company guide  earthworks between km. 128+301 and 129+000. Caste-  commuter train station in Madrid.

                   jón de Ebro - Bilbao line.
                                                                     - Works on the construction project to improve accessibi-
                                                                     lity at Navalperal de Pinares station (Ávila).
                   - Enlargement of track 3 at Orduña station (Vizcaya).
                                                                     - Works on the construction project to improve accessi-
                   - Modernization of the Huesca-Canfranc railway lines in
                                                                     bility between platforms at Valdepeñas station (Ciudad
                   two of its sections, the Ribaforada-Tudela line (Navarra)
                   and the Mediterranean Corridor with new sleepers.
                                                                     Real).
                                                                     - Renovation project for the mechanical equipment ope-
                   - Acoustic protections of the High-Speed line south zone
                   (Castilla La Mancha and Andalusia).
                                                                     rations rest module in the tunnels of the Algeciras Mari-
                   - Acoustic protections of the High-Speed line Vitoria-Bil-
                                                                     - New Valladolid railway complex. Phase II.
                   bao-San Sebastian. Section: Bergara-Irun.
                   - Typsa. Supply of sleepers for the maintenance of the
                   northeast area of the General Interest Railway Network   time Station.
                                                                     Electrification:
                   (RFIG), for access to the new Barcelona Airport terminal,   - Electrification of the Madrid-Extremadura high-speed
                   adaptation of Can Tunis station (Barcelona), section of   corridor. Erection of the overhead contact line (catenary)
                   Calafell-Gavá and others of Barcelona-Tarragona-France   between Plasencia and Peñas Blancas (125 km).
                   line, Cercanías de Barcelona between Parets del Vallés   - Commissioning of the Tomeza electrical substation
                   and La Garriga, maintenance of Metro Bilbao, renovati-  (Pontevedra). Supply of equipment to the existing instal-
                   on of turnouts and level crossings for Ferrocarrils de la   lation for its conversion into a traction substation that will
                   Generalitat Valenciana FGV, the complete renovation of   feed the A Coruña-Vigo Atlantic axis.
                   the Gijón-Laviana (Asturias) and Torralba-Soria (Soria),   - Construction of 400kV Transmission line in Totana.
                   and the renovation of the sections Plasencia del Monte-  - Overhead contact line on the section Sagrera–Mollet–
                   Ayerbe, Ayerbe-Calderarenas, Jaca-Canfranc of Huesca-  Granollers (Barcelona).
                   Canfranc line (Huesca), the standard gauge connection   - Pre-construction engineering for the Las Vegas-Los An-
                   to the Mediterranean Corridor of the Llagosta Multimodal   geles High Speed Rail project.
                   Platform (Barcelona) and the remodelling of  the Mont-  - Hitrino traction substation (Bulgaria).
                   cada-Bifurcación station (Barcelona).             - Supply and assembly of the second transformer at the
                   - Modernization of the Plovdiv-Skutare and Plovdiv-Kru-  Sequeiros supply center. León – A Coruña Line. Section:
                   movo railway lines and the Plovdiv railway junction in   Monforte – Covas (Lugo).
                   Bulgaria. Renovation of distribution stations, design and   - Guillarei new feeder exit (Pontevedra).
                   construction of the platform, track systems, catenary, and   - Catenary electrification of Mollet Sant Fost station (Bar-
                   signalling and telecommunications systems.        celona).
                   - Modernization of the Voliujak-Petarch railway section   - Reconstruction of Jasna traction substation buildings in
                   in Bulgaria. The works will involve the modernization of   Warsaw - Lot 1.
                   12 km of track between Voluyak and Petarch to adapt
                   the speed of trains to 160 km/h, which requires the con-  Metro and Tram:
                   struction of new layouts with civil works for the platform   - Works on the technical branch of the northern section of
                   and structures, the renovation of the railway track and the   line 3 of the Seville Metro.
                   traction and catenary system. Renovation of the station in   - Renovation works on Line 1 of Metrovalencia. Replace-
                   the town of Kostinbrod, renovation and construction of   ment of the existing turnouts with their drives and mo-
                   pedestrian underpasses and a bus stop.            dification of interlockings and centralised traffic control
                                                                     systems (CTC). Track renewal will also be carried out on
                   Building construction:                            several branches and level crossings will be renovated.
                   - Construction of the new Albal (Valencia) train station.   Replacement of 45 turnouts, the supply and installation of
                   Construction of the new station and the corresponding   14,374 prestressed concrete monoblock sleepers and the
                   emergency works following the impact of the DANA   supply and installation of 24,932 m3 of ballast.
                   storm on October 29, 2024, on the main structure. Con-  -Reconstruction of the Lodz tramway line. Legionow
                   struction of two pavilions, two 200-meter-long platforms,   Street. Sections I, II and III. Lodz (Poland).
                   an underpass, and a parking lot with 80 spaces. The emer-  - 1.3 km double tramway line with three stations along its
                   gency work consisted of cleaning and the replacement of   route on Gagarina Street in the city of Warsaw (Poland).
                   virtually all the facilities.                     - Tram line from Aleja Niepodleglosci to Pulawska Street
                   - Accessibility improvement works at the Ramón y Cajal   (Poland).