Cookie Consent by FreePrivacyPolicy.com Company tab: AYESA - Revista VÍA LIBRE - Fundación de los Ferrocarriles Españoles

Company: Company tab

AYESA

Versión en castellano

Postal address Marie Curie, 2 PCT Cartuja
E-41092 Sevilla. Spain
Telephone +34 95 446 70 46 E-mail ayesa@ayesa.com Web www.ayesa.com
Company data
Management team

President: José Luis Manzanares Japón. CEO: José Luis Manzanares Abásolo. Managing Director for Engineering: Rosalío Alonso.

Main products and services

Studies and designs (transport plans, feasibility studies, preliminary designs and detailed designs).

Independent engineers.

Testing and commissioning.

Operating and maintenance of underground rail infrastructures.

Construction management and supervision.

 

Top products: ENGINEERING AND CONSULTING: 1. Line 1 of Quito Metropolitan Railway. 2. Lima Metropolitan Railway.

 

Activity Engineering and Consulting, Other.

Activities by year

Projects in 2019: Railways:

Consulting services and technical assistance for the drafting of the construction project for the connection of the Madrid-Seville and Cordoba-Malaga high-speed lines, near Almodóvar del Río (Cordoba Province).

Consulting services and technical assistance for the drafting of the construction project for the duplication of the Cáceres-Mérida section. Madrid-Extremadura high-speed line.

Consulting services and technical assistance for the drafting of the construction project for the duplication of the North–North-Eastern high-speed corridor. Palencia-Vilecha Junction high-speed section (part of the national rail network).

Drafting of comprehensive improvement projects for the infrastructure of the Madrid- Seville high-speed line.

Consulting services and technical assistance for the control and monitoring of the execution of the construction project for the installation of the line on the Campobecerros-Taboadela section, and the execution of the construction project for noise reduction infrastructure. Madrid-Galicia high-speed line. Section: Pedralba de la Pradería-Ourense, phase 1 (Pedralba de la Pradería-Taboadela).

Assistance services to provide construction supervision for the platform of the North to North-West high-speed line. Section: Valladolid-Burgos-Vitoria. Sub-sections: Villazopeque-Estépar and Estépar-Burgos railway bypass.

Construction supervision for the rail link between the Mediterranean Corridor and high-speed line Madrid-Barcelona-French border.

Consulting and assistance to provide construction supervision for the platform of the high-speed line Madrid-Extremadura. Talayuela-Cáceres. Section: Cañaveral-Alcántara Dam.

Technical assistance services to provide construction supervision for the platform of the high-speed line Vitoria-Bilbao-San Sebastián. Section: Mondragón-Elorrio-Bergara. Sector 1.

Consulting services and technical assistance for the control and monitoring of the execution of the construction project for the Miamán installation base and auxiliary facilities for the installation of the line on the North–North-Eastern high-speed corridor. Olmedo-Lubián-Ourense section, Pedralba de la Pradería-Taboadela subsection.

Consulting services and technical assistance for the control and monitoring of the execution of the construction project for the installation of the line on the Campobecerros-Taboadela section, and the execution of the construction project for noise reduction infrastructure. Madrid-Galicia high-speed line. Section: Pedralba de la Pradería-Ourense, phase 1 (Pedralba de la Pradería-Taboadela).

Construction management for the emergency repair work carried out on line 422: Utrera-Fuente de Piedra junction, due to the serious damage caused by floods on the 20 and 21 October 2018, for the Seville Maintenance Authority.

Metro systems:

Drafting of the project for the sheds at Cuatro Caminos for TMB.

Engineering services for construction work involved in Line 4 of the Riyadh Metro.

Construction project for Line 2 and Line 4 of the Lima Metro.

Project management, interface coordination and technical assistance for Line 2 of the Panama Metro.

Technical assistance contract for the management of construction work for the infrastructure and superstructure belonging to lines 1 and 2 of the Malaga Metro. Section: Guadalmedina-Atarazanas.

Bidding project for the first line of the Bogotá Metro.

Telecommunications project for lines 4, 5 and 6 of the Riyadh Metro.

Construction engineering project for Line 6 of the Riyadh Metro.

Innovations

Innovations in 2019:

R&D

The company continues to carry out extensive R&D&i work as part of its goal to create solutions and apply the most advanced technology to the needs of its customers. It carries out this area of its work mainly through projects in conjunction with customers, universities, research centres and other companies, and receives incentives and funding from bodies such as the Centre for the Development of Industrial Technology (CDTI) and the European Commission (EC). The main publicly funded research, development and innovation project carried out in 2019 was SuperPV, which aims to develop high-quality photovoltaic systems based on a hybrid combination of technological innovation and business operation solutions. In order to drive down costs through innovation, the project focuses on three fundamental areas which affect the performance of photovoltaic systems: innovation in terms of photovoltaic modules, power electronics on modules, and the combining of photovoltaic systems and innovative processes. As part of this project, Ayesa has developed an innovative smart O&M (operation and maintenance) tool, which harnesses the advantages offered by the IoT and data mining for PV power station maintenance. The goal is to improve profitability and efficiency by implementing a digital twin model that allows faults and losses to be pre-empted and therefore avoided.

Areas Head office: Seville.
Offices: Mexico, Panama, Colombia, Ecuador, Chile, Peru, Brazil, Spain, Italy, United Kingdom, Germany, Morocco, Algeria, Saudi Arabia and India.

Certifications Quality and Environment:
- Quality Management, according to the standard ISO 9001
- Environmental Management, according to the standard ISO 14001
Turnover 276 million Euros
No. of employees 4,769
Activities Engineering and consulting, Others.
Previous company
see other company tabs
Next company