company guide Maintenance of signaling and telecommunications installati- Commissioning of several sub-phases of the Valladolid By-
pass.
ons on conventional network lines
New Cabezuela Branch (Puerto Real).
Maintenance of installations on the Madrid-Lleida-Zaragoza-
Migration of telecommunications networks LAV Córdoba-
Barcelona-French Border high-speed line
Málaga.
Maintenance of the Pajares Variant (La Robla – Pola)
Maintenance of Renfe Maintenance facilities
Renovation of video surveillance, access control, and anti-
intrusion equipment on the Madrid – Lérida – Barcelona HSR.
Detailed engineering and initial implementation of a Cyberse-
SERVEIS FERROVIARIS DE MALLORCA
Installation ETCS L 1
connectivity topologies, and anomaly detection in Adif’s ope-
rational environments.
Turkey
Design, supply and supervision of central signalling systems curity solution with the capability of self-discovery of assets,
at Kapıkule station Bizkaia Transport Consortium
Design, supply, and installation of the central signaling sy-
stems for the Mersin Andana Gaziantep line.Design, supply Maintenance, evolution, and updating of the Barik Card Ad-
and supervision of central signalling systems for Line ministration and Management System.
Design, supply, and supervision of the installation of the cen- Hardware and Software evolution of the Bilbao Metro Central
tral signaling systems for the Sincan-Yenikent-Kazan Soda line Control Station to manage obsolescence.
ETS/RFV (Basque Rail Network)
Major Milestones
Design, implementation, and maintenance of an ERTMS/ETCS
Adif (Infrastructure Manager) system on the Basque Railway Network managed by ETS.
- New Anoeta station: project for the installation of signaling,
Execution of the installation work of new object fall detection adaptation of communications, and the power system for the-
(DCO) equipment on the Madrid – Seville high-speed line. se facilities.
Drafting of the construction project and execution of the
works for the removal of telephone blockages in the Ortiguei- Cantabria Government
ra-Ribadeo section.
Execution of the construction works project for the removal of Control center, information management and compensation,
telephone blockages between Torralba and Soria. and security platform of the unified payment system integrated
Commissioning of the 1,292 track circuits that make up the with Cantabria transportation.
renewal project of the Madrid-Seville high-speed line.
Execution works of the security and communications installa- RENFE
tions project for the Vitoria-Gasteiz intermodal and logistics
platform, Phase 1.1, and its standard gauge connection to the Maintenance of security facilities and motorization of switches
Atlantic Corridor. in BMSs and BMIs of RENFE Fabrication and Maintenance.
Removal of telephone blockages between Zafra-Huelva
Freight and Zafra-Llano de la Granja. Spanish Ports
Development and implementation of the first Unified Control
Center for ERTMS on the northwest High-Speed line. Development of new functionalities for the security facilities
Renovation and modernization of railway signaling on the of the railway terminals located inside the port of Huelva.
Trubia-Oviedo section, in the Asturias Cercanías network. Automation and monitoring of the Port of Marín, in Ponte-
Electronic interlocking on the Jundiz logistics platform railway vedra.
line, Vitoria-Gasteiz.
Renovation of the interlockings on the Madrid-Sevilla line and Egypt
start of the line, and tests of the ERTMS Level 2 system. Egypt’s railway network has taken another great step forward
Implementation of track configuration changes at Puertollano with the successful commissioning of Sohag Station, the latest
station. - Reconfiguration of the Atocha Cercanías track yard. of the Asyut – Nagh Hammadi Corridor, which is now fully
Doubling of the high-speed track on the Río Duero – Vallado- modernized.
lid section of the Madrid-Valladolid line. On the Cairo – Alexandria Corridor, in commercial operation