Page 493 - Anuario FFCC - 2026
P. 493

Cable laying, splicing and connections.          * Preventive and corrective maintenance and auxiliary works
               Management of railway facilities in workshops and ware-  for electrification installations (overhead contact line and trac-
               houses.                                          tion substations). Lot 2 Northwest.
               Automation and control installations.            * Maintenance services for traction energy installations: over-
               Medium-voltage lines, transformation facilities, low voltage   head contact line, energy remote control, substations, auto-
               distribution and lighting.                       transformation centers, and associated systems of the LAV   guía de empresas
               Temperature control in technical facilities (tHerma).  North, Madrid-Valladolid-León and Burgos sections.
               Workstation for overhead contact lines and railways surveying   * Execution of the works for the construction project of the
               (tCat).                                          duplication of the North - Northwest High-Speed Corridor,
               Switch point heating system (tElphe).            section Palencia - Vilecha bifurcation (High-Speed) and the
               Industrial installations maintenance.            construction project for the electrification of the line Palencia
               Mining and tunnelling communication systems.     - León, overhead contact line, new duplication sections.
               Engineering, R&D.                                *Execution of the works for the construction project of the Ca-
               Web apps development: work parts management, timesheets,   riñena and Villafranca substations of the traction electrical,
               CMMS, local and cloud SCADA, railway engineering calcula-  auto-transformation centers, and high-voltage overhead line
               tion tools, traveler information systems.        for the Zaragoza - Teruel section of the Cantabrian-Mediter-
               Tailored solutions based on LiDAR technology: geometric   ranean Corridor.
               gauge/  clearance  control  solutions,  positioning  solutions  in   * Execution of the works for the construction project of three
               complex environments, point cloud-based solutions for obtai-  intermediate auto-transformation centers, adaptation of the
               ning digital twins in linear civilian infrastructures.  electrical areas of the Luengos, Becerril, and Dueñas substati-
               SICK preferred allies in the rail sector for integration of LiDAR   ons, and the energy remote control associated with the track
               devices.                                         doubling in the Palencia-León section.
                                                                * Constructive project for the standardization and moderniza-
               Top products:  INFRAESTRUCTURE: 1.  tCat®. 2.  tElphe.   tion of block systems and new interlockings on the Cabezón
               MAINTENANCE: 3. Telice dyntact ®. 4. Telice Lizard.  de la Sal - Torrelavega section.
                                                                * Execution of works for the removal of telephone blockage
               Activities in 2025:                              between Aranda de Duero and Bif. Aranda.
               * Execution of the works for the remote-control project of   * Execution of works for the provision of BAB on the Torre-
               overhead contact line disconnectors. Asturias metric gauge   lavega - Santander - Nueva Montaña and Maliaño - Astillero
               network.                                         sections.
               * Drafting of the construction project and execution of the   * Execution of infrastructure communication renewal works in
               works for the adaptations to the safety installations on the Pola   the Northwest area.
               de Lena – Oviedo section.                        * Infrastructure communication renewal works in the Nort-
               * Maintenance support for ADIF safety installations. Lot 2 Nor-  hern area.
               thwest.                                          * Execution of the construction project for the Rincón de Soto
               * Maintenance support for ADIF safety installations. Lot 4 East.  variant of the Castejón – Logroño (La Rioja) line.
               * Integral management services for the protection and safety   * Maintenance service for 25 kV AC traction energy facilities
               installations of tunnels belonging to the Conventional and Me-  on the Madrid - Asturias high-speed line: overhead contact
               tric Gauge Network. Lot 3 Northwest.             line, substations, autotransformation centers, 20 kV line, trans-
               * Integral management services for the protection and safety   formation centers, and energy telecontrol in the Bif. Pajares
               installations of tunnels belonging to the Conventional and Me-  - Pola de Lena section.
               tric Gauge Network. Lot 5 North.                 * Works for the construction project to renovate signalling on
               * Supply and replacement of equipped fire hose cabinets   the Madrid – North Area commuter train network.
               (B.I.E.S.) with connection point (SIAMESA) to the fire pro-  * Works execution for the construction project for the safety
               tection distribution network of the Madrid–Valladolid High-  and telecommunications installations of the Sama de Langreo
               Speed Line. Guadarrama Tunnel and San Pedro Tunnel.  underground routing of Laviana-Gijón San Sanz Crespo line,
               * Drafting of the construction project and execution of the   Laviana-Tuilla section, ADIF’s metric gauge network.
               works to adapt the safety installations affected by the electri-  * Works on the construction project for the eastern traction
               fication of the Vigo Guixar – Redondela section of L812. L812   substation of the Valladolid railway bypass and rehabilitation
               Vigo Guixar - Chapela bifurcation, L810 Monforte de Lemos   of the Pinar de Antequera and Cabezón de Pisuerga traction
               - Redondela, and L824 Redondela - Arcade bifurcation.  substations.




            Spanish Railway Yearbook 2026 Anuario del Ferrocarril                                              491
   488   489   490   491   492   493   494   495   496   497   498