Page 267 - Anuario FFCC - 2026
P. 267
Supervision of Lines 4, 5, and 6 of Monterrey Metro (Mexico). - Environmental Management, according to the standard ISO
Supervision of the extension of Line 1 of Santo Domingo Me- 14001
tro (Dominican Republic). - Greenhouse Gases, according to the standard ISO 14064-1
Design of Lines 2 and 4 of Lima Metro (Peru).
Oversight (fiscalización) of Line 1 of Quito Metro (Ecuador). Turnover: 312 million Euros
Technical assistance for the construction design of the FGC No. of employees: 3.200 guía de empresas
Llobregat–Anoia line extension: Plaça Espanya – Gràcia (Bar-
celona).
Informative and construction design study for Line 5 extension
to Terminals T1–T3 of Adolfo Suárez Madrid–Barajas Airport.
Design services for the South extension of Granada Metro:
Section Armilla – Churriana de la Vega – Las Gabias.
Construction design of Lines 2 and 4 of Lima Metro.
Project management, interface coordination, and technical
assistance for Line 2 of Panama Metro.
Technical coordination support for the Northern Section of
Seville Metro Line 3 (Ramal Norte, Ramal Sur–Los Mares, Los
Mares–San Lázaro, workshops, and rail systems).
Inspection, quality control, and environmental management
for rail replacement works in the Madrid Metro. Lot 1: Nort- AZVI
hern Zone.
Railway safety oversight, inspection, and quality control for Sede Central:
the superstructure works connecting Lines L3 and L12 of Ma- Almendralejo, 5
drid Metro. E-41019 Sevilla. España.
Drafting of the project for new railway access, freight and re- Tel.: +34 954 99 93 20
ception/dispatch tracks, Nou Llobregat sector. Fax: +34 954 99 92 00
Drafting of construction project to increase capacity in Phases www.azvi.es
I & II for the Port Authority of Barcelona.
Assistance in drafting the Informative Study for the Villamalla
Railway Terminal development. Empresas del Grupo Azvi:
Technical assistance for the basic and construction design Azvi, Traccion Rail, Manfevias, Ispalvia, Construcciones
of the new Tarragona Tramway (FGC): Tranche I – Cambrils Urales, Cupisa, Cointer, Altus.
Centre to Vila-seca Estació, Tranche II – Cambrils North spur.
Technical assistance for the construction design to improve Equipo directivo:
accessibility and regulatory compliance at Verdaguer Inter- Director General: José María Martínez Benavente. Di-
change (Lines 4 & 5, FMB). rector Estrategia: Juan Jesús García de Pablo. Director de
Technical assistance for the updated design of evacuation and Contratación: José Manuel Martínez Moral. Director de
accessibility improvements at Plaça de Sants Station (Lines 1 Obras Civiles: Carlos Puebla Montalvo. Director de Ob-
& 5, FMB). ras Ferroviarias: César Domínguez González-Seco. Direc-
Technical assistance for the construction design of L4 extensi- tor de Edificación: Pablo Reiter Fernández. Directora de
on between La Pau and Sagrera stations (Barcelona). Estudios: Rebeca Rodríguez. Director Técnico: Juan Pérez
Torres. Director de Zona Europa: Antonio Mora. Director
Geographic areas where your products and services are mar- de Construcciones Urales: Augustin Barralon. Delegado
keted: de Estados Unidos: Andrés Llobregat.
Head office: Seville.
Offices: Spain, UK, Ireland, Bahrain, Dubai, Saudi Arabia, In- Actividad:
dia, Australia, Mexico, Poland, Portugal, Panama, Dominican Ferrocarril y construcción de obra civil, logística, trans-
Republic, Colombia, Ecuador, Chile, Peru, and Morocco. porte ferroviario, mantenimiento de maquinaria pesada
Certifications: de vía, instalación y mantenimiento de sistemas de elec-
Quality and Environment: trificación ferroviaria, y obras industriales.
- Quality Management, according to the standard ISO 9001
Spanish Railway Yearbook 2026 Anuario del Ferrocarril 265

