Page 266 - Anuario FFCC - 2026
P. 266
company guide Project management support for the construction of the Agi- Supervision services for the basic and detailed designs of ETS’s
South Railway Bypass. Basque Government.
naga Tunnel.
Drafting of infrastructure improvement projects (bridges, tun-
General consultancy services for the Delhi–Meerut RRTS
nels, earthworks). Lot 4: Southern Tunnels.
high-speed rail in India.
Drafting of double-tracking construction design on the Ante-
Construction project for the double-tracking of the Anteque-
ra–Granada HSR. Section: Archidona Junction – La Chana
quera–Granada HSR. Section: Archidona Junction – La Chana
Junction.
Junction.
Drafting of alternatives study and construction project for in-
Construction project for track and electrification associated
with the commuter rail tunnel cover in Sant Andreu Comtal,
Barcelona.
Community. Lot 3.
Construction project for track installation on the Murcia–Al-
Drafting of repair and improvement designs for non-structural
masonry walls on conventional and metre-gauge lines. Lot 1:
mería HSR line. Section: Murcia – Lorca San Diego. ter-track crossings at stations in Catalonia and the Valencian
Construction project for track and electrification works con- Northwest.
necting the Zamora–Pedralba and Pedralba–Ourense sections Drafting of projects under the Northeast Conventional Net-
and the eastern Pedralba gauge changer. work Operations Subdirectorate. Lot 1: Infrastructure.
Construction project for track installation on the Murcia–Al- Drafting of projects under the Northeast Conventional Net-
mería HSR line. Section: Lorca – Almería. work Operations Subdirectorate. Lot 2: Track.
Basic and detailed design for a maintenance base for the Lor- Drafting of construction design for the adaptation of León
ca–Almería section of the Murcia–Almería HSR. Classification Yard – San Andrés del Rabanedo to the León–
Construction design for adapting the León classification yard Pola de Lena HSR.
– San Andrés del Rabanedo section to the new León–Pola de Preliminary studies for a direct freight corridor between Pau–
Lena HSR configuration. Canfranc international route and the Mediterranean Corridor.
Construction project for implementing standard gauge at Irún Design for track renewal in the branch line to Ferrol Port, in-
Station – including track and electrification. cluding third rail implementation.
Infrastructure improvement projects (bridges, tunnels, Construction design for infrastructure, track, and electrificati-
earthworks). Lot 4: Southern Tunnels. on renewal. Section: Villa del Río – Palma del Río. Lot 1: Villa
Structural and/or maintenance repairs of non-load-bearing del Río – Córdoba Freight Junction.
masonry walls on conventional and metre-gauge railway li-
nes. Lot 1: Northwest. Underground:
Alternatives study and construction project for platform access Multidisciplinary design and engineering services for the Cuffe
between station tracks in Catalonia and the Valencian Com- Parade-Aarey section of Line 3 of the Mumbai Metro.
munity. Lot 3. Consultancy contract for the platform door systems on Line 1
Projects under the Northeast Conventional Network Operati- of the Santiago Metro
ons Subdirectorate. Subsystems: infrastructure, track, energy, Specialised consultancy for Line 9 of the Santiago de Chile
signalling, and telecommunications. Lot 1: Infrastructure. Metro.
Projects under the Northeast Conventional Network Operati- Design and environmental study for the expansion plan for the
ons Subdirectorate. Lot 2: Track. four new lines of the Porto Metro (Portugal).
Drafting of construction design for track installation on the Project Management for the extension of the Yellow Line of
Murcia–Almería HSR line. Section: Murcia – Lorca San Diego. the Porto Metro (Portugal).
Drafting of construction design for track installation on the Design of the Rubi Line for the Porto Metro (Portugal).
Murcia–Almería HSR line. Section: Lorca – Almería. Design of Line 8, Phase IV of Delhi Metro (India).
Drafting of basic and detailed design for a maintenance base Design of Lines 3 and 7 of the Mumbai Metro (India).
for the Lorca–Almería section of the Murcia–Almería HSR. Design of Lines 1C and 1D of the Jaipur Metro (India).
Drafting of construction project for track and electrification Project Management for Lines 2B, 3, and 7 of Mumbai Metro
modification between Zamora–Pedralba and Pedralba–Ou- (India).
rense, including the Pedralba gauge changer. Project Management for the Delhi–Meerut RRTS, Phase 1 (In-
Drafting of construction design for track and electrification dia).
works associated with the Sant Andreu Comtal tunnel cover Supervision services for Line 1 of Bogotá Metro (Colombia).
in Barcelona. Supervision of Sections 2, 3, and 4 of Line 7 of Santiago Metro
Drafting of construction design for implementing standard (Chile).
gauge at Irún Station. Track and electrification. Supervision of the extension of Line 3 of Santiago Metro (Chile).
264 Anuario del Ferrocarril 2026 Spanish Railway Yearbook

