Page 411 - Anuario FFCC - 2026
P. 411
de contacto, centro de autotransformación y telemando consolidated its position in the water sector with the ac-
de energía, incluyendo las instalaciones asociadas al quisitions of the companies Soil Treatment of Industrial
tramo de alta velocidad entre Chamartín y Torrejón de Waters and Deisa IWS, subsidiary of Comsa, in 2020; and
Velasco. in the rail market with the acquisition of the track assem-
- Mantenimiento de instalaciones de electrificación. Sub- bly company DSV Empresa Constructora y Ferroviaria
dirección de operaciones sur y este. and Balzola Polska in 2022. guía de empresas
- Mantenimiento de los túneles de la línea de alta veloci- One of the differential characteristics of Lantania is its abi-
dad La Robla- Pola de Lena (León- Asturias). lity to execute any kind of rail project in an integral way.
The company has built more than 150 km of infrastruc-
ture, tunnels and railway viaducts, as well as more than
Áreas geográficas donde comercializa los productos y 50 traction power substations and more than 1,000 km of
servicios: Principales países de Europa y América. overhead line.
Certificaciones: Main products and services:
Calidad, medio ambiente e I+D+i: Como muestra de nue- Construction and maintenance of railway infrastructure
stro compromiso con los sistemas de gestión de calidad projects (platform, viaducts, tunnels...), track assembly,
y ambiental y de seguridad en el trabajo, Lantania dis- rail electrification (traction power substations, transfor-
pone de las certificaciones ISO 9001, ISO 14001 e ISO mation centers and overhead line) and auxiliary systems.
45001:2018, en los ámbitos de calidad, gestión medio-
ambiental y seguridad y salud laboral otorgadas por Ae- Top products: ELECTRIFICATION: 1. Railway electri-
nor, además de la certificación ISO 50001:2018 que acre- fication projects. INFRAESTRUCTURE: 2. Balzola Pols-
dita nuestro sistema de gestión energética. Certificación ka. MAINTENANCE: 3. DSV Construction and Railway
ISO 20400 de Compras Sostenibles otorgado por AERCE. Company. TRACK: 4. Manufacture of prestressed and
Sello ‘Calculo y Compenso’ del Ministerio para la Transi- reinforced concrete railway sleepers.
ción Ecológica y el Reto Demográfico. Certificación ISO
19650 de Gestión de la Información en BIM. Certificación Activities in the year:
ISO 39001 del Sistema de Gestión de la Seguridad Vial. Infrastructure:
- Connection of the Madrid-Barcelona and Madrid-Levan-
te high-speed lines. Construction of a direct branch line
Facturación 2025: 458 millones de euros. linking the Madrid-Barcelona and Madrid-Levante high-
Ebitda 2025: 13,7 millones de euros. speed lines in Madrid, which will enable direct connec-
N.º empleados 2025: 1.400. tions between the north-east and the north and north-west
of the peninsula.
- Construction works on the platform construction project.
Palencia-Aguilar de Campoo high-speed railway line.
Management team: Section: Palencia - Palencia Norte.
Chief Executive Officer: Federico Ávila. Chief Corporate - Execution of the works for the construction project of the
and Financial Officer: Andrés Álvarez. Chief Operations access to Terminal T4 of Madrid-Barajas Adolfo Suárez
Officer (Building and Infrastructure): Jose Alberto Carras- airport in standard UIC gauge.
co. Chief Operations Officer (Energy): Rafael Alcón Sáez. - Execution of bridge repair projects on the Madrid-Bar-
Chief Operations Officer (Water): Pedro Almagro Ga- celona line, Vilanova-Sitges section: bridge over the Riera
vilán. Chief Business Development Officer: Luis Manuel de Cañellas stream, km 640+674 and bridge over the Tor-
Corrales. rente de Piera, km 636+562.
- Execution of the works for the project to repair the bridge
Activity: over the River Arlanzón I on the Madrid-Hendaye line,
Lantania specializes in the construction of large road and Quintana del Puente - Villodrigo section.
railway infrastructures, singular buildings, water, and - Execution of the construction project for the extension of
energy projects. The company began its activity in 2018 track 2 at the southern end of Vic station on the line from
with the acquisition of the construction, energy and ser- Tour de Carol-Enveigt to the Montcada junction (Barce-
vices business units of the Isolux Corsán Group and the lona).
subsequent purchase of the Velasco Group in 2019. Has - Works for the execution of the project to stabilise the
Spanish Railway Yearbook 2026 Anuario del Ferrocarril 409