General Manager of Cosfesa and member of the Management and Central High-Speed Network. (Scope of the Olmedo and
Board of Grupo Ortiz: Alejandro Laca García Villada operational bases).
The area which this service is provided is the High-Speed
Main products and services: railway access to the North and North-West railway corri-
Construction, Modification and Maintenance Works on Rail- dor of Spain, linking the cities of Madrid, Segovia, Vallado-
way Track Layouts and associated Infrastructures: track as- lid, Palencia, León, and Burgos, with special infrastructures guía de empresas
semblies, railway stations, maintenance, renewal, platform, such as the Guadarrama and San Pedro tunnels, viaducts,
structures, on High-Speed Lines, Conventional Network and and all kinds of structures, along 441.31 km of the general
Metric Gauge Network. track line, managed from the Olmedo (182.771 km) and
Villada (258.541 km) headquarters. Preventive mainte-
Top products: MAINTENACE: 1. Construction and Mainte- nance is carried out for surveillance, data evaluation, dia-
nance of Infrastructure and Superstructure on High-Speed gnosis and programming of short, medium, and long-term
Lines, Conventional Network and Metric Gauge Network interventions, corrective maintenance acting immediately
throughout the country. TRACK: 2. Infrastructure and track in incidents and improvement actions increasing the value
renewal works on the Guillarei Station-Redondela Station of assets, and upgrading the safety, reliability, and comfort
section. Line 810. from the service in the long term.
Activities in the year: Track assembly works for the North-Northwest High-Speed
A selection of the projects under execution of COSFESA is in- Corridor. Madrid-Galicia High Speed Line and Maintenance.
cluded below. Lot 1: Track assembly. Line section: Olmedo-Pedralba de la
Pradería.
Infrastructure and track maintenance for ADIF conventional The remaining works consists of doubling the track (64 km)
and metric gauge lines. 6 Lots. Lot 1: Northwest. on the existing railway platform between Medina del Cam-
The area where this service is provided is the Conventional po and Coreses, completing the assembly of 1,435 mm wide
Railway Network belonging to the regional headquarters of double track between Olmedo and Pedralba de la Pradería,
León, Ourense, and Salamanca, with 2,908.26 km of track in a 197.495 km long, in addition to the rail links in Olmedo,
and the 896.31 km of the Northwest Metric Gauge lines. Valladolid and Medina del Campo in a 24.60 km long.
Cyclic maintenance activities are carried out (infrastruc- The service involves maintenance of the infrastructure (plat-
ture and track inspections and adjustments, checks, track form), track (and switches), as well as the maintenance of buil-
cleaning), maintenance activities according to the condition, dings (offices, warehouses, workshops) and other facilities of
derived from periodical infrastructure and track inspections or the La Hiniesta headquarter and other locations.
incidents and infrastructure improvement actions.
Construction works for the comprehensive renewal of in-
Infrastructure, track and turnouts maintenance in High- frastructure and track on the Monforte de Lemos - Chapela
Speed Lines in Galicia and the High-Speed Atlantic Axis. junction line. Section: Guillarei station - Redondela station.
(Scope of the Irixo and A Mezquita operational bases). The works are being carried out on the section of line 810 bet-
The service is provided on the Pedralba de la Pradería-Ou- ween k.p. 141+800, close proximity to Guillarei station and
rense, Ourense-Santiago, and Vigo Urzaiz-A Coruña High k.p. 165+300, in the vicinity of Redondela station, including
Speed lines, with special infrastructures such as the Maceiras, Louredo-Valos station.
Bolaños and Espiño tunnels, Teixeiras and Río Ulla (HSL and The scope of the contract involves the renewal of the track
CL) viaducts and all kinds of structures, along 665 km of the superstructure and the necessary interventions on the infra-
general track line, managed from the Irixo and A Mezquita structure (structures and earthworks) to enable the future im-
headquarters. plementation of 25 kV AC electrification.
Preventive maintenance activities are carried out on infra- Works include the replacement of sleepers, rails, ballast (in
structure, track, switches and headquarters, corrective main- excavation zones), and turnouts at Valos Station. Slab track
tenance responding to incidents by providing relief to affected is installed within tunnels and on the new viaduct over the
trains and small maintenance activities leading to an impro- N-550 road. The project also includes excavation and repair
vement in the value of assets, safety, reliability, and comfort works in the four existing tunnels, as well as an enlargement
from the service. of the cross section in the Valos tunnel to increase the gauge.
Stabilization works are carried out on cuttings and embank-
Infrastructure, track, and turnouts maintenance of the North ments, along with the repair and improvement of underpasses