Page 265 - Anuario FFCC - 2026
P. 265

Clave: TM-11022-A1                               Supervision, management and monitoring of the design and
               Contrato de servicios de asistencia técnica para la redacción   construction of 117.77 km of the Saltillo–Nuevo Laredo pas-
               del proyecto constructivo de la prolongación de la línea L4   senger railway, sections 13 and 14, Saltillo–Santa Catarina.
               del FMB entre las estaciones de La Pau y Sagrera. Barcelona.   Supervision, control and monitoring of the design and con-
               Clave: TM-04426.1.3                              struction of 30.30 km of railway section I of the Querétaro-
                                                                Irapuato passenger railway line, section: Querétaro industrial   guía de empresas
               Áreas geográficas donde comercializa los productos y ser-  estate–Apaseo El Grande industrial estate, subsection from km
               vicios:                                          6+000 to km 36+300. Includes the construction of viaducts.
               Sede central: España (Sevilla).                  Services for drafting the construction project for connecting
               Oficinas: España, UK, Irlanda, Bahréin, Dubái, Arabia Saudí,   the Zaragoza-Canfranc-Pau line to the Zaragoza Plaza logi-
               India, Australia, México, Polonia, Portugal, Panamá, Repúbli-  stics platform with standard gauge.
               ca Dominicana, Colombia, Ecuador, Chile, Perú y Marruecos.  Design of the electrification of the Estonian railway network.
                                                                Project Management for the Dhaka–Tongi railway line, Tongi–
               Certificaciones Calidad y Medio Ambiente:        Joydebpur section in Bangladesh.
               - Gestión de la Calidad, conforme a la ISO 9001  Construction  supervision  of Line  86 in  the Czernica
               - Gestión Ambiental, conforme a la ISO 14001     Wrocławska  –  Wrocław  Główny  section  for  CPK  (Central
               - Gases de Efecto Invernadero, conforme a la ISO 14064-1  Communication Hub - Poland).
                                                                Comprehensive supervision (interventoría) of the Regiotram
               Facturación: 312 millones de euros               del Occidente in Colombia.
               Nº de empleados: 3.200                           Sections 1 (supervision), 2 (design), 5 North, 6 and 7 (supervi-
                                                                sion) of the Tren Maya project in Mexico.
                                                                Technical assistance for the supervision and monitoring of
                                                                construction works on the Vitoria–Bilbao–San Sebastián high-
               Management team:                                 speed rail line. Section: Mondragón–Elorrio–Bergara, Sector 1.
               CEO: Rosalío Alonso. Chief Markets Officer: Marisa Chaban-  Technical assistance services for the supervision of the railway
               eix. Chief Service Officer: Luis Garrido.        access project to Sagunto Port.
                                                                Technical assistance services for the supervision of renovation
               Activity: Engineering and Consulting, Other.     and upgrade works on the infrastructure of the Madrid–Seville
                                                                HSR line.
               Main products and services:                      Consulting and technical assistance for the overhead contact
               Planning and consulting                          line (OCL) and track installation projects at La Sagrera HSR
               Civil engineering and architectural design       Station.
               Environment and sustainability                   Technical assistance for the supervision of track renewal
               Research, assessment, and modeling               works on the Ciudad Real–Badajoz line. Section: Brazatortas–
               Construction and project management consulting   Guadalmez.
               Digital engineering                              Consulting services for the supervision of the southern railway
                                                                access platform works to the Port of Castellón. Section I (KP
               Top products: ENGINEERING AND CONSULTING: 1. Ser-  0+000 – KP 4+698).
               vices for the drafting of the basic design and platform con-  Technical assistance for comprehensive infrastructure and
               struction plans for the Seville–Huelva High-Speed Rail Line.   track renewal works. Section: KP 96+430 – Calañas, Zafra–
               Lot 1: Majarabique – Valencina de la Concepción. 2. Specia-  Huelva line.
               list consultancy (PM) for the engineering and construction of   Consulting and assistance for the construction of the Palen-
               Line 9 of the Santiago de Chile Metro.           cia–Aguilar de Campoo HSR platform. Section: Calahorra de
                                                                Boedo – Alar del Rey.
               Activity history:                                Consulting and assistance services for the extension of plat-
               Drafting of the basic design and construction plans for the   forms and two new tracks at Puerta de Atocha station and Ato-
               Majarabique-Valencina de la Concepción section, Lot 1 of the   cha Cercanías – including systems adaptations for new tracks
               Seville-Huelva AVE high-speed rail line.         16 and 17.
               Technical inspection service and project management support   Consulting and technical services for gauge clearance impro-
               for the construction of railway and complementary works for   vement works on tunnels and overpasses along Line 610 –
               the Alameda-Melipilla train project. Melipilla-Malloco section.  Teruel–Sagunto Junction. Sections: Sagunto–Teruel–Zaragoza.




            Spanish Railway Yearbook 2026 Anuario del Ferrocarril                                              263
   260   261   262   263   264   265   266   267   268   269   270