Page 489 - Anuario FFCC - 2026
P. 489

Activities in the year:                          de Santiago and Gabaldon (2025-2029). Madrid-Galicia HST
               INFRASTRUCTURE AND SUPERSTRUCTURE FOR HST LI-    Line. Section: Olmedo–Pedralba de la Pradería (25 years)
               NES.
               New Railway Complex of Atocha  Station (Madrid).  Con-  CONVENTIONAL LINES: ADIF. Railway actions: Track rene-
               struction Project of Phase 2. Pasante Station Projects for the   wal, specific actions in Infrastructure and adaptation of the
               construction of the new access channel for the integration   gauge of overpasses of the Bobadilla – Ronda section. New   guía de empresas
               of High Speed   in the city of Valencia, the expansion and re-  rail access to the Port of Seville. Castellón Station. New par-
               modeling of the Valencia Station - Joaquín Sorolla and the   king base for high-speed trains in Sant Andreu Comtal; Re-
               expansion of the Valencia - Joaquín Sorolla car park; Sevilla-  modelling of the Madrid-Vicálvaro freight terminal. Phase
               Cádiz HST line. Platform and track, Section: Airport of Jerez   1,  Subphase  1B  and  Subphase  1C;  Replacement  of  current
               de la Frontera Station-Cádiz. Duplication of railway tracks.   concrete track for a new railway track on ballast in Orcasitas
               Railway spur to Bajo de la Cabezuela dock; Madrid-Sevilla   Station (C-5 Cercanias Madrid Commuter rail network); Im-
               HST line Construction Project for Comprehensive Infrastruc-  provement works on the railway track. R16 Line (Rodalies de
               ture Improvements on the Madrid-Seville High-Speed    Line.   Catalunya´s commuter rail service). Section: Tortosa-L´Aldea
               Section B: Yeles – Guadalmez; Construction Project for the   / Conventional lines Maintenance (Infrastructure and tracks)
               Remodeling of the Puertollano Station on the Madrid-Seville   ADIF (MIV): MIV 2021 LOT 1 Northwest / LOT 2 North Me-
               High-Speed   Line. Track and Electrification; Renewal of slee-  tric-Gauge lines:  Infrastructure and track maintenance Adif
               pers on Madrid-Sevilla HST line.;  Madrid–Zaragoza–Bar-  network path. LOT 7 Metric Gauge Railway Network.
               celona– French Border HST Line. New Sant Andreu Station
               for Catalonia commuter trains network. Tracks and overhead   Renfe Operations (Spanish National Railway Network): Plat-
               contact system works; Vitoria–Bilbao–San Sebastián HST line.   form expansion at Asturias and Cantabria stations. Extension
               Platform. Section: Atxondo – Abadiño / Platform. Section:   of train-maintenance workshops at Montcada
               Mondragon-Elorrio-Bergara.  Sector  II.  /  Platform  and  track,
               Section: Astigarraga-Irun. Implementation of the UIC track   STATE PORTS (PUERTOS DEL ESTADO). For Valencia Port
               width; Mediterranean Corridor Platform and tracks works for   Authority: Track duplication works and implementation of the
               implementation of standard width. a) Section: Silla – Cullera,   third railway line between the Western and Eastern Piers of the
               b) Castellbisbal-Martorell, c) Castellón Station; Special works:   Port of Valencia; maintenance of the internal railway network
               Montcada Bifurcación Station Remodeling Construction Pro-  of the Port of Valencia; Remodeling of the Príncipe Felipe Pier
               ject. Phase 1; A High Speed Line connecting the stations of   Railway Terminal; Improvement of the layout of the rail
               Atocha and Chamartin. (Madrid). Construction of a new tun-  and road network, including a new classification
               nel by using a TBM and an UIC track width / Atlantic Axis   yard, between the Poniente Pier and the Costa del
               high-speed rail linea. Section: Ulla Viaduct. (The bridge is a   Puerto Pier.
               composite featuring a steel truss built on a concrete deck. It
               is composed of 3 main spans of 225 meters, 240 meters and   OTHER RAILWAY AUTHORITIES. For Eukal Trenbide Sarea
               225 meters, making the principal span one of the largest in the   (E.T.S.): Road Renewal Work on the Lutxana – Sondika Sec-
               world – the bridge also holds multiple records) / Madrid-Gali-  tion; Tramway expansion Vitoria-Gazteiz to Salburu, second
               cia HST line. Section: Silleda-Vedra-Boqueixón. Infrastructure   phase. Civil works. / New Station in Zarautz (Basque Country)
               works including the Ulla viaduct a lightly pointed arch, 168   / Maltzaga Station track renovation and new auxiliary track.
               m. of span and 105 m. of rise; Project design and track-laying.   / New emergency exits. Section: Bergara-Astigarraga / Addi-
               Section: Olmedo-Pedralba de la Pradería.         tional platform works for the New Railway Network in the
                                                                Basque Country. Section: Bergara-Astigarraga / Infrastructure
               HST-TRACK  MAINTENANCE:  Madrid–Barcelona  HST  line.   maintenance and track Tramcar Vitoria / Infrastructure main-
               Maintenance of infrastructure, track switches and crossings.   tenance and track Tramcar Bilbao period 2019-2022. For Me-
               Operating bases Brihuega y Calatayud (2024 -2028);  Ma-  tro Madrid: Comprehensive Renovation Works of the Track
               drid-Asturias HST line. Maintenance of track, switches and   Superstructure on Line 6, Section 2; Integral maintenance of
               crossings. Section: Galicia connection – La Robla - Pola de   switches and crossings for Metro Madrid. Lot 1 and emergen-
               Lena (2023-2027). Madrid–Seville HST line. Maintenance of   cy works / Infrastructure maintenance service for Metro de
               infrastructure, track switches and crossings. Operating bases   Madrid network Lot 4: Lines 6 and 11 / Infrastructure main-
               Mora y Calatrava (2024 -2028); Madrid – Levante HST line.   tenance service for Metro de Madrid network Lot 6: Lines 9;
               Maintenance and pre-maintenance service of the infrastructu-  For FGC: Track renewal between Muntaner and Tres Torres,
               re, track, switches and crossings. Operating bases Villarrubia   Barcelona – Vallés Line. For TMB: Track renewal Line 3. Sec-




            Spanish Railway Yearbook 2026 Anuario del Ferrocarril                                              487
   484   485   486   487   488   489   490   491   492   493   494