Page 296 - Anuario FFCC - 2026
P. 296

company guide  Management team:                         Diligence for light rail in Barranquilla (Colombia) *Feasibili-

                                                                   ty study for railway access to Container area in the Port of
                                                                   Buenaventura  (Colombia)  *Consulting  services  to  carry  out
                                                                   the process of due diligence, intervention plans and integral
                 Chief Executive Officer (CEO): Luis Jiménez Redondo. Chief
                                                                   structuration:  technical (including  designing), financial and
                 Operating Officer (COO): Francisco Ureña Fernández. Chief
                                                                   legal of the central transport terminal, commuting stations and
                                                                   massive transport system APM, which includes passenger sta-
                 Technology Officer (CTO): Noemi Jiménez Redondo. Chief
                 Corporate Officer (CCO). Andrés Céspedes Ortega. Global
                                                                   tions, approximately 19 km in the municipiality of Rionegro
                 HR Director: Alejandro Ramírez Agudo. Country Director -
                 Spain: Sergio Ocaña Agüera.
                                                                   gonhas and Campo Belo, *Railway stations at CPTM Line 13
                                                                   (Sao Paulo, Brazil): Airport station, CECAP and Eng. Goulart.
                 Activity: Engineering and Consulting.             (Colombia) *Metro stations at Line 17 (Sao Paulo, Brazil): Con-
                                                                   *Morro da Suade tunnel at coastal recovery Project for Olim-
                                                                   pic Games (Prefeitura de Rio de Janeiro, Brazil).
                 Main products and services:
                 Centro de Estudios de Materiales y Control de Obra, S.A.   Site supervision, Health and Safety Coordination in railway
                 (CEMOSA) is an engineering  consultancy and quality con-  works: * Emergency works and services prompted by the ac-
                 trol company in the field of construction. The main business   cident in the vicinity of the Adamuz decommissioning post,
                 areas are: Transport Infrastructures (railways, roads, airports   Line 010, Madrid–Seville High-Speed Line (LAV) *Engineering
                 and ports), Building, Materials Quality Control, Geothecnics,   services in support of the supervision and inspection of the
                 Certification, Sostenibility, Health and Safety and R&D. The   works at São Joaquim Station, Line 1, for its connection with
                 services offered in the field of Railway Infrastructures are: fea-  Line 6 – Orange (São Paulo, Brazil).*Site supervision for the
                 sibility studies, geotechnical studies, detailed designs, Project   Execution of the Construction Works of the New Railway Ac-
                 Management, work direction, topography, material quality   cess to the Port of Seville *Health and Safety Coordination
                 control, technical and environmental site supervision, testing   during the execution of works on high-speed lines in the North
                 facilities, pathology studies, Health&Safety coordination, and   and Northwest of Spain (Valladolid-Asturias). * Consultancy
                 R&D.                                              and Technical Assistance for the control and monitoring of
                                                                   the works and actions on the Monforte del Cid-Murcia High
                 Top products: ENGINEERING AND CONSULTING: 1. cem-  Speed Line. Management of the commissioning of High-Speed
                 BOX Building Platform: Digital Twin for energy efficiency in   Lines. *Quality and Healthy&Safety audit of platform construc-
                 buildings. 2. cemBOX Infra Platform: Digital Twin oriented   tion works at high-speed line Bobadilla-Granada (Andalusia,
                 Civil Infrastructure Asset Management Platform.   Spain) *Civil works, acoustic attenuation, and drainage repair
                                                                   at high-speed line León-Asturias (Variante de Pajares) (Spain).
                 Activities in the year:
                 Some of the main and most representative railway activities   Quality Control for railway infrastructure: * Material inspec-
                 during 2025 and previous years are listed as follows.  tion control for the Technical Inspection of the State Railways
                                                                   Project, Alameda–Melipilla Train, Melipilla–Malloco Section,
                 Railway infrastructure design:  *Consultancy and  Technical   Santiago (Chile) *Quality control for Line 3, Subsection III of
                 Assistance for the control and monitoring of works and actions   the Seville Metro *Quality Control of the Construction Pro-
                 on the Monforte del Cid-Murcia high-speed line. Management   ject for Line 5 of the Bilbao Metropolitan Railway * Quality
                 of the commissioning of high-speed lines. *Removal of level   control of the construction project for the platform connecting
                 crossings on the Córdoba - Málaga line (ADIF) *Revision, ad-  the Madrid–Valladolid and Madrid–Olmedo–Zamora–Galicia
                 aptation and construction project for pedestrian and vehicles   High-Speed Lines in the Olmedo area *Material quality con-
                 bridge on the Madrid-Sevilla line at m.t. de Lora del Río (ADIF)   trol of Line 1 of Metro de Ciudad de Panamá (Panama) *Mate-
                 *Consultancy services for the project of the suppression of the   rial quality control of Lines 1 and 2 of Metro de Málaga (Spain)
                 pedestrian level crossings of Camí de Ca na Dolça in Ver-  *Material quality control of track construction of High Speed
                 ge de Lluc (Palma) and Sa Farinera (Marratxi) of the Mallorca   Train in the North corridor (Spain).
                 railway service network *Renovation of the track at Aboño
                 station, Port of Gijón *Drafting of projects for the removal of   Activities in other fields of transport engineering: Some acti-
                 level crossings on line of the conventional network in Orense-  vities in other transport engineering fields are listed as follows.
                 Monforte-Lugo (ADIF) *Project for the removal of level cros-
                 sings on the La Encina-Valencialine (Benifaió,Valencia) *Due   Airports: * Design engineering for the reconfiguration of the




       294                                                     Anuario del Ferrocarril 2026 Spanish Railway Yearbook
   291   292   293   294   295   296   297   298   299   300   301