Page 367 - Anuario FFCC - 2026
P. 367
mixed-gauge superstructure or its adaptation to this gauge Torres Vedras section. Portugal. Modernisation of 43.4
where it is not yet present on the main line and in much kilometres of line, including the construction of two rail-
of the track yard. It also includes works for the creation of way turnouts with a combined length of 16 kilometres,
new trackbed to extend siding tracks or connect existing improvement works at stations and halts, reorganisation
tracks, as well as the upgrading of drainage, electrificati- of level crossings and overpasses, full electrification of the
on, railway systems, utilities and easements, and auxiliary section, and the installation of electronic signalling and guía de empresas
installations to suit the station’s new track layout. telecommunications systems.
New Sant Feliu de Llobregat Station and railway inte- Renewal of the Leixões Line (Matosinhos, Portugal). The
gration in Sant Feliu de Llobregat. The works include the objective of the project is to increase the traffic capacity
outfitting of the interior of the infrastructure designed for of the line, which is key for connections with the Port of
the new underground station, as well as the construction Leixões, enabling the operation of trains up to 750 metres
of a new surface access building and the urban develop- in length. The works include extending the usable lengths
ment of its surrounding access areas. The project also in- at stations, reorganising the reception and dispatch track
cludes the implementation of civil protection and safety yards at the Leixões Terminal, renewal and adaptation of
systems for the new station and the access tunnel. the overhead line equipment, drainage systems, and si-
gnalling and telecommunications systems, as well as the
Track assembly and storage base of the Murcia-Almería elimination of level crossings and various interventions in
High-Speed Line. Murcia-Lorca section. Construction of technical buildings.
a base for the supply of materials and ballast required
for the installation of track on the Murcia-Almería High- > Metro and Metropolitan Infrastructures. Spain.
Speed Line. Extension of Madrid Metro Line 5 to Adolfo Suárez Ma-
drid–Barajas Airport (Madrid). The extension comprises
> Railways. International. 1,747 metres in which the alignment crosses over the exi-
RER3 Go Expansion On-Corr Project. Toronto, Ontario sting Metro Line 8 and beneath two motorways. The tun-
(Canada). nel is constructed using mined methods (Madrid Method)
Comprehensive renewal project for the GO Transit sy- and between diaphragm walls. In addition, the existing
stem, the commuter rail network serving the Greater T1–T2–T3 station is being expanded to convert it into an
Toronto Area (GTA). It encompasses the upgrading and interchange between Lines 5 and 8.
expansion of the existing railway infrastructure, including
electrification, the supply of rolling stock, and the mainte- > Metro and Metropolitan Infrastructures. International.
nance and operation of the network for a 25-year period.
Adaptation of the Mondego Mobility System in Coimbra
Railway contracts in Romania (Romania). Rehabilitati- to a BRT-Metrobus solution. Coimbra B - Portagem sec-
on of the Sighisoara-Atel and Atel-Micasasa sections of tion. Portugal. Execution of the Metrobus corridor and
the Brasov - Simeria railway line. Rehabilitation of the surrounding streets along a 1.8 kilometres section, deve-
Barzava-Ilteu and Gurasada-Simeria sections of the Curti- loped mainly on the existing railway platform.
ci-Simeria railway line on the Romanian-Hungarian bor-
der. Upgrading of the Caransebes-Timisoara-Arad railway Construction of the machinery depot and offices of the
line: section Lugoj-Timisoara Est. Upgrading of the Cluj- Mondego Mobility System (Coimbra). Portugal.
Episcopia Bihor railway line: section Alesd-Poieni.
Rubí Line of the Porto Metro. New metro line with a total
Modernisation of the Western Line: Torres Vedras- length of 6.3 kilometres, running between Casa da Músi-
Caldas da Rainha subsection. Portugal. The main works ca (Porto) and Santo Ovídio (Vila Nova de Gaia) stations.
include the realignment of several curves along the rail- The project includes the construction of three surface sta-
way route, electrification of the line, and interventions at tions, five underground stations, a 500-space car park, a
six stations and three halts, including the construction of connection to the Devesas railway station, and the con-
passenger platforms with minimum lengths of 150 metres struction of several viaducts and underpasses for vehicles
and technical rooms to house command-and-control and and pedestrians. A highlight of the project is the construc-
telecommunications equipment. tion of a new bridge over the River Douro, to be named
Modernisation of the Western Line: Mira Sintra-Meleças- which will be called “Ponte da Ferreirinha”.
Spanish Railway Yearbook 2026 Anuario del Ferrocarril 365