Page 500 - Anuario FFCC - 2026
P. 500

company guide  In Latin America, detailed design has commenced for the ex-  studies for the extension of the Cairo metro line 1. The exten-

                 tension of the first line of the Quito metro, Ecuador. In Me-
                                                                   sion is 19 km long with 14 stations.
                 xico, we are carrying out the construction supervision of the
                                                                   In Australia, we continue working in Sydney on the detailed
                 infrastructure and track works on the Union San Javier-Arroyo
                                                                   design and technical support during the construction of the
                 El Sauz stretch, and the supervision of the design and con-
                                                                   tunnel and the excavation sites of 5 stations, corresponding to
                 struction for the section Unión San Javier-Joyas Anahuac, in
                                                                   the 11 km twin central section of the Sydney Metro West Line,
                 the metropolitan area of Monterrey, Nuevo León, both on the
                                                                   between The Bays and Sydney Olympic Park stations.
                 Saltillo-Nuevo Laredo railway line. In Brazil, we are oversee-
                 ing the São Paulo Metro Line 6 (Orange) project.
                 In Europe, in Sweden, we prepared the preliminary design for
                                                                   services at the Campo Grande High Speed Station in Valla-
                                                                   dolid. In Madrid, the major railway and urban development
                 the infrastructure to increase capacity of the Norge-Vänerba-  In Spain, we are providing construction management support
                 nan line between Öxnered and Göteborg, in Älvängen.  We   known as “Madrid Nuevo Norte” sees TYPSA supervising the
                 continue providing support services on the Stockholm metro   expansion and remodelling of high-speed tracks and platforms,
                 blue line extension and have started supervision of one stretch,   together with the passenger building and a new high-speed
                 as well as the detailed design for the new Yellow line between   technical building.  We are also carrying out the construction
                 Fridhemsplan y Älvsjö. In the United Kingdom, work conti-  management and supervision of the Madrid Metro Line 11 ex-
                 nues on the design of sections S1, S2, C2 and C3 of the HS2   tension, and the construction management for the extension of
                 high speed line between London and Birmingham. In Ireland,   Line 5 to the Adolfo Suárez Madrid-Barajas airport.
                 we are providing consulting services for the remodelling and   In Aragon, we provided construction supervision of the works
                 expansion of the 20 km long Kildare line in the Dublin area   to improve the Zaragoza-Teruel-Sagunto railway line, and we
                 rapid transit network (DART). We are also carrying out the   prepared the detailed design for the upgrade of the internatio-
                 preliminary design and support services in the administrative   nal railway tunnel of Somport, on the Zaragoza-Canfranc-Pau
                 approval stage of the improvement works for the local railway   line.
                 network in Cork. In Portugal, we are carrying out the detailed   In Valencia, we carried out the construction supervision at the
                 design for the renovation of the Pocinho-Barca d’Alva section,   Intermodal and Logistics Terminal of Fuente San Luis, and are
                 on the Duero Line, and the technical and environmental fea-  also actively collaborating on the construction supervision of
                 sibility study of the New Vale do Sousa railway line, together   the works for the Integration of the High-Speed railway infra-
                 with the modernisation of various sections of the North Line.   structure in Valencia. The scope includes taking the railway
                                                                   accesses to Joaquin Sorolla and Valencia Nord stations under-
                 In Asia, in India, TYPSA is providing project and construc-  ground. We continue with the construction management and
                 tion management services for the new Kanpur Metro and Agra   environmental support services for the intermodal platform in
                 Metro networks.  The scope includes a total of 62 km on 4   the Parc Sagunt II logistics area, in Sagunto.
                 lines, with 57 stations and 4 depots. We are also carrying out   In Barcelona, we are engaged in the construction supervision
                 project management and construction supervision of the Vija-  of the renovation works of the Montcada Bifurcación railway
                 yawada Metro Rail Project, Andhra Pradesh state. The scope   station, and the construction supervision of the completion
                 consists of two lines with a length of 38.40 km, 32 elevated   and commissioning of the new rail access to terminals T1 and
                 stations and one underground. We are also carrying out the   T2 at Barcelona Airport.
                 construction supervision of the section between Digras and   In Euskadi, we are carrying out the detailed design for the Be-
                 Palshi stations on the new Yavatmal-Nanded railway line in   tono depot on the Vitoria-Gasteiz tramway and connecting
                 the state of Maharashtra.                         branch. We are also involved in construction supervision ser-
                 In the Middle East, in Saudi Arabia, we are lead designers for   vices for the new railway station in Usurbil, Gipuzkoa, the
                 the Saudi Landbridge Railway Network, which will connect   construction supervision of the works at the new Bidebieta
                 Jubail–Dammam–Riyadh–Jeddah-Yanbu. We are preparing   railway station in Basauri, Gipuzkoa, and construction super-
                 the conceptual design, the transport model, and the definition   vision of the new train depot at Zumaia station, Gipuzkoa.
                 of operations and maintenance for over 1,900 km.  In Castilla y León, we are carrying out the detailed design of
                 In Oman we are carrying out the detailed design for two rail   the trackbed on the Madrid-Basque Country-French border
                 cargo terminals on the Hafeet line between Oman and Abu   high-speed line between Piernigas and Pancorbo.
                 Dhabi.                                            In Seville, we are involved in the project and construction ma-
                                                                   nagement for the completion of the railway system to Alcala
                 In Egypt we are carrying out the preliminary and feasibility   de Guadaira. In Málaga, we are carrying out the preliminary




       498                                                     Anuario del Ferrocarril 2026 Spanish Railway Yearbook
   495   496   497   498   499   500   501   502   503   504   505