Page 245 - Anuario FFCC - 2026
P. 245

Activity: Railway Safety, Engineering and Consulting.  Speed   Line (sections: Torrejón-Motilla, Motilla-Albacete and
               Main products and services:                      Motilla-Valencia). Of the  signaling and protection systems
                                                                of the ERTMS, CTC and auxiliary detection systems in the
               Top products: ASSESSMENT, CERTIFICATION, RESEARCH   Olmedo-Zamora-Galicia High Speed Line (section: Ourense-
               AND  TRAINING:  1.  Assessment  Body  “AsBo”.  MAINTE-  Santiago) for ADIF; Of the signaling systems of the Granada
               NANCE: 2. CROSS INSPECT.                         Tram. Evaluation of proposals to contests of the SCT Mexica-  guía de empresas
                                                                na. Inspection of Quito Metro Facilities (Ecuador). Project for
               Activities in the year:                          the installation of a “distance to go” signaling system (DTG)
               Activities: 2007-2025:                           on Line 5 of the Madrid Metro for Siemens. Inspections of
                                                                the Level Crossings and of the Crossings between platforms
               Consulting and Technical Assistance for the implementation   for passengers in stations for the AESF. Drafting of signaling
               of  CBTC system (Communications-Based Train Control) on   and communications projects for the Asunción-Guardo and
               lines 1 and 6 of Metro de Madrid system. In 68 trains 2000   Ferrol - Ortigueira railway lines for  ADIF. Drafting of con-
               series and in 48 trains series 5000, respectively; Implementati-  struction projects for signaling and communications for the
               on of the CBTC and Driverless system on Line 7b (Metroeste)   Asunción-Guardo railway lines;  Ferrol - Ortigueira;  Torre-
               of the Madrid Metro; Signaling works and ATP / ATO of the   lavega Santander; Xativa-Alcoy; suppression of 10 crossings
               Metronorte and Metroeste lines and Metroeste links with line   between platforms; all for ADIF. The Technical Assistance of
               7 and Metronorte with line 10 for MINTRA; ATO-CTC for the   the High Speed and Conventional lines of La Encina - Xàtiva-
               extensions of the Metro Madrid. Technical Assistance in the   Valencia, and the Technical Assistance for the works of new
               Hortaleza Deposit (Madrid); Modifications on Speed   Codes   frequencies of the ASFA Digital and the inspection of 2,000
               and Distance to Go systems in several lines (4, 5 and 10) of the   Level Crossings for ADIF. In 2022, the electrification projects
               Madrid Metro; Mounting of track in plate and electrification   in the comprehensive renovation of the Padrún tunnels and
               in the new connection between the Atocha and Chamartin   Villabona tunnels on the LEÓN-GIJÓN line; the Parla station
               stations. Signaling systems and train protection ERTMS, CTC   halt project; of the construction project of the SANTANDER
               and auxiliary detection systems in the Madrid-Levante High   IISS; Technical assistance for the  Silla-Cullera-Gandía line;
               Speed   Line (sections: Torrejón-Motilla, Motilla-Albacete and   Montcada bifurcation interlocking; of the B.A.B. in FIGUE-
               Motilla-Valencia), Olmedo-Zamora-Galicia High Speed   Line   RES-PORTBOU; electrical substations and electrification for
               ( section: Ourense-Santiago),  Zaragoza-Huesca  High  Speed     the eastern VALLADOLID railway variant; of the inspection
               Line; High Speed   Line Valladolid-León and Valladolid-Burgos   and support in the management of the exploitation of the Me-
               (VALEBU) for ADIF; Works for the  Platform Screen Doors   tropolitan of Granada.
               installation in the Madrid Metro; Substitution of the catena-  The most relevant technical assistance and construction pro-
               ry of line 2 of Metro de Madrid; Track assembly work in the   jects in 2023 were those of the railway security and telecom-
               extension of Line 1 towards the Ensanche de Vallecas. Works   munications facilities for access to the new Barcelona airport
               for the implantation of electronic interlocking in the Deposit   terminal, the security facilities resulting from the electrificati-
               of Canillejas de Metro de Madrid; Implementation and start-  on of the Ronda-Algeciras line, the elimination of telephone
               up of the concessions of the light rail lines ML 1, ML 2 and   blocking between Villanueva de la Serena – Brazatortas, the
               ML 3 of the Community of Madrid for MINTRA; Modifications   development and implementation of a unified control center
               in Substations of the Madrid Metro; Signaling Supervision in   for ERTMS (CCUE) and the adaptation of existing facilities and
               several Metro Lines of Madrid. Implementation of rail-ground   equipment on the high-speed lines in the Northwest area . The
               protection implementation in 18 traction centers of the Ma-  Level Crossing projects in various stations and routes for ENY-
               drid Metro. Implementation of the  signaling CBTC system   SE, ICF and THALES, the low cost ERTMS and the Calatayud
               and ITCS control center in the La Loma-Ciénaga Line and in   BAB for Alstom.
               the Rolling Stock of FENOCO (Colombia); Implementation of   At the beginning of 2025, it contracted with EUSKAL TRENBI-
               the ERTMS N1 system in the Sarmiento Line of Buenos Aires   DE SAREA-RED FERROVIARIA VASCA (ETS) in a joint venture
               (Argentina). For the tender for the concession of the Mósto-  with SAITEC for the “Technical support service for the imple-
               les - Navalcarnero line for OHL; For the tender of the Lima   mentation of the ERTMS system in ETS. Usurbil - Hendaye
               urban train concession for OHL; Of the systems of signaling   section.”
               and protection of the train ERTMS of High Speed   Line Zara-
               goza-Huesca (section: Tardienta-Huesca) for ADIF; Of the   RAM and Safety Consulting: RAMS Supervision on Lines 1
               systems of signaling and protection of the train ERTMS, CTC   and 6 of the Madrid Metro; RAMS supervision on Line 7b
               and auxiliary detection systems in the Madrid-Levante High-  (Metroeste) of the Madrid Metro; RAMS Supervision in the




            Spanish Railway Yearbook 2026 Anuario del Ferrocarril                                              243
   240   241   242   243   244   245   246   247   248   249   250