company guide  AENOR conforme a la norma UNE 166002.      drid–Barcelona–French Border High-Speed Line, which

                   Certificación del sistema de Gestión de la Seguridad de la
                                                                     will be positioned above them.
                   Información por AENOR conforme a la ISO 27001.
                                                                     Track installation and execution of systems in the train
                   Certificado de Gestión de la Información en BIM: Certi-
                                                                     technical facilities at La Sagrera Station (Barcelona,
                   ficado AENOR para ISO 19650-1/2.
                                                                     Spain). The main “Access to la Sagrera” works contract
                   Certificación del sistema de gestión de las relaciones de
                   trabajo colaborativas por AENOR según norma UNE ISO
                                                                     has been complemented by the track installation contract,
                                                                     which covers the full scope of works required to bring the
                   44001.
                   Cifra de negocio: 3.091,8 millones de euros.
                                                                     as the contract for the architectural works and systems in
                                                                     the train technical servicing area (Phases A and B).
                   Contratación: 9.581,5 millones de euros.
                   Ebitda: 85,8 millones de euros.                   high-speed tracks through La Sagrera into service, as well
                                                                     Valladolid Railway Network.  East Section. Civil and
                                                                     track work. Spain. This project comprises a total of 17.5
                                                                     kilometres, with two branches at the initial section and
                                                                     two temporary connections to the existing line at both
                   Description:                                      ends. A Iberian-gauge bypass mainly for freight transport
                   FCC Construcción: global leaders in infrastructure  will be constructed, where a new Railway Complex will
                   FCC Construcción is a company specialising in major   be located. The section includes one viaduct, five under-
                   infrastructure projects worldwide. FCC Construcción is   passes, eight overpasses and a pedestrian footbridge. The
                   part of the FCC Group, whose main business areas are   most unique distinctive structure is the Los Tramposos
                   environmental services, water, infrastructure and conces-  Viaduct, with a total length of 1,130 metres.
                   sions. With 125 years of experience, the group is one of
                   the world’s leading construction companies.       Construction works for the freight yard of the railway
                                                                     complex and its connection to the Valladolid rail arterial
                   Management team: CEO: Pablo Colio Abril.          network (Spain). Execution of the freight terminal of the
                                                                     railway complex of the new arterial network. It includes a
                   Main products and services:                       set of tracks for train arrival, departure and formation, as
                   Civil works (metro, bridges, roads, railway works, ports,   well as a loading/unloading area consisting of a 750-met-
                   airports, water treatment plants, transport terminals ...),   re-long concrete slab.
                   building (residential and non-residential), industrial.
                                                                     Double-tracking of the Barcelona R-3 suburban line.
                   Top products: INFRAESTRUCTURE: 1. Extension of Ma-  Parets del Vallès – La Garriga section. Track and elec-
                   drid Metro Line 5 to Adolfo Suárez Madrid–Barajas Air-  trification works. Double-tracking of a 16-kilometre sec-
                   port (Madrid). 2. Rubí Line of the Porto Metro. TRACK:   tion, including the construction of the trackbed and track,
                   3. Adaptation of the Mondego Mobility System in Coim-  structures  (9  viaducts,  7  overpasses,  9  underpasses,  28
                   bra to a BRT-Metrobus solution. Coimbra B - Portagem   retaining walls), drainage works (19 drainage structures,
                   section. Portugal. 4. Renewal of the Leixões Line (Matos-  ditches, collectors), electrification (masts, overhead con-
                   inhos, Portugal).                                 tact line, etc.), railway systems on the trackbed, and the
                                                                     reinstatement of affected easements and services.
                   Activities in the year:
                   Below, a selection of some of the largest projects in exe-  Undergrounding of the R2 suburban line of Renfe in
                   cution.                                           Montcada i Reixac (Vallès Occidental, Barcelona, Spain).
                                                                     The project includes the construction of the municipality’s
                   > Railways. Spain.                                new station and will represent an unprecedent urban and
                   Access Works to La Sagrera Station (Barcelona, Spain).   railway transformation, given the diversity and technical
                   The works consist of the construction of the access sec-  and construction complexity involved.
                   tions to the future La Sagrera Station and to the two subur-
                   ban rail lines, Villafranca–Maçanet and Vilanova–Mataró,   Comprehensive remodelling of Fuente de San Luis Sta-
                   which will be located between diaphragm walls on the   tion for the implementation of standard-gauge track
                   station’s lower level, as well as the trackbed for the Ma-  (Valencia, Spain). The project includes the renewal of the