Page 245 - Anuario FFCC - 2026
P. 245
Activity: Railway Safety, Engineering and Consulting. Speed Line (sections: Torrejón-Motilla, Motilla-Albacete and
Main products and services: Motilla-Valencia). Of the signaling and protection systems
of the ERTMS, CTC and auxiliary detection systems in the
Top products: ASSESSMENT, CERTIFICATION, RESEARCH Olmedo-Zamora-Galicia High Speed Line (section: Ourense-
AND TRAINING: 1. Assessment Body “AsBo”. MAINTE- Santiago) for ADIF; Of the signaling systems of the Granada
NANCE: 2. CROSS INSPECT. Tram. Evaluation of proposals to contests of the SCT Mexica- guía de empresas
na. Inspection of Quito Metro Facilities (Ecuador). Project for
Activities in the year: the installation of a “distance to go” signaling system (DTG)
Activities: 2007-2025: on Line 5 of the Madrid Metro for Siemens. Inspections of
the Level Crossings and of the Crossings between platforms
Consulting and Technical Assistance for the implementation for passengers in stations for the AESF. Drafting of signaling
of CBTC system (Communications-Based Train Control) on and communications projects for the Asunción-Guardo and
lines 1 and 6 of Metro de Madrid system. In 68 trains 2000 Ferrol - Ortigueira railway lines for ADIF. Drafting of con-
series and in 48 trains series 5000, respectively; Implementati- struction projects for signaling and communications for the
on of the CBTC and Driverless system on Line 7b (Metroeste) Asunción-Guardo railway lines; Ferrol - Ortigueira; Torre-
of the Madrid Metro; Signaling works and ATP / ATO of the lavega Santander; Xativa-Alcoy; suppression of 10 crossings
Metronorte and Metroeste lines and Metroeste links with line between platforms; all for ADIF. The Technical Assistance of
7 and Metronorte with line 10 for MINTRA; ATO-CTC for the the High Speed and Conventional lines of La Encina - Xàtiva-
extensions of the Metro Madrid. Technical Assistance in the Valencia, and the Technical Assistance for the works of new
Hortaleza Deposit (Madrid); Modifications on Speed Codes frequencies of the ASFA Digital and the inspection of 2,000
and Distance to Go systems in several lines (4, 5 and 10) of the Level Crossings for ADIF. In 2022, the electrification projects
Madrid Metro; Mounting of track in plate and electrification in the comprehensive renovation of the Padrún tunnels and
in the new connection between the Atocha and Chamartin Villabona tunnels on the LEÓN-GIJÓN line; the Parla station
stations. Signaling systems and train protection ERTMS, CTC halt project; of the construction project of the SANTANDER
and auxiliary detection systems in the Madrid-Levante High IISS; Technical assistance for the Silla-Cullera-Gandía line;
Speed Line (sections: Torrejón-Motilla, Motilla-Albacete and Montcada bifurcation interlocking; of the B.A.B. in FIGUE-
Motilla-Valencia), Olmedo-Zamora-Galicia High Speed Line RES-PORTBOU; electrical substations and electrification for
( section: Ourense-Santiago), Zaragoza-Huesca High Speed the eastern VALLADOLID railway variant; of the inspection
Line; High Speed Line Valladolid-León and Valladolid-Burgos and support in the management of the exploitation of the Me-
(VALEBU) for ADIF; Works for the Platform Screen Doors tropolitan of Granada.
installation in the Madrid Metro; Substitution of the catena- The most relevant technical assistance and construction pro-
ry of line 2 of Metro de Madrid; Track assembly work in the jects in 2023 were those of the railway security and telecom-
extension of Line 1 towards the Ensanche de Vallecas. Works munications facilities for access to the new Barcelona airport
for the implantation of electronic interlocking in the Deposit terminal, the security facilities resulting from the electrificati-
of Canillejas de Metro de Madrid; Implementation and start- on of the Ronda-Algeciras line, the elimination of telephone
up of the concessions of the light rail lines ML 1, ML 2 and blocking between Villanueva de la Serena – Brazatortas, the
ML 3 of the Community of Madrid for MINTRA; Modifications development and implementation of a unified control center
in Substations of the Madrid Metro; Signaling Supervision in for ERTMS (CCUE) and the adaptation of existing facilities and
several Metro Lines of Madrid. Implementation of rail-ground equipment on the high-speed lines in the Northwest area . The
protection implementation in 18 traction centers of the Ma- Level Crossing projects in various stations and routes for ENY-
drid Metro. Implementation of the signaling CBTC system SE, ICF and THALES, the low cost ERTMS and the Calatayud
and ITCS control center in the La Loma-Ciénaga Line and in BAB for Alstom.
the Rolling Stock of FENOCO (Colombia); Implementation of At the beginning of 2025, it contracted with EUSKAL TRENBI-
the ERTMS N1 system in the Sarmiento Line of Buenos Aires DE SAREA-RED FERROVIARIA VASCA (ETS) in a joint venture
(Argentina). For the tender for the concession of the Mósto- with SAITEC for the “Technical support service for the imple-
les - Navalcarnero line for OHL; For the tender of the Lima mentation of the ERTMS system in ETS. Usurbil - Hendaye
urban train concession for OHL; Of the systems of signaling section.”
and protection of the train ERTMS of High Speed Line Zara-
goza-Huesca (section: Tardienta-Huesca) for ADIF; Of the RAM and Safety Consulting: RAMS Supervision on Lines 1
systems of signaling and protection of the train ERTMS, CTC and 6 of the Madrid Metro; RAMS supervision on Line 7b
and auxiliary detection systems in the Madrid-Levante High- (Metroeste) of the Madrid Metro; RAMS Supervision in the
Spanish Railway Yearbook 2026 Anuario del Ferrocarril 243

