Parla Norte New Railway Station (Madrid). Railway permeability improvement works on the Palencia
This project involves the construction of Parla Norte station – A Coruña line in O Barco de Valdeorras (Ourense)
on the existing C-4 suburban network. Designed for future A new underpass is being constructed beneath the access
scalability, the new station will function as an interchange, turnout to O Barco de Valdeorras Station on the Palencia –
providing direct connectivity with the upcoming urban tram A Coruña line at KP 297+950, connecting Rúa da Rampa
extension. and Rúa Ramón y Cajal at the junction with Rúa Xirimil. guía de empresas
The passenger terminal comprises three interconnected sin- This underpass is designed for vehicular traffic, while the
gle-story modules (885.84 m2), visually unified by a canopy existing structure will be repurposed for pedestrian.
made with structural metal ribs and tubular Y-shaped pillars The structure consists of a cast-in-situ reinforced concre-
is included. Two platforms will be built, one on each side of te box, measuring 10 m (length) x 8 m (width) x 3.074 m
the 210 m long railway platform, 110 m covered by a metal (height). The roadway comprises a two-lane carriageway
canopy and an underpass for communication between plat- with 3 m-wide lanes and 1 m shoulders.
forms through under-track jacking, service connections and The scope of works entails the installation of two micropile
urbanization. Adapting the current track alignment to the new walls, reinforced concrete retaining walls, and provisional
station, given its curved geometry, requires adjustments along shoring of cabling and track to maintain uninterrupted rail
a 938 m section, alongside modifications to the electrification service throughout the project. Additionally, the works in-
and Control, Command and Signalling (CCS) systems to suit clude ballast replacement under the turnout, restoration of
the new operational configuration. railway signaling and telecommunications, track tamping
and leveling, and the final development of the new road-
Track renovation works at the La Negrilla Logistics Center. way and adjacent urban areas.
The scope of works is to enhance the terminal’s operational
efficiency through the renewal of track components on the Construction works for the level crossing removal project
main lines (1 and 2), the arrival and departure tracks (tracks 4, at KP 389+262, 389+948, 390+344, and 392+136 on the
6 and 8), the M2 and the loading and storage sidings (28, 30, León - A Coruña line (Line 800) in Sarria (Lugo)
32, 34 and 36). The project entails the removal of four level crossings on
Tracks will undergo full renewal, including the placement of Line 800 within the municipality of Sarria, implementing
a sub-ballast layer, the replacement of existing ballast with a specific engineering solutions for each site.
new type 1 ballast and the installation of new PR-VE mono- To remove the level crossing at KP 390+344, a new un-
bloc sleepers and 54 E1 rail. Maintenance is being performed derpass will be constructed nearby. This structure consists
on existing type A S&C units and the replacement with new of a cast-in-situ reinforced concrete box, measuring 12.60
types C1/C models on in the main tracks racks 34 and 36 will m (length) x 3.30 m (width) x 3 m (height), which will be
be realigned to comply with the standard gauge, while station jacked into place using a thrust wall.
drainage will be enhanced through new ditches and culverts. The level crossing at KP 389+262 will be replaced by a
Additionally, any affected utility services will be adapted to 395-meter access road crossing over the Arroxeiros tunnel.
the new configuration. Likewise, the crossing at KP 389+948 will be substituted by
a 110-meter road connecting to the LU-P-5713 road, which
Cutting repair works from kp 61+200 to 100+700 and intersects the track an existing underpass.
from 111+700 to 112+000 on the Ortigueira - Ribadeo Once the alternative crossings are completed, the original
section of Line 740 Ferrol – Pravia. level crossings will be decommissioned and closed by in-
The scope of the works entails the execution of 11 inter- stalling metallic safety barriers (W-beam guardrails). The
ventions on cuttings identified within ADIF’s Metric-Gauge crossing at KP 392+136 will be removed and closed di-
Network Cutting Plan and the Risk Points Registry of the rectly.
ADIF Contingency Plan. These interventions span a 55 km
section of the Ferrol-Pravia line, between Ortigueira and Emergency works and services arising from the August
Burela stations, aiming to mitigate the current risk of lands- and September 2025 wildfires on the Covas – Monforte
lides and slope instability in these locations. de Lemos – Ourense section: Infrastructure and track in-
To this end, the project includes clearing and grubbing, slo- terventions
pe reprofiling, the installation of high-tensile (TT) galvani- This emergency contract, awarded to COSFESA, encompas-
zed mesh with rock bolts, and the upgrading of longitudinal ses the recovery works for damages caused by wildfires in
track drainage and crest drains, alongside the improvement August 2025, which affected the O Barco de Valdeorras – A
of service roads and the surrounding environment. Rúa de Petín and San Clodio – Pobra do Brollón sections