Page 507 - Anuario FFCC - 2026
P. 507
c. Main Railway Works:
Certificado de Cancelación Voluntaria de Emisiones NATIONAL:
2025: NACIONES UNIDAS. Según el Procedimiento de
Cancelación Voluntaria en el Registro del MDL. Identi- HIGH SPEED RAILWAY LINES:
ficador: GB136410 Proyecto: CDM 0846. Y Verified Car-
bon Standard. Proyecto: VC920. High Speed Railway Line Madrid – Barcelona – French guía de empresas
Certificado Sistema Gestión Información (BIM): UNE-EN Border: Section: Trinidad Junction - Montcada (Barce-
ISO 19650-2:2018. Certificado Nº CNF 800097. lona) / Track assembly line Figueres – Perpignan; High
Certificado Sistema Gestión de la Seguridad Vial: ISO Speed Railway Line Madrid – Castilla la Mancha - Le-
39001-2012. Certificado Nº C687622. vante - Murcia: Section: Olalla – Arcas del Villar / Sec-
Facturación: Grupo VIAS 711,40 millones de euros. tion: Buñol – Cheste / Section Albacete – Alpera bypass
Nº de empleados: Grupo Vías: 1.865 empleados. / Section: Monforte del Cid - Aspe (Alicante) / Track as-
Capital social: 23,74 millones de euros. sembly Section: Gabaldón - Siete Aguas / Track assembly
Inversión en I+D: 1,57 millones de euros. Section: Monforte del Cid – Túnel de Callosa; High Speed
Fondos propios: Patrimonio Neto: 41,89 millones de eu- Railway Line Madrid - Valladolid: Section: Tres Cantos –
ros. Colmenar Viejo / Guadarrama tunnels sections 3 and 4
/ Track assembly Section: Segovia - Fuente de la Cruz /
HSRL Connection Madrid – Valladolid and Madrid – Ol-
medo- Zamora in the Olmedo Area. Phase 1; High Speed
Management team: Railway Line North - Northwest Corridor: Section: Pon-
Sole Director: Antonio Álvarez-Cedrón Hernández; Pro- te Ambia – Taboadela (Orense) / Section: Prado - Porto
duction Manager: Francisco Javier Medina Reus; Techni- (Orense) / Track assembly Section: Olmedo - Pedralba de
cal and Bids Manager: José Manuel Díez Roncero; Ad- la Pradería; High Speed Railway Line Valladolid – Burgos
ministration and Finance Manager: Manuel Rodríguez - Vitoria: Section: Valladolid - Burgos and Venta de Baños
Huerta; Human Resources and General Services Mana- - Palencia, subsection: Venta de Baños junction (Palencia)
ger: Carlos Covo Vicente; Machinery Manager: Javier Del / Track assembly Section: Quintana del Puente – Estépar;
Río Urra; Risk Prevention, Quality and Environment Ma- High Speed Railway Line Valladolid – Venta de Baños –
nager: María Rincón Fernández; Legal Advisory Manager: Palencia – León: Section: South access to Palencia / Track
Yovana Carnicero Costa. assembly Section: Villada – León; High Speed Railway
Line Vitoria – Bilbao - San Sebastián: Section: Durango –
Activity: Amorebieta - Etxano (Vizcaya); High Speed Atlantic Rail-
Construction of civil and building works (Specialized in way Line: Section: As Maceiras - Redondela (Pontevedra)
railway infrastructure and superstructure). / Track assembly Section: Vigo Urzaiz - Soutomaior (Pon-
tevedra); High Speed Railway Line Antequera - Granada:
Main products and services: Section: Bobadilla Junction – Antequera / Track assembly
CONSTRUCTION: Railway systems, highways, hydrau- Section: Antequera – Loja / Antequera High Speed station;
lic works, buildings, urban developments, environmental High Speed Railway Line Madrid – Extremadura. Track
works and gas pipelines. Latest railway technology, spe- assembly Section: Plasencia – Cáceres / Track renewal.
cialised in construction, renewal, conservation and main- Section: Monfragüe – Plasencia / Track assembly Section:
tenance of railway infrastructures. Central pool of machi- Mérida By-pass / HSRL Connection in Mérida. Platform
nery with its own turn-out in Pancorbo (Burgos). and track; High Speed Railway Line Madrid – Sevilla: In-
frastructure improvement works. Section B: Yeles – Gua-
Top products: INFRAESTRUCTURE: 1. Remodeling of dalmez / Remodelling of tracks at the Puertollano station;
tracks at the Chamartín station / Extension of HS tracks Extension and remodelling of the high-speed railway
and passenger building at Chamartín station. 2. Track re- tracks and the passenger building at Chamartín station;
newal on line 6 of the Madrid Metro. Lot 1 Northwest Remodelling of the Valladolid Campo Grande station.
Arc. MAINTENANCE: 3. Maintenance of track super-
structure and platform on railway lines. TRACK: 4. Lea- MAINTENANCE OF HIGH SPEED RAILWAY SYSTEMS:
ders in Railway Superstructure Works.
High Speed Railway Line Madrid - Sevilla: Section: Ma-
Activities in the year: drid – Adamuz; High Speed Railway Line Madrid - Bar-
Spanish Railway Yearbook 2026 Anuario del Ferrocarril 505

