company guide > Metro and Metropolitan Infrastructures. Spain. (CONTRATAS Y SERVICIOS FERROVIARIOS, S.A.U.)
Maintenance of the Madrid Metro. The maintenance work
includes, among other tasks, the replacement of track devices,
substitution of the existing slab-track systems with new ones,
renewal of rail and sleepers, and geometric track corrections.
The scope of this maintenance service covers approximately
COSFESA
35% of the Madrid Metro network.
Renovation of Line 6 of the Madrid Metro (Lot 1). Complete
renovation of the track superstructure on an 11.5 kilometres
section. The existing types of tracks will be replaced with the
C/Ramón Cabanillas 2-B, local 2.
latest state-of-the-art slab track, and the existing rail and coun- Dirección postal / Postal address:
ter-rail will also be renewed. 32004 - Ourense. España
Teléfono: +34 988 23 15 61
> Metro and Metropolitan Infrastructures. International. Email: cosfesa@grupoortiz.com
Web: www.grupoortiz.com
Adaptation of the Mondego Mobility System in Coimbra to
a BRT-Metrobus solution. Coimbra B - Portagem section.
Portugal. Execution of the Metrobus corridor and surrounding Descripción:
streets along a 1.8 kilometres section, developed mainly on COSFESA es una empresa especializada en la Construcción y
the existing railway platform. Mantenimiento de Infraestructura ferroviaria y Superestructura
de vía, (Renovación, Rehabilitación y Montaje de vía y apa-
Construction of the machinery depot and offices of the Mon- ratos de vía,…). Ha obtenido, además, la licencia de Empresa
dego Mobility System (Coimbra). Portugal. Ferroviaria. Con una experiencia de 40 años en el sector ferro-
viario, COSFESA posee un importante parque de maquinaria
Rubí Line of the Porto Metro. New metro line with a total y cuenta con una amplia plantilla totalmente especializada.
length of 6.3 kilometres, running between Casa da Música
(Porto) and Santo Ovídio (Vila Nova de Gaia) stations. The Equipo directivo:
project includes the construction of three surface stations, five Comité de Dirección:
underground stations, a 500-space car park, a connection to Presidente Ejecutivo: Juan Antonio Carpintero López
the Devesas railway station, and the construction of several Consejero Delegado: Javier de la Mata Medina
viaducts and underpasses for vehicles and pedestrians. A high- Vicepresidenta Ejecutiva: Sara Carpintero Grande
light of the project is the construction of a new bridge over Secretario General: Juan Luis Domínguez Sidera
the River Douro, to be named which will be called “Ponte da Director General Sostenibilidad y Transformación Digital:
Ferreirinha”. Carlos Bárcena Martín
Director de Concesiones: Carlos Carpintero Grande
Certifications: Director de Concesiones y Tesorería: Alberto de la Fuente
Quality System Certificate: AENOR Certificate for ISO 9001. Sanz
Environmental Management System Certificate: AENOR Cer- Directora Económico Financiera: María Carpintero Grande
tificate for ISO 14001. Director General de Infraestructuras: José Antonio Nacarino
Occupational Risk Prevention Certificate: Bureau Veritas Cer- Muriel
tificate for ISO 45001:2018. Director General de Cosfesa y vocal del comité de dirección
BIM Information Management Certificate: AENOR Certificate de Grupo Ortiz: Alejandro Laca García
for ISO 19650-1/2.
Principales productos y servicios:
Realización de Obras de Construcción, Modificación y Man-
tenimiento de Trazados de Vía Ferroviaria e Infraestructuras
asociadas: montajes de vía, estaciones, mantenimientos, re-
novaciones, plataforma, estructuras, en Líneas de Alta Veloci-
dad, Red Convencional y Red de ancho Métrico.