Top products: INFRASTRUCTURE: 1. Implementation of the Certificate of the Energy Management System in accordance
construction work of the New Parla Norte Station (Madrid). with the ISO 50001:2018 standard assigned registration num-
Work on railways. RAILWAY: 2. Execution of the works of ber GE-2014/0023.
the Track Renewal Project at the Negrilla Logistics Center. CO2 Compliance Certificate calculated in accordance with
the requirements of the GHG PROTOCOL assigned registrati-
Activities this year: on number GHG-0099/2023. guía de empresas
A number of ongoing projects being carried out by ORTIZ CON- Certificate from the Occupational Health and Safety Manage-
STRUCCIONES y PROYECTOS, S.A. is provided as follows. ment System in accordance with the ISO 45001:2018 stan-
dard assigned registration number SST-0199/2012 (formerly
Implementation of the construction work of the New Parla OSHAS 18001:2007).
Norte Station (Madrid). Work on railways. Certificate from the Statutory Audit of Occupational Risk Pre-
New local railway station, to the north of the urban area of vention assigned registration number APRL-2022/0040.
Parla town. The station will be integrated into the currently All the aforementioned certificates were awarded by AENOR
operating Region of Madrid’s C-4 local railway. The station INTERNACIONAL, S.A.U.
will cover an area of 900 m2 and will comprise a single floor
with three differentiated areas: passenger hall, shopping area
and technical service facilities. The station will have platforms
210 m long and a minimum width of 5 m. An underpass will
link the platforms built using buried caissons measuring 5 m
wide and 3 m headroom.
Execution of the works of the Track Renewal Project at the
Negrilla Logistics Center.
The actions consist of improving the performance of the Ne-
grilla terminal by renewing the track materials of the general
tracks (tracks 1 and 2), reception and dispatch tracks (tracks OUIGO
4, 6 and 8), of the M2 handle track, and of the tracks in the
warehouse and warehouse area (28, 30, 32, 34 and 36). In Dirección postal / Postal address
addition, tracks 34 and 36 will be adapted to comply with the Calle Alfonso XII, 62,
uniform gauge. The following will be 28014 Madrid (España)
type 1 ballast, rail 54 E1, track gauge 1668mm and PR-VE prensa@ouigo.es
concrete sleepers will be used. https://www.ouigo.com/es/
To solve drainage problems, a geogrid and a geotextile will
be installed over a 15 cm sub-ballast layer, equipped with a
pumping system that will allow the platform to drain towards Equipo directivo:
the planned ditches. In addition, it is planned to dismantle the Directora General: Amandine Thomas-Commin
existing weighbridge on track 4, currently in disuse. Director de Recursos Humanos: Francisco Martín
Dirección Asesoría Jurídica, Regulación y Cumplimiento:
Geographical areas where our products and services are Patricia Miranda
available: Dirección de Planificación y Mantenimiento: Sergio
ORTIZ CONSTRUCCIONES y PROYECTOS, S.A. carries out Bárcena
its business activities nationally and internationally. Dirección de Seguridad: David Cortés
Dirección Financiera y Adquisiciones: Santiago Pérez de
Certifications: Ayala
Quality and Environment: Dirección Comercial y de Marketing: Federico Pareja
Quality Management System certificate in accordance with Dirección de Operaciones y Servicios: Pierre Grosmann
ISO 9001:2015 standard assigned registration number ER- Dirección de IT: Guillaume Dahan
0159/1997.
Environmental Management System certificate in accordance Actividad: Operadora Transporte Ferroviario.
with the ISO 14001:2015 standard assigned registration num-
ber GA-2000/0039.