:
parates the main tracks 1 and 2 from the other 13 tracks, with
a pedestrian walkway. At La Garena Halt:
Modification of the current track layout: removal of track 5
The central platform will be rebuilt and its dimensions will be and installation of a new track south of the current track 2,
extended to a length of 120 meters in order to comply with and construction of transitions at both ends to connect the
current regulations. As far as the action on the tracks is con- four-track layout with the existing configuration.
cerned, it will be necessary to eliminate the current track 3 to Development of Noise studies and implementation of protec-
accommodate the extension of the platform and to remodel tive measures for nearby residential areas
track 5, while maintaining its functionality.
At Soto del Henares Halt:
The project will be designed using BIM methodology, inclu- Construction of a new platform between tracks 1 and 3 to
ding 3D and 4D models of the planned works. serve trains bound for Madrid, with direct access from the exi-
CONSTRUCTION PROJECTS FOR THE RENOVATION OF sting platform’s next to track 1.
ALCALÁ DE HENARES STATION AND LA GARENA AND Resolution of the difference in levels between the two plat-
SOTO DEL HENARES HALTS. forms via an underpass or external connections.
Decommissioning of the current platform on track 2, as the
Forming part of the “Henares railway Corridor”, the project outer tracks will be used for freight trains and commuter trains
aims to increase capacity and improve operations on the C-2, without stopping.
C-7 and C-8 commuter lines currently serving from Atocha, Inspection of the superstructure and renovation if necessary
reducing interference with medium-distance lines, to gua- The projects will be developed using BIM methodology and
rantee a more reliable service for the public. will include 3D and 4D models of the planned works.
Once the solutions analyzed in the alternatives study and the TECHNICAL ASSISTANCE FOR THE CONTROL AND SU-
proposed route have been validated and selected, two separa- PERVISION OF THE CONSTRUCTION PROJECT WORKS
te projects will be developed. ON THE SAFETY INSTALLATIONS AFFECTED BY THE IM-
PLEMENTATION OF THE 4+4+2 SCHEME AT ATOCHA CER-
The Project for the renovation of Alcalá de Henares station CANÍAS STATION
will define the reconfiguration of the track yard and upgrade
of the platforms to eliminate crossings and improve operatio- The objective of this project is to modify the signaling and
nal capacity, as well as the regrouping of tracks running in telecommunications installations affected by the track works
the same direction in order to relieve congestion and clarify to be carried out at Atocha Cercanías station, focusing speci-
access to the station and the urban pedestrian crossing over fically on the impact on the safety installations resulting from
the track yard. the implementation of the 4+4+2 track scheme.
With regard to the station’s building and architectural aspects, The current track 8C at Atocha Cercanías will be made avai-
the project will include the following works: lable for the parking of trains coming from or going to the Sol
Construction of a new kiosk on the north side, creating a se- Tunnel (Atocha - Sol - Nuevos Ministerios - Chamartín), used
condary entrance hall opposite the existing car park. by the C-3 and C-4 lines of Cercanías de Madrid, as well as
Spanish Railway Yearbook 2026 Anuario del Ferrocarril 331

