65-kilometre section of the Madrid–Seville High-Speed Line.  scope of the contract, covering 276 kilometres of single track.
                                                                In addition, pre-maintenance is included on the non-operatio-
               Comprehensive renewal of track and superstructure on   nal sections where track has already been installed.
               conventional line 810. Guillarei–Redondela section (Ponte-
               vedra). Renewal of nearly 25 kilometres of track, including   New Reus-Bellisens Station (Tarragona). Construction of the
               works on the track superstructure (renewal of sleepers, rail and   new Reus Station, including a new station building and two   guía de empresas
               turnouts), track-bed lowering and construction of new forma-  220-metre-long side platforms connected by an accessible
               tion, interventions on existing structures and construction of   underpass equipped with lifts and fixed stairways. The project
               new ones, improvement treatments on cuttings, embankments   also includes a new pedestrian underpass and access routes
               and drainage systems, architectural works at stations, repair   from both sides of the city to connect with the station, as well
               works in tunnels, and track-bed lowering to adjust the clearan-  as urban development of the surrounding area through a new
               ce envelope.                                     square integrating these access points.
                                                                Emergency works on the C3 suburban line in Valencia fol-
               Comprehensive track renewal on the Villalonquéjar branch   lowing the October 2024 DANA. Execution of repair works
               line (Burgos). Renewal of 7.7 kilometres of single track on   on the infrastructure, superstructure and auxiliary installations
               the branch line connecting the Villalonquéjar industrial estate   affected along the Valencia Sant Isidre – Cheste section of
               with Line 100 between Madrid and Hendaye.        Valencia’s C3 Cercanías line as a result of the October 2024
                                                                DANA. The section includes six stations and 22.8 kilometres
               Elimination of two level crossings in Ourense on conventio-  of track, where works include the clearance and removal of
               nal line 810 (Monforte de Lemos–Vigo) and two in Asturias   debris, construction of access roads and auxiliary work areas,
               on metric-gauge Line 744 (Baiña–Collanzo).       renewal of infrastructure and track superstructure, repairs to
                                                                stations and platforms, slope stabilisation, and construction of
               Maintenance of conventional railway lines within ADIF’s   longitudinal and cross-drainage works.
               Northern and Central Sub-directorates.  Track and turnout
               maintenance  in  the  Northern  and  Central  Sub-directorates,   > Railways. International.
               covering nearly 5,800 kilometres of track and approximately   Modernisation of the Western Line: Torres Vedras-Caldas
               4,200 turnouts.                                  da Rainha subsection. Portugal. The main works include the
                                                                realignment of several curves along the railway route, electri-
               Maintenance services for infrastructure, track and turnouts   fication of the line, and interventions at six stations and three
               on the Madrid–Northeast High-Speed Line. Lot 2: Montagut,   halts, including the construction of passenger platforms with
               Vilafranca and Sant Feliu bases. Preventive maintenance of   minimum lengths of 150 metres and technical rooms to house
               infrastructure, track, turnouts and buildings; corrective main-  command-and-control and telecommunications equipment.
               tenance (incident response and application of contingency   Modernisation of the Western Line: Mira Sintra-Meleças-Tor-
               plans); and improvement and investment works on the assets   res Vedras section. Portugal. Modernisation of 43.4 kilome-
               within the scope of the contract, covering 317 kilometres of   tres of line, including the construction of two railway turnouts
               double track.                                    with a combined length of 16 kilometres, improvement works
                                                                at stations and halts, reorganisation of level crossings and
               Maintenance services for infrastructure, track and turnouts   overpasses, full electrification of the section, and the installa-
               on the Madrid–South High-Speed Line. Lots 2 and 3: Hor-  tion of electronic signalling and telecommunications systems.
               nachuelos and Antequera bases. Preventive maintenance of
               infrastructure, track, turnouts and buildings; corrective main-  Renewal of the Leixões Line (Matosinhos, Portugal). The ob-
               tenance (incident response and application of contingency   jective of the project is to increase the traffic capacity of the
               plans); and improvement and investment works on the assets   line, which is key for connections with the Port of Leixões, en-
               within the scope of the contract, covering 432 kilometres of   abling the operation of trains up to 750 metres in length. The
               double track.                                    works include extending the usable lengths at stations, reor-
               Maintenance and pre-maintenance of infrastructure, track   ganising the reception and dispatch track yards at the Leixões
               and turnouts on the Plasencia–Badajoz High-Speed Line: Mé-  Terminal, renewal and adaptation of the overhead line equip-
               rida and Cáceres bases. Preventive maintenance of infrastruc-  ment, drainage systems, and signalling and telecommunicati-
               ture, track, turnouts and buildings; corrective maintenance   ons systems, as well as the elimination of level crossings and
               (incident response and application of contingency plans); and   various interventions in technical buildings.
               improvement and investment works on the assets within the