Page 500 - Anuario FFCC - 2026
P. 500
company guide In Latin America, detailed design has commenced for the ex- studies for the extension of the Cairo metro line 1. The exten-
tension of the first line of the Quito metro, Ecuador. In Me-
sion is 19 km long with 14 stations.
xico, we are carrying out the construction supervision of the
In Australia, we continue working in Sydney on the detailed
infrastructure and track works on the Union San Javier-Arroyo
design and technical support during the construction of the
El Sauz stretch, and the supervision of the design and con-
tunnel and the excavation sites of 5 stations, corresponding to
struction for the section Unión San Javier-Joyas Anahuac, in
the 11 km twin central section of the Sydney Metro West Line,
the metropolitan area of Monterrey, Nuevo León, both on the
between The Bays and Sydney Olympic Park stations.
Saltillo-Nuevo Laredo railway line. In Brazil, we are oversee-
ing the São Paulo Metro Line 6 (Orange) project.
In Europe, in Sweden, we prepared the preliminary design for
services at the Campo Grande High Speed Station in Valla-
dolid. In Madrid, the major railway and urban development
the infrastructure to increase capacity of the Norge-Vänerba- In Spain, we are providing construction management support
nan line between Öxnered and Göteborg, in Älvängen. We known as “Madrid Nuevo Norte” sees TYPSA supervising the
continue providing support services on the Stockholm metro expansion and remodelling of high-speed tracks and platforms,
blue line extension and have started supervision of one stretch, together with the passenger building and a new high-speed
as well as the detailed design for the new Yellow line between technical building. We are also carrying out the construction
Fridhemsplan y Älvsjö. In the United Kingdom, work conti- management and supervision of the Madrid Metro Line 11 ex-
nues on the design of sections S1, S2, C2 and C3 of the HS2 tension, and the construction management for the extension of
high speed line between London and Birmingham. In Ireland, Line 5 to the Adolfo Suárez Madrid-Barajas airport.
we are providing consulting services for the remodelling and In Aragon, we provided construction supervision of the works
expansion of the 20 km long Kildare line in the Dublin area to improve the Zaragoza-Teruel-Sagunto railway line, and we
rapid transit network (DART). We are also carrying out the prepared the detailed design for the upgrade of the internatio-
preliminary design and support services in the administrative nal railway tunnel of Somport, on the Zaragoza-Canfranc-Pau
approval stage of the improvement works for the local railway line.
network in Cork. In Portugal, we are carrying out the detailed In Valencia, we carried out the construction supervision at the
design for the renovation of the Pocinho-Barca d’Alva section, Intermodal and Logistics Terminal of Fuente San Luis, and are
on the Duero Line, and the technical and environmental fea- also actively collaborating on the construction supervision of
sibility study of the New Vale do Sousa railway line, together the works for the Integration of the High-Speed railway infra-
with the modernisation of various sections of the North Line. structure in Valencia. The scope includes taking the railway
accesses to Joaquin Sorolla and Valencia Nord stations under-
In Asia, in India, TYPSA is providing project and construc- ground. We continue with the construction management and
tion management services for the new Kanpur Metro and Agra environmental support services for the intermodal platform in
Metro networks. The scope includes a total of 62 km on 4 the Parc Sagunt II logistics area, in Sagunto.
lines, with 57 stations and 4 depots. We are also carrying out In Barcelona, we are engaged in the construction supervision
project management and construction supervision of the Vija- of the renovation works of the Montcada Bifurcación railway
yawada Metro Rail Project, Andhra Pradesh state. The scope station, and the construction supervision of the completion
consists of two lines with a length of 38.40 km, 32 elevated and commissioning of the new rail access to terminals T1 and
stations and one underground. We are also carrying out the T2 at Barcelona Airport.
construction supervision of the section between Digras and In Euskadi, we are carrying out the detailed design for the Be-
Palshi stations on the new Yavatmal-Nanded railway line in tono depot on the Vitoria-Gasteiz tramway and connecting
the state of Maharashtra. branch. We are also involved in construction supervision ser-
In the Middle East, in Saudi Arabia, we are lead designers for vices for the new railway station in Usurbil, Gipuzkoa, the
the Saudi Landbridge Railway Network, which will connect construction supervision of the works at the new Bidebieta
Jubail–Dammam–Riyadh–Jeddah-Yanbu. We are preparing railway station in Basauri, Gipuzkoa, and construction super-
the conceptual design, the transport model, and the definition vision of the new train depot at Zumaia station, Gipuzkoa.
of operations and maintenance for over 1,900 km. In Castilla y León, we are carrying out the detailed design of
In Oman we are carrying out the detailed design for two rail the trackbed on the Madrid-Basque Country-French border
cargo terminals on the Hafeet line between Oman and Abu high-speed line between Piernigas and Pancorbo.
Dhabi. In Seville, we are involved in the project and construction ma-
nagement for the completion of the railway system to Alcala
In Egypt we are carrying out the preliminary and feasibility de Guadaira. In Málaga, we are carrying out the preliminary
498 Anuario del Ferrocarril 2026 Spanish Railway Yearbook

