Certificaciones:                                  Azvi also has extensive experience in the execution of all
                Implantados y certificados por Aenor los Sistemas de   types of infrastructure associated with the railway.
                Gestión de BIM (ISO 19650, partes 1 y 2), Calidad (ISO
                9001), Medio Ambiente (ISO 14001), Seguridad y Salud   Top products:  TRACK: 1.  Sleepers factory in Mexico.
                en el Trabajo (ISO 45001), Antisoborno (ISO 37001) y   ROLLING STOCK: 2. Rolling Stock Maintenance Centre.
                Compliance penal (UNE 19601).                     ELECTRIFICATION: 3. Ispalvia.                  guía de empresas

                Facturación: 1.001 MM€                            Activities in the year:
                Nº de empleados: 7.600                            Railway projects:
                Inversión en I+D+i: 1,5 MM€                       Murcia-Almeria HSR. Construction of the El Puche assem-
                                                                  bly hub and track laying. Section: Vera–Almería. Spain.
                                                                  Murcia-Cartagena HSR. Construction of railway platform.
                                                                  Section: Riquelme-Torre Pacheco. Spain.
                Management team:                                  Madrid-Levante HSR. Construction of acoustic screens.
                General Manager: José María Martínez Benavente. Strat-  Section: Nudo de la Encina-Játiva-Valencia. Spain.
                egy Director: Juan Jesús García de Pablo. Civil Works Di-  Madrid-Sevilla HSR. Renewal of turnouts. Spain.
                rector: Carlos Puebla Montalvo. Railway Works Director:   Mediterranean Corridor: implementation of UIC gauge.
                César Domínguez González-Seco. Building Department   Section: Castellón-Vinaroz.
                Director:  Pablo Reiter Fernández. Bid Manager: Rebeca   Chamartín Railway Station. Station extension, platforms
                Rodríguez. Technical Director: Juan Pérez Torres. Europe   and UIC track bed, Spain.
                Director: Antonio Mora. Construcciones Urales Director:   Construction of Phase I of the Bilbao Southern Railway
                Augustin Barralon. US Country Manager: Andrés Llobre-  Bypass. Spain.
                gat.                                              Madrid-Sevilla HSR. Infrastructure upgrade. Section: Gua-
                                                                  dalmez-Córdoba. Spain.
                Field:                                            Bobadilla–Algeciras railway line: slope stabilisation and
                Railways and civil works, logistics, railway transport, rail-  tunnel widening. Spain.
                way heavy machinery maintenance and railway electri-  Extension of sidings to 750 m at Caparroso, Carrascal and
                fication systems installation, industrial works and main-  Uharte-Arakil stations in Navarre, Spain.
                tenance.                                          Extension of sidings to 750 m at Lezama station in Álava,
                                                                  Spain.
                Main products and services:                       Játiva–Alcoy railway line. Comprehensive renewal of
                Throughout more than 100 years of activity, Azvi has ac-  track infrastructure. Spain.
                cumulated extensive experience, technical capacity and   Valencia Commuter Network. Section: Buñol-Utiel. Re-
                solvency to successfully execute all kind of railways and   novation of infrastructure, superstructure and preparation
                civil construction projects.                      for electrification, as well as repair of damage caused by
                Azvi’s origins as a railway company have turned the   the DANA. Spain.
                company into a key player in the railway sector with ex-  Construction of a new maintenance base for RENFE in
                tensive experience in the complete cycle of railway in-  Aranjuez. Spain.
                frastructure: infrastructure, superstructure, electrification   Construction of the intermodal platform of the Dry Port of
                and signaling, assembly bases and maintenance works   Salamanca. Spain.
                (preventive and corrective). In addition, Azvi has its own   Zafra-Huelva Railway Line. Infrastructure and track up-
                railway heavy machinery park and its approved workshop   grade. Section: Calañas-Peguerillas. Spain.
                to maintain and repair it.                        Valencia Commuter Network. Section: Pobla LLarga-Silla.
                The company has played an important role in the deve-  Infrastructure, superstructure and electrification upgra-
                lopment of High-Speed Railway in Spain, having worked   ding. Spain.
                on more than 600 km of different HSR lines, since works   Uppsala tramway: design and construction. Sweden.
                started in 1987 on the first line, which linked Madrid and   Saltillo–Nuevo Laredo railway line. Section: Sauz–Nuevo
                Sevilla in 1992.                                  Laredo. Mexico.
                Besides HSR projects, also of note are the numerous con-  Tren Maya. Section 3: Clakini-Izamal, Mexico.
                ventional railway projects aimed at improving existing   Tren Maya. Workshops and garages construction, México.
                railway infrastructures.                          Tren Maya. Sleepers factory operation, México.