company guide  and the replacement of an existing steel viaduct with a new   162.70 respectively, on RFIG Line 430 (Bif. Córdoba Mercan-

                 concrete structure.
                                                                   cías-Los Prados, Córdoba-Málaga line).
                                                                   At Aljaima station, tracks 3 and 4 are being renewed by repla-
                                                                   cing ballast, sleepers, and rails, where new formation layers
                 Track renewal works on the section Ourense-Monforte de
                 Lemos. Line 810.
                                                                   are also being installed. Additionally, 4 expansion joints and
                 The works are being carried out on the section of line 810 bet-
                                                                   6 type “A” turnouts are being removed and replaced with type
                 ween k.p. 0+400 of Monforte station and k.p. 45+563 before
                                                                   “P” and “C”.
                 reaching Ourense station, including Canabal, San Estevo do
                                                                   At Pizarra station, tracks 2 and 4 are undergoing ballast and
                 Sil, Os Peares and Barra de Miño stations.
                                                                   undergoing full superstructure renewal, including new for-
                 The project consists of actions on the track superstructure with
                 the purpose of modernizing the facilities and changing the
                                                                   mation layers in specific sections. Nine expansion joints are
                 electrification from 3kVDC to 25kV AC, which will allow the   sleeper renewal, while track 3 and the electric shed track are
                                                                   being removed, and 6 type “A” turnouts are being replaced
                 connection of Monforte de Lemos with the High-Speed Net-  with types “P” and “C”.
                 work in Ourense. It will also be carried out the rehabilitation   Works also include the adaptation of the existing overhead
                 and updating of the rest of the elements of the route to adapt it   line equipment (OLE) in affected areas, alongside necessary
                 to the new operating conditions. To this end, ballast renewal,   adjustments to signalling and safety installations.
                 replacement of sleepers, rails, turnouts in stations and 43 level
                 crossings will be carried out.                    Renewal works of auxiliary tracks at Las Fraguas station.
                                                                   The works under this contract involve the renewal of tracks 1,
                 Complete renewal of track in the Gijón-Laviana line of the   3 and 4 (1,826 m) at Las Fraguas station and the replacement
                 Metric Gauge Network in Asturias.                 of turnouts 5 and 6 by type C ones, in addition to the asphalt
                 Included in the Asturias Metric Gauge Network, the section to   level crossing by Strail system.
                 be worked on, runs between Gijón-Sanz Crespo Station and   The works involve the dismantling of the existing track com-
                 Laviana along 49 km, where the track will be completely re-  ponents, ballast excavation, subgrade rehabilitation, installati-
                 newed (ballast, sleepers, rails, switches) and the infrastructure   on of geotextile, and reassembly of the track over new ballast,
                 will be improved with actions on the platform, tunnels, slopes,   including turnouts and the level crossing. Additionally, the
                 and level crossings.                              bridge deck over the Llares River is waterproofed, and an anti-
                                                                   vibration mat is installed prior to the placement of the track
                 Track rehabilitation: Mataporquera - Torrelavega section.   superstructure. All these interventions will require adjustments
                 Phase II.                                         to the overhead catenary system and railway signaling and
                 The scope of works consists of the renewal of several track   safety installations.
                 sections on RFIG Line 160 (Palencia-Santander), between
                 Mataporquera station (k.p. 407+108) and Torrelavega station   Rail and sleeper replacement works between K.P. 1/260 and
                 (k.p. 485+072). This is an electrified single-track line serving   81/600, of the section Castejón de Ebro - Irun Division Limit.
                 the Santander C-1 regional rail network.          Line 700, Casetas - Bilbao.
                 The works include the replacement of sleepers and rails, as   The works span an 80.34 km section between Castejón de
                 well as the upgrade of 8 type “A” S&C units to type “C” at   Ebro and Fuenmayor stations, on ADIF’s intermodal Abando
                 Lantueno, Pesquera, Cobejo, Bárcena, and Las Fraguas sta-  Indalecio Prieto - Casetas line 700 (RFIG line 700, Bilbao -
                 tions. It also involves the superstructure rehabilitation of the   Casetas). It runs through the municipalities of Castejón de Ebro
                 steel bridge on the approach to Los Corrales de Buelna, ballast   and Lodosa, in Navarra, and Alfaro, Rincón de Soto, Calahor-
                 cleaning over a 160 m section, track slewing in two sections   ra, Alcanadre, Arrúbal, Agoncillo, Logroño and Fuenmayor,
                 (400 m and 720 m long), the renewal of 9 level crossings and   in La Rioja.
                 59 rail lubricators along the alignment, and the implementati-  The existing RS sleepers and pre-1973 UIC 54 rail, are re-
                 on of minor drainage features.                    placed by mono-block sleepers and new UIC 54 rails at va-
                                                                   rious kilometer points along the section and 8 level crossings
                                                                   will be renovated.
                 Construction works for the replacement of type “A” S&C   Additional works include cleaning of ditches and trackside
                 units and track material renewal at Pizarra and Aljaima sta-  areas,  and  the  construction  of  a  ballast-retaining  wall  over
                 tions. Córdoba – El Higuerón to Los Prados Junction Line.  over a driven rails system.
                 The works consist of replacing S&C units and renewing seve-  Associated works include the adjustment of signalling and
                 ral tracks at Aljaima and Pizarra stations, at k.p. 169.50 and   communication systems.