Page 389 - Anuario FFCC - 2026
P. 389
by ENR (Egyptian National Railways) since 2024, the Cairo ladolid HV line
CTC has been put into service, allowing centralized operation Maintenance of interlockings, train-protection, CTC, detec-
of this entire line, the main one in the country. tion systems, telecoms (fixed, GSM-R) and safety assets on the
On the Cairo – Beni Suef Corridor, the design phase of the Olmedo–Zamora–Pedralba–Taboadela–Ourense–Santiago
Project has been successfully completed, with deployment corridor
and installation activities of signaling and telecommunicati- Similar maintenance on Antequera–Granada and Chamartín– guía de empresas
ons equipment under way at Bashteel Station, the main station Torrejón de Velasco HV sections
of this line. Maintenance of traffic control facilities and complementary
facilities of the Madrid-Zaragoza – Barcelona – French Border
Mexico high-speed line
Maintenance of interlocking facilities, train protection sy-
Supervision, communication, signalling and ticketing for Me- stems, centralized traffic control, auxiliary detection systems,
xico–Toluca interurban line fixed telecommunications, and protection and safety facilities
of the New Chamartín – Torrejón de Velasco Branch High-
Turkey Speed Line.
Technical support for Hitachi Rail equipment in Adif conven-
Installation of advanced ETCS Level 1 for this section and Le- tional network
vel 2 for the Köseköy - Eski‐ehir section, as well as an updated Maintenance of signalling in six conventional network sub-di-
interlocking system. rectorates
Installation of a centralized traffic control system, electronic Expert maintenance for Hitachi Rail safety installations on Adif
interlockings, ETCS Levels 1 and 2 on the Kayas-Yerkoy sec- network
tion. Maintenance services for La Robla–Pola de Lena and Figue-
Modernization of the suburban network in the Gaziray urban res–Perpignan HV lines.
area. Level 1 maintenance support for Traffic Control Systems on a
Signaling solutions, such as interlockings, centralized traffic conventional network through the MIS contract in the opera-
control (CTC) and ETCS L1 for the Ankara-Yerköy high-speed tional sub-directorates Center, North, South, and Northeast.
section. Temporary speed restriction systems on the Kirikkale- Level 1 maintenance support for Telecommunications Sy-
Yerköy section. stems on a conventional network through the MIT contract
Installation of a centralized traffic control system, electronic in the operational sub-directorates Center, North, South, and
interlockings, ETCS Levels 1 and 2 in the new Ankara - Bas- Northeast.
kent station, suburban, freight, and high-speed network.
Installation of interlockings and ETCS Level 1 & 2 and tele- RENFE
communications for the Geyve-Dogançay (15km) and Inönü- LZB train-control system maintenance at Madrid core
Köseköy sections. Signalling and point-machine maintenance at RENFE Manuf-
acturing
SERVICES
Adif (Infrastructure Manager) Iryo
ETR1000 train maintenance
Maintenance of fixed/mobile telecommunications, GSM-R,
mobile-operator infrastructure, Central GSM-R core, central Metro de Madrid
telecoms management, power remote control, high-speed- Rolling stock maintenance
track detector control (Madrid–Valladolid, Olmedo–Medina, Support for the maintenance of the MdM MUS IP network
Madrid–Sevilla, Córdoba–Málaga, La Sagra–Toledo, Madrid–
Valencia, Albacete branch, Madrid–Barcelona–France border, ETS / Basque Rail Network
Zaragoza–Huesca, Tarragona–Vandellós) Tramway and railway signalling maintenance
Signalling, train-protection, basic supervision, energy-systems
and technical buildings maintenance on Madrid–Albacete– FGV (Valencian Regional Railways)
Valencia HV line Signalling, level-crossing and operational telephony systems
Traffic-control facilities on Madrid–Seville, La Sagra–Toledo, maintenance in Alicante network
Córdoba–Málaga branches
Traffic control and related facilities on Madrid–Segovia–Val-
Spanish Railway Yearbook 2026 Anuario del Ferrocarril 387

