Page 490 - Anuario FFCC - 2026
P. 490
company guide tion: Maria Cristina and Plaza España; For AOPJA: Infrastruc- TELICE, S.A.
ture and tracks maintenance for the bay of Cádiz tramway;
For Seville Metro: Change embedded block system for ADH
System (Bonded DFF); For Bilbao Metro: Maintenance of
track superstructure and mechanized conservation of Bilbao
Metro, on common section (Basauri-San Inazio), Líne 1 (San
Inazio-Plentzia) and Line 2 (San Inazio-Santurtzi); For Serveis
Ferroviaris de Mallorca (S.F.M.): Metro Line Expansion Pro-
ject. Section: University of the Balearic Islands (UIB)–ParcBit;
Remodeling Project of the SFM Workshops and Track Yard;
Remodeling of the Railway Overpass at the intersection with
Domicilio Fiscal y Social /
Greco Street in Palma, PK 3+529, Palma-Inca Line; Main- Tax Domicile and Headquarters
tenance and Conservation Service of the Infrastructure and
Track of the SFM network; New siding between Sineu and Pe- Calle de la Granja nº 15, Portal B, Planta 2, Puerta 3
tra on the Enllaç-Manacor line for SFM (Metric gauge railway C.P-28108 Alcobendas. Madrid. España
network of Mallorca) administracion@telice.es
www.telice.com
INTERNATIONAL:
CHILE (EFE): Contract for the provision of Railway Infrastruc- Equipo directivo:
ture Central Zone (CPIF CENTRO). CEO y Director General: Jose Miguel Gutiérrez Díaz. Director
de Operaciones: Alfredo Marin Hidalgo. Responsable Comer-
Geographic areas where your products and services are mar- cial: José Luis Santos Díez.
keted: Spain.
Actividad:
Certificates: Diseño, construcción, montaje, puesta en marcha y manteni-
Occupational Health and Safety Management Systems: ISO miento de instalaciones de electrificación, señalización e in-
45001:2018 certified by Lloyd’s Register (Certificate No. stalaciones de seguridad ferroviaria, Subestaciones Eléctricas,
10453486) – Statutory Audit Certified by Lloyd’s Register (Cer- telecomunicaciones, Rail Smart Grid, IoT, automatización de
tificate No. 10532989) procesos, instalaciones eléctricas y sistemas electromecáni-
Quality Management System: UNE-EN ISO 9001 certified by cos.
AENOR (ER - 0440/1995)
Environmental Management System: UNE-EN ISO 14001 cer- Principales productos y servicios:
tified by AENOR (GA - 2000/0050) Instalación y mantenimiento de línea aérea de contacto (ca-
Registration Certificate: Registry of carbon footprint, offset- tenaria).
ting, and CO2 absorption projects of the Ministry for Ecologi- Montaje, conexionado, ajustes y pruebas de instalaciones de
cal Transition and the Demographic Challenge señalización y seguridad ferroviaria.
Occupational Health and Safety Management Systems: Edificación técnica, obra civil y canalizaciones ferroviarias.
ISO 45001:2018 certified by Lloyd’s Register (ISO 45001 - Telemando de seccionadores de catenaria.
00024484) - Certified by Lloyd’s Register Occupational Risk Ejecución y mantenimiento de Subestaciones de tracción y
Prevention Approval (ORP - 00031455) puestos de autotransformación.
R&D&I Management System: UNE 166002 certified by AE- Montaje de accionamientos eléctricos de aguja.
NOR (IDI - 0053/2011). Instalación de cables de fibra óptica y cobre.
BIM Management System: ISO 19650-2 certified by BSi (CNF Tendidos de cable, empalmes y conexionados.
800118) Gestión de instalaciones ferroviarias en talleres y depósitos.
Anti-Bribery Management System: UNE-EN ISO 37001 certi- Instalaciones de automatización y control.
fied by AENOR (ASO-2020/0007) Líneas de media tensión, centros de transformación, distribu-
Criminal Compliance Management System: UNE 19601 certi- ción en baja tensión e iluminación.
fied by AENOR (GCP-2020/0004) Control de temperatura en locales técnicos (tHerma).
Antitrust Compliance Management System: UNE 19603 cer- Equipo auscultador de catenaria y vía (tCat).
tified by AENOR (CLC-2024/0014) Instalación de calefactores de aguja (tElphe).
Mantenimiento de instalaciones industriales.
488 Anuario del Ferrocarril 2026 Spanish Railway Yearbook

