Page 396 - Anuario FFCC - 2026
P. 396

company guide  Management Team                          out the annual track grinding to increase rail durability using

                                                                   a grinding train consisting of three units. Regarding preventi-
                                                                   ve and corrective maintenance and inspections, the company
                                                                   has a complete set of machinery, auxiliary equipment, and
                 President: Julián García Valverde
                                                                   specialized personnel to fully and independently carry out the
                 Vicepresident: Daniel García Martín
                 CEO: José María Carbajo Sotillo
                                                                   tasks outlined in the Comprehensive High-Speed Rail Main-
                                                                   tenance Plan.
                 Business Sector: Civil Works
                                                                   We follow with great attention the railway activity in the regi-
                 Main Products and Services:
                 With high specialization in the execution and maintenance
                                                                   le, we are one of the prequalified companies for track main-
                                                                   tenance on the North-South and East-West freight rail lines.
                 of railway works, IMATHIA Construcción develops its main
                 activity in civil works execution:                on, and we are present in several ongoing tenders. For examp-
                                                                   We have also been invited to participate in the North-South
                 Railway                                           line capacity expansion project, which involves doubling the
                 Roads                                             track.
                 Comprehensive Water Cycle and Environment         Uganda
                 Industrial and Special Buildings                  In 2024, the rehabilitation project of 28 km of the Kampala -
                 Urban Planning                                    Malaba line on the Kampala - Mukono section was successful-
                                                                   ly completed.
                 Flagship Projects:                                In 2025, we began the design and construction of the interface
                 MAINTENANCE:  Civil Works Superstructure and Mainte-  infrastructure between the Kampala Industrial and Business
                 nance (12 years) of infrastructure and superstructure on the   Park and the existing Namanve–Mukono narrow-gauge rail-
                 Haramain High-Speed Railway (Mecca - Medina, Saudi Ara-  way line. This included cross-drainage works with reinforced
                 bia). TRACK: 2. Construction of the new Fuencarral II high-  concrete culverts, the implementation and adaptation of level
                 speed workshop (Madrid, Spain).                   crossings, the installation of utility conduits, and the dismant-
                                                                   ling, replacement, and adjustment of the track where necessa-
                 Activities in the Year:                           ry to ensure compatibility between the new development and
                 In 2025, the contract was renewed for another five years, and   railway operations. The project also includes the geometric
                 we continued maintaining the Haramain High Speed Railway   redesign of certain sections and siding, the selective raising of
                 in Saudi Arabia, maintaining high quality standards throug-  track levels, and ensuring a smooth transition with the existing
                 hout all our operations.                          track, all while maintaining the technical parameters of the
                 In addition, we completed the rehabilitation of 28 km on the   line in service.
                 Kampala to Malaba (Uganda) metric gauge railway line, inclu-  Iraq
                 ding a scope extension that included the rehabilitation of five   In 2025 we began to work on a 36 km section of conventional
                 level crossings, demonstrating our ability to manage complex   double-track, international gauge railway to link the city of
                 projects and deliver high quality results.        Basra with its industrial area, including earthworks, infrastruc-
                 In Spain, we successfully continued providing maintenance   ture, track superstructure, signaling, three stations and OCC
                 services for the electrical installations of ADIF-High Speed   We are on the short list for the development of the high-capa-
                 Telecommunications Parks in several provinces and comple-  city railway project to link the holy cities of Karbala and Najaf.
                 ted the construction of the new Fuencarral II high-speed work-  Spain
                 shop, the largest railway workshop built by RENFE FABRICA-  In 2025, we were awarded the contract for the works on the
                 CIÓN Y MANTENIMIENTO so far.                      “Algeciras-Zaragoza  Rail-Highway  Line  430  Córdoba-Los
                 Saudi Arabia                                      Prados, overpass within the Córdoba municipality, embank-
                 Throughout 2025, we continued with the maintenance of the   ment improvements within the Montemayor municipality,
                 track infrastructure and superstructure, as well as the manage-  and improvements to flood-prone areas within the Aguilar de
                 ment of passenger service on the high-speed rail line between   la Frontera municipality”. The scope of works includes three
                 Mecca and Medina. It is worth highlighting the adjustment   actions located along the Córdoba-Los Prados rail line:
                 and maintenance of track switches and other track compon-  Treatment of the Salto del Carnero viaduct, located at kilo-
                 ents, both high-speed and conventional; the regular geometric   meter points 1+400, on the overpass above the conventional
                 and dynamic track inspections using accelerometers inte-  rail network’s Line 400 and the Madrid-Seville high-speed rail
                 grated into a commercial train traveling at 300 km/h; and the   line.
                 inspection of rails with ultrasonic equipment. We also carried   Embankment stabilization between kilometer points 38+830