Page 371 - Anuario FFCC - 2026
P. 371

Platform of the Madrid–Basque Country–French Border high-  Maintenance of MIV North. Lot 2.
               speed rail line. Section: Burgos–Vitoria. Subsection: Pancor-  Maintenance of MIV Center. Lot 5.
               bo–Ameyugo                                       Vegetation control by herbicide train in AV in service.
               Remodeling of the Valladolid Campo Grande Station. Muni-  Vegetation control and margins on conventional lines. Lot 5.
               cipality of Valladolid.                          Operation of ADIF locomotives. Northeast. Lot 1.
               New southern rail access to the Port of Castellón.  Operation of ADIF locomotives. East. Lot 2.   guía de empresas
               Track renovation for the access to the Ferrol Inland Port  Towing of trains with materials for works to be carried out on
               Undergrounding of the R2 commuter line of Barcelona as it   the conventional gauge network
               passes through the urban area of Montcada I Reixac and con-  Railway Traction Services
               struction of the new station.                    Railway Traction Services for load testing.
               Accesses to La Sagrera station.                  International
               Track assembly of La Sagrera High Speed station.   Construction of the California High Speed Line. Section 4:
               Architecture and facilities of La Sagrera Train Technical Treat-  Fresno-Bakersfield (USA).
               ment Area.                                       Design and construction of lots C2 and C3 of the British HS2
               Architecture and installations of La Sagrera Train Technical   High Speed railway line (UK).
               Treatment Area (PHASE B).                        Design and construction of track infrastructure of the British
               Viaduct over the Ebro River and connection platform with the   HS2 High Speed railway line (UK).
               Castejón-Comarca de Pamplona High Speed Railway Line.  Construction of the “Rail Baltica” High Speed railway line in
               Renewal, change of gauge and adaptations of Xátiva-Nudo de   Latvia.
               la Teja.                                         Construction of the “Rail Baltica” High Speed railway line in
               Oural Tunnel located in the Monforte-Lugo section of Line   Estonia.
               800: A Coruña-León.                              Construction of new railway line between Podleze y Piekielko
               Platform of the Mediterranean High-Speed corridor. Section:   in Poland.
               Lorca-Pulpí.                                     Metros and metropolitan railways
               Platform of the Mediterranean High-Speed corridor. Section:   Spain
               Pulpí-Vera.                                      Barcelona Metro (Spain). Line 8 between Plaza de España and
               Platform of the Madrid - Extremadura - Talayuela – Cáceres   Gracia stations.
               High Speed Railway. Section: Río Tiétar - Malpartida de Pla-  International
               sencia.                                          Toronto Metro (Canada).
               Remodeling of the A Coruña - San Cristovo station and si-  Sydney Metro (Australia).
               gnaling system, train protection, centralized traffic control and   Paris Metro (France).
               communications.                                  Lisbon Metro (Portugal). Yellow and pink line.
               Undergrounding of the arterial railway network in the city of   Santiago de Chile Metro. Line 7. Section: 1C
               Murcia. Undergrounding of the station and Barriomar and un-
               dergrounding of Nonduermas.                      Geographic areas where your products and services are
               Architecture, installations and urban development of the Car-  marketed: The United States and Poland, in addition
               men Station (Murcia).                            to Spain as a market of origin, remain the division’s
               Maintenance depot and service building at the Murcia freight   main markets, accounting for around 80% of sales.
               logistics centre.                                Other geographies with a stable presence are the
               Algeciras-Zaragoza railway motorway. Section: San Fernan-  United Kingdom, France, Portugal, Latvia, Estonia,
               do-Santa Maria de la Huerta.                     Chile, Perú, Puerto Rico, Australia and Canada.
               Emergency works because of the Storm DANA.
               Maintenance of infrastructure, track and switch and crossing   Certifications:
               of the Madrid South High Speed Railway Line. Lot 2 and 3.  Quality and Environment
               Maintenance of infrastructure, track and switch and crossing   Ferrovial, the first Spanish and European construction com-
               for the Madrid Northeast High Speed Railway Line. Lot 2.  pany to obtain the Environmental Management certificate in
               Maintenance of infrastructure, track and switch and crossing   accordance with ISO 14001 (AENOR).
               for the Madrid Northeast Galicia High Speed Railway Line.   Quality Certificate in accordance with ISO 9001 (AENOR).
               Section: Olmedo-Pedralba de la Pradería.         Energy Efficiency Certificate as accredited by the ISO 50001
               Maintenance of infrastructure, track and switch and crossing   (AENOR).
               for the Plasencia-Badajoz High Speed railway line.  Occupational Health and Safety Certificate according to the




            Spanish Railway Yearbook 2026 Anuario del Ferrocarril                                              369
   366   367   368   369   370   371   372   373   374   375   376