Page 400 - Anuario FFCC - 2026
P. 400

company guide  Áreas geográficas donde comercializa los productos y ser-  and metric gauge network projects, INSE RAIL has develo-

                 vicios:
                                                                   ped a tool that calculates the clearances defined in OFOM
                                                                   1630/2015 for the UIC, Iberian and metric gauges, and even
                 España y Portugal.
                                                                   Rolling Highway clearances.
                 Certificaciones:
                                                                   Its main advantages are time and cost savings to define clearan-
                 Calidad, Medio Ambiente y Seguridad y Salud: ISO 9001:2015
                                                                   ces, more reliable calculations and integration with other 3D
                                                                   modeling programs and the BIM ecosystem in general.
                 (Calidad) * ISO 14001:2015 (Medioambiente) * ISO 45001:
                 2018 (Seguridad y Salud)
                                                                   Activities in 2025:
                 N.º de empleados: 115 (cierre 2025)
                                                                   Consulting and Design Projects
                 Capital social: 5,2 millones de euros (cierre 2025)
                 Inversión I+D: 550.000 euros (cierre 2025)        Top products: INNOVATION ENGINNERING: GALIBRAIL.
                 Ventas: 11,8 millones de euros (cierre 2025)      -      Construction project for the Cantabrian–Mediter-
                                                                   ranean high-speed rail corridor. Section: Castejón–Logroño.
                                                                   Subsection II: Alcanadre. Adif
                                                                   -      Construction project for the renewal of the metre-
                 Management Team:                                  gauge railway network and flood protection works in the mu-
                 Chairman: César Cañedo-Argüelles. CEO: Jaime Cañedo-  nicipality of Zalla (Bizkaia). Adif
                 Argüelles. Civil Engineering Area Manager: Fernando Acero.   -   Construction project for the new railway access to
                 Railway Systems Area Mananger: Luis Álvaro Rodríguez. In-  the Alicante airport and the new passenger station. Adif
                 dustrial Area Manager: Oscar Domingo.             -      Detailed design projects for the improvement of
                                                                   evacuation and ventilation conditions in case of fire in the
                 Activity:                                         subway suburban stations of Embajadores, Getafe Centro and
                 Engineering firm highly specialized in the railway industry and   Parla (Metro de Madrid). Adif
                 specifically its facilities and systems, which is also active in   -   Project design to extend the Diagonal – Baix
                 the industrial and airport sectors.               Llobregat tram to the center of Sant Feliu de Llobregat. Autori-
                                                                   tat del Transport Metropolitá de Barcelona
                 Main products and services:                       -      Project for the new Alstom maintenance center in
                 Inse Rail, since its foundation in 1994, has supplied its cu-  Santa Perpetua de la Mogoda. Alstom
                 stomers with consultancy and engineering services during the   -   Project to upgrade the Vilapicina Workshop for the
                 different stages of planning, design, building and exploitation   expanding fleet. TMB
                 of investments.                                   -      Construction  project  for  a  workshop  for  rolling
                 Inse Rail participates in the Spanish and international develop-  stock maintenance in southern Madrid. Adif
                 ment of the High Speed Rail and metropolitan transportation,   -   Construction projects to extend the sidings of the
                 with a strong specialization in electrification, signalling, secu-  General Interest Railway Network to 750m. Lot 3. Southern
                 rity and communication systems, and other railway transport   Section. Adif
                 installations.                                    -      Detailed design project of the control, command
                 Inse Rail has a multi-faceted team of experts in civil enginee-  and signalling subsystem associated with the Master Plan for
                 ring, electric engineering, mechanics and telecommunicati-  the Galician Railway Network, Northwest Plan (2017-2025).
                 ons, who provide each individual customer with the service   Adif
                 and commitment to achieve their objectives.       -      Construction project for the electrification of the
                 Inse Rail is at the forefront of technology and maintains a   high-speed line duplication Antequera – Granada. Section:
                 strong  commitment  to innovation,  evidenced by  its syste-  Archidona Junction – La Chana Junction, and tracks 8 and 9 of
                 matic participation in R&D programs in collaboration with   Granada station. Adif
                 Universities and Technological Research Centers, creating   -   Feasibility study, preliminary design and construc-
                 and maintaining proprietary tools to respond to the needs and   tion project for an accessible connection between platforms,
                 technical challenges of our activity.             adaptation and commissioning of the former Almodóvar del
                                                                   Río station (Córdoba). Adif
                 GALIBRAIL project                                 -      Construction project for the new maintenance base
                 Aware of the growing problems in Conventional Network   in Ripoll (Girona). Renfe
                 projects in general, and more specifically in Rolling Highway   -   Replacement project for switch number 11 at the




       398                                                     Anuario del Ferrocarril 2026 Spanish Railway Yearbook
   395   396   397   398   399   400   401   402   403   404   405