Activities in the year: de Santiago and Gabaldon (2025-2029). Madrid-Galicia HST
INFRASTRUCTURE AND SUPERSTRUCTURE FOR HST LI- Line. Section: Olmedo–Pedralba de la Pradería (25 years)
NES.
New Railway Complex of Atocha Station (Madrid). Con- CONVENTIONAL LINES: ADIF. Railway actions: Track rene-
struction Project of Phase 2. Pasante Station Projects for the wal, specific actions in Infrastructure and adaptation of the
construction of the new access channel for the integration gauge of overpasses of the Bobadilla – Ronda section. New guía de empresas
of High Speed in the city of Valencia, the expansion and re- rail access to the Port of Seville. Castellón Station. New par-
modeling of the Valencia Station - Joaquín Sorolla and the king base for high-speed trains in Sant Andreu Comtal; Re-
expansion of the Valencia - Joaquín Sorolla car park; Sevilla- modelling of the Madrid-Vicálvaro freight terminal. Phase
Cádiz HST line. Platform and track, Section: Airport of Jerez 1, Subphase 1B and Subphase 1C; Replacement of current
de la Frontera Station-Cádiz. Duplication of railway tracks. concrete track for a new railway track on ballast in Orcasitas
Railway spur to Bajo de la Cabezuela dock; Madrid-Sevilla Station (C-5 Cercanias Madrid Commuter rail network); Im-
HST line Construction Project for Comprehensive Infrastruc- provement works on the railway track. R16 Line (Rodalies de
ture Improvements on the Madrid-Seville High-Speed Line. Catalunya´s commuter rail service). Section: Tortosa-L´Aldea
Section B: Yeles – Guadalmez; Construction Project for the / Conventional lines Maintenance (Infrastructure and tracks)
Remodeling of the Puertollano Station on the Madrid-Seville ADIF (MIV): MIV 2021 LOT 1 Northwest / LOT 2 North Me-
High-Speed Line. Track and Electrification; Renewal of slee- tric-Gauge lines: Infrastructure and track maintenance Adif
pers on Madrid-Sevilla HST line.; Madrid–Zaragoza–Bar- network path. LOT 7 Metric Gauge Railway Network.
celona– French Border HST Line. New Sant Andreu Station
for Catalonia commuter trains network. Tracks and overhead Renfe Operations (Spanish National Railway Network): Plat-
contact system works; Vitoria–Bilbao–San Sebastián HST line. form expansion at Asturias and Cantabria stations. Extension
Platform. Section: Atxondo – Abadiño / Platform. Section: of train-maintenance workshops at Montcada
Mondragon-Elorrio-Bergara. Sector II. / Platform and track,
Section: Astigarraga-Irun. Implementation of the UIC track STATE PORTS (PUERTOS DEL ESTADO). For Valencia Port
width; Mediterranean Corridor Platform and tracks works for Authority: Track duplication works and implementation of the
implementation of standard width. a) Section: Silla – Cullera, third railway line between the Western and Eastern Piers of the
b) Castellbisbal-Martorell, c) Castellón Station; Special works: Port of Valencia; maintenance of the internal railway network
Montcada Bifurcación Station Remodeling Construction Pro- of the Port of Valencia; Remodeling of the Príncipe Felipe Pier
ject. Phase 1; A High Speed Line connecting the stations of Railway Terminal; Improvement of the layout of the rail
Atocha and Chamartin. (Madrid). Construction of a new tun- and road network, including a new classification
nel by using a TBM and an UIC track width / Atlantic Axis yard, between the Poniente Pier and the Costa del
high-speed rail linea. Section: Ulla Viaduct. (The bridge is a Puerto Pier.
composite featuring a steel truss built on a concrete deck. It
is composed of 3 main spans of 225 meters, 240 meters and OTHER RAILWAY AUTHORITIES. For Eukal Trenbide Sarea
225 meters, making the principal span one of the largest in the (E.T.S.): Road Renewal Work on the Lutxana – Sondika Sec-
world – the bridge also holds multiple records) / Madrid-Gali- tion; Tramway expansion Vitoria-Gazteiz to Salburu, second
cia HST line. Section: Silleda-Vedra-Boqueixón. Infrastructure phase. Civil works. / New Station in Zarautz (Basque Country)
works including the Ulla viaduct a lightly pointed arch, 168 / Maltzaga Station track renovation and new auxiliary track.
m. of span and 105 m. of rise; Project design and track-laying. / New emergency exits. Section: Bergara-Astigarraga / Addi-
Section: Olmedo-Pedralba de la Pradería. tional platform works for the New Railway Network in the
Basque Country. Section: Bergara-Astigarraga / Infrastructure
HST-TRACK MAINTENANCE: Madrid–Barcelona HST line. maintenance and track Tramcar Vitoria / Infrastructure main-
Maintenance of infrastructure, track switches and crossings. tenance and track Tramcar Bilbao period 2019-2022. For Me-
Operating bases Brihuega y Calatayud (2024 -2028); Ma- tro Madrid: Comprehensive Renovation Works of the Track
drid-Asturias HST line. Maintenance of track, switches and Superstructure on Line 6, Section 2; Integral maintenance of
crossings. Section: Galicia connection – La Robla - Pola de switches and crossings for Metro Madrid. Lot 1 and emergen-
Lena (2023-2027). Madrid–Seville HST line. Maintenance of cy works / Infrastructure maintenance service for Metro de
infrastructure, track switches and crossings. Operating bases Madrid network Lot 4: Lines 6 and 11 / Infrastructure main-
Mora y Calatrava (2024 -2028); Madrid – Levante HST line. tenance service for Metro de Madrid network Lot 6: Lines 9;
Maintenance and pre-maintenance service of the infrastructu- For FGC: Track renewal between Muntaner and Tres Torres,
re, track, switches and crossings. Operating bases Villarrubia Barcelona – Vallés Line. For TMB: Track renewal Line 3. Sec-