Page 493 - Anuario FFCC - 2026
P. 493
Cable laying, splicing and connections. * Preventive and corrective maintenance and auxiliary works
Management of railway facilities in workshops and ware- for electrification installations (overhead contact line and trac-
houses. tion substations). Lot 2 Northwest.
Automation and control installations. * Maintenance services for traction energy installations: over-
Medium-voltage lines, transformation facilities, low voltage head contact line, energy remote control, substations, auto-
distribution and lighting. transformation centers, and associated systems of the LAV guía de empresas
Temperature control in technical facilities (tHerma). North, Madrid-Valladolid-León and Burgos sections.
Workstation for overhead contact lines and railways surveying * Execution of the works for the construction project of the
(tCat). duplication of the North - Northwest High-Speed Corridor,
Switch point heating system (tElphe). section Palencia - Vilecha bifurcation (High-Speed) and the
Industrial installations maintenance. construction project for the electrification of the line Palencia
Mining and tunnelling communication systems. - León, overhead contact line, new duplication sections.
Engineering, R&D. *Execution of the works for the construction project of the Ca-
Web apps development: work parts management, timesheets, riñena and Villafranca substations of the traction electrical,
CMMS, local and cloud SCADA, railway engineering calcula- auto-transformation centers, and high-voltage overhead line
tion tools, traveler information systems. for the Zaragoza - Teruel section of the Cantabrian-Mediter-
Tailored solutions based on LiDAR technology: geometric ranean Corridor.
gauge/ clearance control solutions, positioning solutions in * Execution of the works for the construction project of three
complex environments, point cloud-based solutions for obtai- intermediate auto-transformation centers, adaptation of the
ning digital twins in linear civilian infrastructures. electrical areas of the Luengos, Becerril, and Dueñas substati-
SICK preferred allies in the rail sector for integration of LiDAR ons, and the energy remote control associated with the track
devices. doubling in the Palencia-León section.
* Constructive project for the standardization and moderniza-
Top products: INFRAESTRUCTURE: 1. tCat®. 2. tElphe. tion of block systems and new interlockings on the Cabezón
MAINTENANCE: 3. Telice dyntact ®. 4. Telice Lizard. de la Sal - Torrelavega section.
* Execution of works for the removal of telephone blockage
Activities in 2025: between Aranda de Duero and Bif. Aranda.
* Execution of the works for the remote-control project of * Execution of works for the provision of BAB on the Torre-
overhead contact line disconnectors. Asturias metric gauge lavega - Santander - Nueva Montaña and Maliaño - Astillero
network. sections.
* Drafting of the construction project and execution of the * Execution of infrastructure communication renewal works in
works for the adaptations to the safety installations on the Pola the Northwest area.
de Lena – Oviedo section. * Infrastructure communication renewal works in the Nort-
* Maintenance support for ADIF safety installations. Lot 2 Nor- hern area.
thwest. * Execution of the construction project for the Rincón de Soto
* Maintenance support for ADIF safety installations. Lot 4 East. variant of the Castejón – Logroño (La Rioja) line.
* Integral management services for the protection and safety * Maintenance service for 25 kV AC traction energy facilities
installations of tunnels belonging to the Conventional and Me- on the Madrid - Asturias high-speed line: overhead contact
tric Gauge Network. Lot 3 Northwest. line, substations, autotransformation centers, 20 kV line, trans-
* Integral management services for the protection and safety formation centers, and energy telecontrol in the Bif. Pajares
installations of tunnels belonging to the Conventional and Me- - Pola de Lena section.
tric Gauge Network. Lot 5 North. * Works for the construction project to renovate signalling on
* Supply and replacement of equipped fire hose cabinets the Madrid – North Area commuter train network.
(B.I.E.S.) with connection point (SIAMESA) to the fire pro- * Works execution for the construction project for the safety
tection distribution network of the Madrid–Valladolid High- and telecommunications installations of the Sama de Langreo
Speed Line. Guadarrama Tunnel and San Pedro Tunnel. underground routing of Laviana-Gijón San Sanz Crespo line,
* Drafting of the construction project and execution of the Laviana-Tuilla section, ADIF’s metric gauge network.
works to adapt the safety installations affected by the electri- * Works on the construction project for the eastern traction
fication of the Vigo Guixar – Redondela section of L812. L812 substation of the Valladolid railway bypass and rehabilitation
Vigo Guixar - Chapela bifurcation, L810 Monforte de Lemos of the Pinar de Antequera and Cabezón de Pisuerga traction
- Redondela, and L824 Redondela - Arcade bifurcation. substations.
Spanish Railway Yearbook 2026 Anuario del Ferrocarril 491

