Page 313 - Anuario FFCC - 2026
P. 313

Main products and services:                      ja). Construction of comprehensive infrastructure and track
               Coalvi is a company specializing in railway works, and its   renewal. Monforte de Lemos – Chapela junction line. Section:
               main service is the assembly and renovation of conventional   Redondela Station – Vigo-Guixar Station.
               and high-speed tracks (in all gauges and layouts). It also works
               on railway infrastructures such as stations, depots, tunnels,   Geographic areas where your products and services are mar-
               and complementary works. Additionally, it is involved in va-  keted:                              guía de empresas
               rious maintenance activities that deal with different elements   Spain, Mexico, Poland, Peru.
               and operations on railway infrastructure, such as turnouts and
               all types of track apparatus, leveling, stabilization and profi-  Certifications:
               ling, welding, vegetation control activities along the track, as   Quality and Environment: ISO 9001, ISO 14001, ISO 45001
               well as railway line electrification (catenary).

               Top products:  MAINTENANCE: 1. Comprehensive main-
               tenance of track, catenary, and power. Vegetation control.
               TRACK: 2 Renewal and installation of new track for track su-
               perstructure in UIC, Iberian, and metric gauges, using heavy
               track machinery.

               Activities in the year:
               Coalvi has developed key projects in the railway sector, both
               in high-speed and conventional lines, consolidating its exper-  COFREN S.A.S
               tise in infrastructure modernization, maintenance, and track   A Wabtec Subsidiary
               renewal.
                                                                            Av. Josep Tarradellas, 38
               Expansion of the Madrid commuter rail network to Soto del    08029 Barcelona. España
               Real. Phase 1. Infrastructure, track, and overhead contact line.   Tel.: +34 93 567 70 64
               Capacity increase of the section: Pinar de Las Rozas junction-  Fax: +34 93 567 70 78
               Las  Matas  station,  on  the  Madrid-Hendaye  line.  Track  and   nmorales@wabtec.com
               electrification. Maintenance and pre-maintenance services      www.wabtec.com
               for infrastructure, track, and track devices of the Madrid-East
               high-speed line (Requena and Monforte del Cid base areas).
               Construction of the track doubling and electrification in the   Descripción:
               section between Hospital Vila halt and Benidorm station. Ex-  Nuestro grupo es uno de los pocos fabricantes de material
               tension up to 750 m of usable siding length at Chiprana and   de fricción que dispone de una completa gama de productos,
               Nonaspe stations, in the province of Zaragoza, and Flix, in the   para satisfacer todas las necesidades en frenos en el mundo
               province of Tarragona, all belonging to line 210 Miraflores-  del ferrocarril. El material sinterizado de Cofren, equipa casi
               Tarragona, located at PPKK 442/733, 479/950, and 511/627,   todos los discos de frenos de alta velocidad en Europa. Todos
               respectively. Vegetation control services on conventional and   los operadores de mantenimiento ferroviario en Europa son
               narrow-gauge lines of the general interest railway network   clientes de Cofren.
               (RFIG).  . Lot  4: East  Operations  Subdirectorate. Execution
               works of the construction project. Algeciras – Zaragoza Rail-  Cofren, históricamente siempre ha sido líder en buscar so-
               way Highway. Venta de Cárdenas Tunnels 1, 2, 3, and 4; Las   luciones para el medio ambiente. Todos y cada uno de los
               Correderas 1, 2, and 3; Santa Elena; Calancha; Vilches; Espe-  departamentos de producción, investigación y desarrollo si-
               luy; Andújar; and Montoro. Construction of the northbound   guen un proceso riguroso de calidad; la búsqueda, desarrollo
               connection from the TMZ Terminal to the Zaragoza-Huesca   e industrialización de los productos de Cofren están hechos
               line. Phase 1. Terminal expansion (Phase 2) according to the   en nuestra fábrica asegurando en su totalidad el dominio de
               Construction Project drafted by “SERS, Engineering and Ar-  las tecnologías necesarias.
               chitecture Consultants, S.A.U.”. Maintenance of infrastructure
               and track for ADIF conventional and metric gauge lines (MIV).   Equipo directivo:
               Lot 4: East RC Operations Subdirectorate. Construction of the   Presidente: Philippe Nogues-Cubelles. Director Ventas Euro-
               Rincón de Soto bypass on the Castejón – Logroño line (La Rio-  pa: Elena Heinemann. Director España: Nuria Morales.




            Spanish Railway Yearbook 2026 Anuario del Ferrocarril                                               311
   308   309   310   311   312   313   314   315   316   317   318