Page 441 - Anuario FFCC - 2026
P. 441

Top products: INFRASTRUCTURE: 1. Implementation of the   Certificate of the Energy Management System in accordance
               construction work of the New Parla Norte Station (Madrid).   with the ISO 50001:2018 standard assigned registration num-
               Work on railways. RAILWAY: 2. Execution of the works of   ber GE-2014/0023.
               the Track Renewal Project at the Negrilla Logistics Center.  CO2 Compliance Certificate calculated in accordance with
                                                                the requirements of the GHG PROTOCOL assigned registrati-
               Activities this year:                            on number GHG-0099/2023.                         guía de empresas
               A number of ongoing projects being carried out by ORTIZ CON-  Certificate from the Occupational Health and Safety Manage-
               STRUCCIONES y PROYECTOS, S.A. is provided as follows.  ment System in accordance with the ISO 45001:2018 stan-
                                                                dard assigned registration number SST-0199/2012 (formerly
               Implementation of the construction work of the New Parla   OSHAS 18001:2007).
               Norte Station (Madrid). Work on railways.        Certificate from the Statutory Audit of Occupational Risk Pre-
               New local railway station, to the north of the urban area of   vention assigned registration number APRL-2022/0040.
               Parla town. The station will be integrated into the currently   All the aforementioned certificates were awarded by AENOR
               operating Region of Madrid’s C-4 local railway. The station   INTERNACIONAL, S.A.U.
               will cover an area of 900 m2 and will comprise a single floor
               with three differentiated areas: passenger hall, shopping area
               and technical service facilities. The station will have platforms
               210 m long and a minimum width of 5 m. An underpass will
               link the platforms built using buried caissons measuring 5 m
               wide and 3 m headroom.

               Execution of the works of the Track Renewal Project at the
               Negrilla Logistics Center.
               The actions consist of improving the performance of the Ne-
               grilla terminal by renewing the track materials of the general
               tracks (tracks 1 and 2), reception and dispatch tracks (tracks   OUIGO
               4, 6 and 8), of the M2 handle track, and of the tracks in the
               warehouse and warehouse area (28, 30, 32, 34 and 36). In   Dirección postal / Postal address
               addition, tracks 34 and 36 will be adapted to comply with the   Calle Alfonso XII, 62,
               uniform gauge. The following will be                          28014 Madrid (España)
               type 1 ballast, rail 54 E1, track gauge 1668mm and PR-VE        prensa@ouigo.es
               concrete sleepers will be used.                             https://www.ouigo.com/es/
               To solve drainage problems, a geogrid and a geotextile will
               be installed over a 15 cm sub-ballast layer, equipped with a
               pumping system that will allow the platform to drain towards   Equipo directivo:
               the planned ditches. In addition, it is planned to dismantle the   Directora General: Amandine Thomas-Commin
               existing weighbridge on track 4, currently in disuse.  Director de Recursos Humanos: Francisco Martín
                                                                  Dirección Asesoría Jurídica, Regulación y Cumplimiento:
               Geographical areas where our products and services are   Patricia Miranda
               available:                                         Dirección de  Planificación y  Mantenimiento: Sergio
               ORTIZ CONSTRUCCIONES y PROYECTOS, S.A. carries out   Bárcena
               its business activities nationally and internationally.  Dirección de Seguridad: David Cortés
                                                                  Dirección Financiera y Adquisiciones: Santiago Pérez de
               Certifications:                                    Ayala
               Quality and Environment:                           Dirección Comercial y de Marketing: Federico Pareja
               Quality Management System certificate in accordance with   Dirección de Operaciones y Servicios: Pierre Grosmann
               ISO 9001:2015 standard assigned registration number ER-  Dirección de IT: Guillaume Dahan
               0159/1997.
               Environmental Management System certificate in accordance   Actividad: Operadora Transporte Ferroviario.
               with the ISO 14001:2015 standard assigned registration num-
               ber GA-2000/0039.