Page 297 - Anuario FFCC - 2026
P. 297
apron in front of Terminal 1 and the New Terminals 2/3, So- Córdoba (Badajoz, Spain) *Road intervention program for the
fia International Airport (Bulgaria) *Consultancy for the de- equity Invias (Colombia) *Works supervision at K15 road from
sign and supervision of the new air traffic control tower and Tierralta to San Pedro de Uraba (Colombia) *Technical and
fire station at JIAP – Karachi Airport (Pakistan) *Engineering administrative supervision of Public Private Partnership (PPP)
Services for Expansion Project of Jorge Chávez International Cambao-Manizales (Colombia) *Consultancy services for
Airport - newLIM (Peru) *Project Management Construction the elaboration of the feasibility study of the roads: Phalodi– guía de empresas
of South Terminal, Tocumen International Airport (Panama). Nagour, Beawar–Gulabpura, Beawar–Pisangan, Arai–Sarwar,
*Masterplans for Pacifico area (Colombia) *Field flight Ana- Kuchaman-Renwal–Kishangarh, Talanpur - Dhanapa -Kawa-
darko Moçambique Area 1 Monzanbique Lng (Mozambi- spura (India).
que) *Design Widening Taxiway echo. International Airport
Sangsters – Montego Bay (Jamaica) *Designing of the different Innovations:
actions (flight fields, control tower, SEI, urbanisation and ac- CEMOSA is a Founding Member of the European iniciative
cesses, water networks, automatic system for baggage) in the “Europe’s Rail Joint Undertaking” through the ‘European
International Airport of Palmerola (Honduras) *Design of the Smart Green Rail Joint Venture’ (eSGR JV) consortium, led
terminal building and taxiway extension at International Air- by CEMOSA. CEMOSA was already an Associated Member
port “El Dorado” (Bogotá, Colombia) *Contract for the design, of Shitt2Rail JU (predecessor of Europe’s Rail). CEMOSA’s
construction, operation, and maintenance of the infrastructure participation in these European initiatives is the result of the
of the International Airport Rafael Núñez, Cartagena (Colom- company’s strategic CEMOSA’s participation in these Euro-
bia) *Supervision and conditioning of the gates h-6, h-7, and pean initiatives is the outcome of the strategic commitment
h-8 in the airport of Palma de Mallorca (Spain) *Extension of of the company with Research and Innovation activities in the
the terminal building of the Sevilla Airport *Supervision of field of railway infrastructures. Being a member of Europe’s
the conditioning works in the platform. Phase II – Airport of Rail Joint Undertaking ensures CEMOSA’s enrolment in inter-
Lanzarote (Spain). national research projects dealing with railway infrastructures
as far as 2027 and consolidates the company long term strate-
Roads: *Technical Assistance to Project Management for gic railway research agenda. In the Europe’s Rail initiative, CE-
the Control and Supervision of the Execution Works of the MOSA is involved in 2 projects (IAM4RAIL and RAIL4EARTH).
Southwest Green Walk (A5-Paseo de Extremadura) *Final En- In the project “IAM4RAIL Holistic and Integrated Asset Ma-
gineering Studies for the road rehabilitation of the E-25, San- nagement for Europe’s RAIL System”, works on the imple-
to Domingo – Las Mercedes – 10 de Agosto – San Miguel mentation and demonstration of intelligent maintenance tools
de los Bancos section, 62.4 km long (Ecuador) *Health and for civil engineering asset management. On the other hand,
Safety Coordination during the execution of works on State in the project “RAIL4EARTH Europe’s Rail Flagship Project
Roads: Castilla y León Oriental, Castillas y León Occidental, 4 - Sustainable and green rail systems” CEMOSA works on
Andalucía Oriental, Andalucía Occidental, Asturias and La the implementation and demonstration of energy digital twins
Rioja. *Technical Assistance to the site management of the of railway stations (lighting, HVAC and scheduling) and fle-
construction project for the upgrading of the Nudo Norte. BIM xibility mechanisms to create energy hubs for future energy
management in the construction phase (Madrid City Council). markets.
*Urbanisation project for the infrastructure improvement plan Within the Shift2Rail Initiative, CEMOSA takes part in five
for the Torreblanca del Sol urbanisation (Fuengirola) *Expan- projects. In “Research into enhanced tracks, switches and
sion and extension of Calle Golondrinas including a 330 m structures” (IN2TRACK, IN2TRACK2 and IN2TRACK3), CE-
bridge in Fuengirola (Málaga) *Study and design of the sec- MOSA develops models and design tools for the validation
tion of the road to Nanzal and of the vehicular and pedestrian of the new components in the track and the development of
bridge over the river Chame, Chame District (Panama) *Con- dynamic behaviour models for bridges in order to analyse the
sultancy for feasibility studies, Integral structuring and strategy performance of the structure. CEMOSA also develops new en-
for the construction and promotion of a specialized logistic vironmentally sustainable support layers for ballastless tracks,
infrastructure (ILE) or logistic platform within the northea- underwater auscultation equipment for bridge pile inspections
stern expansion zone of the city of Buenaventura (Colombia) and structural analysis under a probabilistic approach. Mo-
*Design and construction for the upgrading of the roads of reover, CEMOSA participates in IN2SMART e IN2SMART2:
the Mesa district, Veraguas (Panama).*Works supervision at “Intelligent Innovative Smart Maintenance of Assets by in-
Highway SE-40, South Urban Ring Road of Coria del Rio - tegrated Technologies”, where they collaborate in the design
Almensilla (Seville, Spain) *Works supervision at Castilblan- of advanced algorithms for the detection of failure and the
co viaduct over García Sola reservoir, road CN-502 Avila- assessment of degradation in railway components using data
Spanish Railway Yearbook 2026 Anuario del Ferrocarril 295

