Page 235 - Anuario FFCC - 2026
P. 235

disruptions. They will also contribute to rail infrastructu-  Principales productos y servicios:
                re projects from ÖBB, including the 130-kilometer high-  HERRAMIENTAS
                performance Koralm Railway as well as the Semmering   CONSULTORIA
                Base tunnel, which will enable trains to travel at speeds   CONEXIÓN EN GENERAL
                up to 230 km/h.                                 TUBOS PARA INSTRUMENTACIÓN DE ALTAS PRESTACIO-
                                                                NES                                              guía de empresas
                In 2024, ABB’s Traction division announced the launch   TOMAS DE MASA & POTENCIA
                of the Pro series traction battery that are designed spe-  RAIL
                cifically for demanding transportation applications. The   MATERIAL EMC/EMI-RFI
                innovative battery pack, the newest addition to ABB’s al-
                ready extensive Traction Battery family, is engineered to   Productos estrella: INFRAESTRUCTURA: 1.  Herramienta
                offer modularity and scalability, as well as best-in-class   Multitool. 2. La Stanley RD60.
                performance, high level of safety, and  superior energy   Áreas geográficas donde comercializa los productos y ser-
                density in a compact design. The new Traction Battery   vicios: España y Portugal.
                Pro also provides long lifetime with over 20,000 cycles   Certificaciones:
                and has rapid charging capabilities, enabling 80% charge   Calidad y Medio Ambiente: en proceso de obtención.
                in 10 minutes.                                  N.º de empleados: 4.

                Geographic areas where your products and services are
                marketed: All over the world.

                                                                Team:
                                                                Manager: Pedro Morata
                                                                Director: Vanesa Morata
                                                                Technical: Nuno Neves
                                                                Administration: Maribel Alvares

                                                                Activity:
                                                                Mechanical  construction,  Electrification, Electronic traction,
                ABCONEX SOLUCIONES S.L                          Air conditioning equipment, Auxiliary electrical equipment,
                                                                Auxiliary mechanical equipment, Brakes, Engineering and
                                                                Consulting, Maintenance, Rolling stock and traction equip-
                        Dirección postal / Postal address:      ment, Telecommunication, Track.
                           C/ Arturo Baldasano, 3B
                           E-28044. Madrid. España              Main products and services:
                           Teléfono: 915 00 78 61               TOOLS
                           Email: info@abconex.es               CONSULTANCY
                           Web: www.abconex.es                  CONNECTION IN GENERAL
                                                                HIGH-PERFORMANCE INSTRUMENTATION TUBES
               Equipo                                           EARTH BONDING SYSTEM
               Gerente: Pedro Morata                            RAIL
               Directora: Vanesa Morata                         EMC/EMI-RFI EQUIPMENT
               Técnico y Soporte Comercial: Nuno Neves          Top products: INFRAESTRUCTURE: 1. Multitool Hydraulic.
               Administración: Maribel Alvares                  2. The Stanley RD60.
                                                                Geographical areas where it markets products and services:
               Actividad:                                       Spain and Portugal.
               Construcción mecánica, Electrificación, Electrónica de trac-  Certifications:
               ción, Equipos de aire acondicionado, Equipos eléctricos au-  Quality and Environment: in process of obtention.
               xiliares, Equipos mecánicos auxiliares, Frenos, Ingeniería y   No. of employees: 4.
               consultoría, Mantenimiento, Material rodante y equipos de
               tracción, Telecomunicación, Vía.




            Spanish Railway Yearbook 2026 Anuario del Ferrocarril                                              233
   230   231   232   233   234   235   236   237   238   239   240