Page 349 - Anuario FFCC - 2026
P. 349

General Manager of Cosfesa and member of the Management   and Central High-Speed Network. (Scope of the Olmedo and
               Board of Grupo Ortiz: Alejandro Laca García      Villada operational bases).
                                                                The area which this service is provided is the High-Speed
               Main products and services:                      railway access to the North and North-West railway corri-
               Construction, Modification and Maintenance Works on Rail-  dor of Spain, linking the cities of Madrid, Segovia, Vallado-
               way  Track Layouts  and associated  Infrastructures: track  as-  lid, Palencia, León, and Burgos, with special infrastructures   guía de empresas
               semblies, railway stations, maintenance, renewal, platform,   such as the Guadarrama and San Pedro tunnels, viaducts,
               structures, on High-Speed   Lines, Conventional Network and   and all kinds of structures, along 441.31 km of the general
               Metric Gauge Network.                            track line, managed from the Olmedo (182.771 km) and
                                                                Villada (258.541 km) headquarters. Preventive mainte-
               Top products: MAINTENACE: 1. Construction and Mainte-  nance is carried out for surveillance, data evaluation, dia-
               nance of Infrastructure and Superstructure on High-Speed   gnosis and programming of short, medium, and long-term
               Lines, Conventional Network and Metric Gauge Network   interventions, corrective maintenance acting immediately
               throughout the country. TRACK: 2. Infrastructure and track   in incidents and improvement actions increasing the value
               renewal works on the Guillarei Station-Redondela Station   of assets, and upgrading the safety, reliability, and comfort
               section. Line 810.                               from the service in the long term.

               Activities in the year:                          Track assembly works for the North-Northwest High-Speed
               A selection of the projects under execution of COSFESA is in-  Corridor. Madrid-Galicia High Speed   Line and Maintenance.
               cluded below.                                    Lot 1: Track assembly. Line section: Olmedo-Pedralba de la
                                                                Pradería.
               Infrastructure and track maintenance for ADIF conventional   The remaining works consists of doubling the track (64 km)
               and metric gauge lines. 6 Lots. Lot 1: Northwest.  on the existing railway platform between Medina del Cam-
               The area where this service is provided is the Conventional   po and Coreses, completing the assembly of 1,435 mm wide
               Railway Network belonging to the regional headquarters of   double track between Olmedo and Pedralba de la Pradería,
               León, Ourense, and Salamanca, with 2,908.26 km of track   in a 197.495 km long, in addition to the rail links in Olmedo,
               and the 896.31 km of the Northwest Metric Gauge lines.  Valladolid and Medina del Campo in a 24.60 km long.
               Cyclic maintenance activities are carried out (infrastruc-  The service involves maintenance of the infrastructure (plat-
               ture  and track  inspections and  adjustments,  checks, track   form), track (and switches), as well as the maintenance of buil-
               cleaning), maintenance activities according to the condition,   dings (offices, warehouses, workshops) and other facilities of
               derived from periodical infrastructure and track inspections or   the La Hiniesta headquarter and other locations.
               incidents and infrastructure improvement actions.
                                                                Construction works for the comprehensive renewal of in-
               Infrastructure, track and turnouts maintenance in High-  frastructure and track on the Monforte de Lemos - Chapela
               Speed Lines in Galicia and the High-Speed Atlantic Axis.   junction line. Section: Guillarei station - Redondela station.
               (Scope of the Irixo and A Mezquita operational bases).  The works are being carried out on the section of line 810 bet-
               The service is provided on the Pedralba de la Pradería-Ou-  ween k.p. 141+800, close proximity to Guillarei station and
               rense, Ourense-Santiago, and Vigo Urzaiz-A Coruña High   k.p. 165+300, in the vicinity of Redondela station, including
               Speed lines, with special infrastructures such as the Maceiras,   Louredo-Valos station.
               Bolaños and Espiño tunnels, Teixeiras and Río Ulla (HSL and   The scope of the contract involves the renewal of the track
               CL) viaducts and all kinds of structures, along 665 km of the   superstructure and the necessary interventions on the infra-
               general track line, managed from the Irixo and A Mezquita   structure (structures and earthworks) to enable the future im-
               headquarters.                                    plementation of 25 kV AC electrification.
               Preventive maintenance activities are carried out on infra-  Works include the replacement of sleepers, rails, ballast (in
               structure, track, switches and headquarters, corrective main-  excavation zones), and turnouts at Valos Station. Slab track
               tenance responding to incidents by providing relief to affected   is installed within tunnels and on the new viaduct over the
               trains and small maintenance activities leading to an impro-  N-550 road. The project also includes excavation and repair
               vement in the value of assets, safety, reliability, and comfort   works in the four existing tunnels, as well as an enlargement
               from the service.                                of the cross section in the Valos tunnel to increase the gauge.
                                                                Stabilization works are carried out on cuttings and embank-
               Infrastructure, track, and turnouts maintenance of the North   ments, along with the repair and improvement of underpasses




            Spanish Railway Yearbook 2026 Anuario del Ferrocarril                                              347
   344   345   346   347   348   349   350   351   352   353   354