Page 508 - Anuario FFCC - 2026
P. 508
company guide celona - French Border: Section: Madrid – Zaragoza High tion in Lasarte-Hendaya Line / / Vitoria Tram System. Sec-
Speed Railway Line Madrid - Toledo: Section: La Sagra
tion: Abetxuko. 2nd Phase / Works to execute track su-
perestructure construction Project for Bilbao metro line 3.
- Toledo; High Speed Railway Line Madrid - Valladolid:
Section 2; GISA: Metro de Barcelona: Track and catena-
Sections: Madrid – Valladolid and Olmedo – Medina del
ry works of the new L9 of Metro de Barcelona, Section:
Campo; High Speed Railway Line Madrid – Castilla la
Terminal South to Ensanche Norte; Metro de Barcelona:
Mancha - Levante - Murcia: Sections: Madrid – Valen-
Track renewal in line 5. Section: Sagrera – Horta / Track
cia and Gabaldón – Albacete – Alicante - Murcia; High
Speed Railway Line Madrid - Galicia: Section: Olmedo –
renewal in line 4. Section: Barceloneta – Verdaguer /
Track renewal in line 5. Section: Ernest Lluch – Cornellá /
Pedralba de la Pradería; High Speed Railway Line Madrid
Track renewal in line 4. Section: Maragall – Trinitat Nova
- Asturias: Section: Galicia Junction – La Robla – Pola
de Lena.
/ Track renewal in line 1. Section: Santa Eulalia - Bordeta;
Metro de Madrid: Trackworks on line 12. Section 1: Los
CONVENTIONAL LINES: Espartales - San Nicasio / Track maintenance. Section 1:
Sacedal / Track renewal in line 8. Section: Colombia –
ADIF: Mediterranean Corridor. Section: Castellbisbal - Pinar del Rey / Track renewal in line 5. Section: Callao
Murcia. Subsections: Sant Vicenç de Calders – Tarragona – Ópera / Track renewal in line 6. Lot 1 Northwest arc
– Nudo de Vilaseca and Fuente de San Luis - Almussafes / Maintenance of the track superstructure and drainage.
/ Remodelling of tracks and platforms at the Chamartín Lot 1: Sacedal.
station (Madrid) / Remodelling of tracks and catenary in
the Atocha – Recoletos – Chamartín tunnel / Track rene- INTERNATIONAL:
wal. Section: Plasencia del Monte – Ayerbe / Infrastructu-
re improvement works Monforte – Orense Line. Sections: POLAND: Line 1: Modernisation of railway line L1 Sec-
009+059 -019+798 and 036+524 – 046+229 / Track du- tion: Koluszki – Czestochowa / Line E30: Section: Krzes-
plication. Section: Astillero – Orejo / Algeciras – Zaragoza zowice-Krakow Mydlniki / Line E20/CE20 Modernisation
Railway Motorway. Section: San Fernando – Santa María / of railway line Siedlce, Lukow and Medzyrecz / Line 226:
Emergency damages caused by the DANA. Section: Buñol Construction project for the improvement of the railway
– Cheste / Renovation of the Villabona 90I and 90II tun- access to the Gdansk port / Line 8: Modernisation of Line
nels. León-Gijón line / Emergency. Lot 3: Replacement of 8. Section: Warszawa Ok‐cie – Radom (LOT A, B, F) /
severely damaged rail on the Pinto-Aranjuez section of Line 131: Project and Works: Modernisation of Line 131.
Line 200 Madrid-Chamartín Clara Campoamor-Valencia- Section: Bydgoszcz-Chorzòw Batory / Line 311: Moderni-
Estació del Nord. sation of railway line 311. Section: Jelenia Góra - Szklar-
ska Poreba Górna.
CONVENTIONAL LINES MAINTENANCE: USA: Dulles Corridor. Phase 2 Lot B / Workshops and ga-
rages. Station of Wachusett and depot facilities located in
ADIF: Railway, infrastructure and corrective interventions Westminster - Massachusetts.
treatment plan, in lines with iberian track gauge Period: CANADÁ: Parking base Lincolnville / Installation of 12.5
01/01/2012 - 31/12/2017 Sections A3 GM Madrid-Sur, km of double track and maintenance base in Ottawa.
C3 GM Valladolid and B2 GM Tarragona / Railway, infra- COLOMBIA: Railway repair of sections Bogotá-Belencito,
structure and corrective interventions treatment plan, in La Caro-Zipaquirá and Bogotá-Facatativá.
lines with iberian track gauge (MIV) Period: 01/01/2018 FRANCE: Toulouse Underground / Gauge changing fa-
- 31/08/2021 Sections: 1 - Centro, 3 - Norte and 4 – No- cilities in Cerbere / Roissy Underground / Montpellier
reste / Railway, infrastructure and corrective interventions Tramway / Track renewal in Fideac – Bagnac / Renewal
treatment plan, in lines with iberian track gauge (MIV) Pe- of catenaries Paris - Lyon.
riod: 01/09/2021 – 30/11/2025 Sections: 5 - Centro and ITALY: Turin Underground.
2 – Norte / Infrastructure and track maintenance for ADIF PORTUGAL: Station of Ermesinde / Porto da Figuera da
conventional and meter gauge lines 2025-2027. Sections: Foz / Duplication and Electrification of section Cete Peña-
5 - Centro and 2 – Norte. fiel / Mondengo Underground / Station of Coimbra.
OTHER RAILWAY AUTHORITIES: Geographic areas where your products and services are
marketed: Spain.
ETS: Infrastructure and trackwork for Loiola-Herrera sec-
506 Anuario del Ferrocarril 2026 Spanish Railway Yearbook

