company guide Management Team out the annual track grinding to increase rail durability using
a grinding train consisting of three units. Regarding preventi-
ve and corrective maintenance and inspections, the company
has a complete set of machinery, auxiliary equipment, and
President: Julián García Valverde
specialized personnel to fully and independently carry out the
Vicepresident: Daniel García Martín
CEO: José María Carbajo Sotillo
tasks outlined in the Comprehensive High-Speed Rail Main-
tenance Plan.
Business Sector: Civil Works
We follow with great attention the railway activity in the regi-
Main Products and Services:
With high specialization in the execution and maintenance
le, we are one of the prequalified companies for track main-
tenance on the North-South and East-West freight rail lines.
of railway works, IMATHIA Construcción develops its main
activity in civil works execution: on, and we are present in several ongoing tenders. For examp-
We have also been invited to participate in the North-South
Railway line capacity expansion project, which involves doubling the
Roads track.
Comprehensive Water Cycle and Environment Uganda
Industrial and Special Buildings In 2024, the rehabilitation project of 28 km of the Kampala -
Urban Planning Malaba line on the Kampala - Mukono section was successful-
ly completed.
Flagship Projects: In 2025, we began the design and construction of the interface
MAINTENANCE: Civil Works Superstructure and Mainte- infrastructure between the Kampala Industrial and Business
nance (12 years) of infrastructure and superstructure on the Park and the existing Namanve–Mukono narrow-gauge rail-
Haramain High-Speed Railway (Mecca - Medina, Saudi Ara- way line. This included cross-drainage works with reinforced
bia). TRACK: 2. Construction of the new Fuencarral II high- concrete culverts, the implementation and adaptation of level
speed workshop (Madrid, Spain). crossings, the installation of utility conduits, and the dismant-
ling, replacement, and adjustment of the track where necessa-
Activities in the Year: ry to ensure compatibility between the new development and
In 2025, the contract was renewed for another five years, and railway operations. The project also includes the geometric
we continued maintaining the Haramain High Speed Railway redesign of certain sections and siding, the selective raising of
in Saudi Arabia, maintaining high quality standards throug- track levels, and ensuring a smooth transition with the existing
hout all our operations. track, all while maintaining the technical parameters of the
In addition, we completed the rehabilitation of 28 km on the line in service.
Kampala to Malaba (Uganda) metric gauge railway line, inclu- Iraq
ding a scope extension that included the rehabilitation of five In 2025 we began to work on a 36 km section of conventional
level crossings, demonstrating our ability to manage complex double-track, international gauge railway to link the city of
projects and deliver high quality results. Basra with its industrial area, including earthworks, infrastruc-
In Spain, we successfully continued providing maintenance ture, track superstructure, signaling, three stations and OCC
services for the electrical installations of ADIF-High Speed We are on the short list for the development of the high-capa-
Telecommunications Parks in several provinces and comple- city railway project to link the holy cities of Karbala and Najaf.
ted the construction of the new Fuencarral II high-speed work- Spain
shop, the largest railway workshop built by RENFE FABRICA- In 2025, we were awarded the contract for the works on the
CIÓN Y MANTENIMIENTO so far. “Algeciras-Zaragoza Rail-Highway Line 430 Córdoba-Los
Saudi Arabia Prados, overpass within the Córdoba municipality, embank-
Throughout 2025, we continued with the maintenance of the ment improvements within the Montemayor municipality,
track infrastructure and superstructure, as well as the manage- and improvements to flood-prone areas within the Aguilar de
ment of passenger service on the high-speed rail line between la Frontera municipality”. The scope of works includes three
Mecca and Medina. It is worth highlighting the adjustment actions located along the Córdoba-Los Prados rail line:
and maintenance of track switches and other track compon- Treatment of the Salto del Carnero viaduct, located at kilo-
ents, both high-speed and conventional; the regular geometric meter points 1+400, on the overpass above the conventional
and dynamic track inspections using accelerometers inte- rail network’s Line 400 and the Madrid-Seville high-speed rail
grated into a commercial train traveling at 300 km/h; and the line.
inspection of rails with ultrasonic equipment. We also carried Embankment stabilization between kilometer points 38+830