Cookie Consent by FreePrivacyPolicy.com Company tab: ROVER RAIL, S.A. - Revista VÍA LIBRE - Fundación de los Ferrocarriles Españoles

Company: Company tab

ROVER RAIL, S.A.

Versión en castellano

Postal address Ochandiano, 18 - Edif. A
Parque Empresarial El Plantío
E-28023 Madrid. Spain
Telephone +34 91 444 44 80   Web www.rovergrupo.com   
Company data
Management team

Director of Construction: José Luis Letón. Production Manager: Rafael Domingo. Chief Financial Officier: José María Ros. Technical Manager: Miguel Angel Prieto. Machine Head: Jorge Gallego. Director of Quality, Safety and Environment: Andrés León.

Activity Construction of railway infrastructure and track. Maintenance and Other.

Main products and services

As a specialist in railway projects, primarily engaged Rover Rail both the assembly and the maintenance of way, either high speed lines, conventional or metric gauge lines. Also involved in the construction of infrastructure in new development, variants of lines in service, track corrections and renovations. Its areas of activity extend to the entire railway sector, including urban rail trams, light rail and metro.

 

Top products: MAINTENANCE: 1. Maintenance of Track Superstructure and Platform. High-Speed Lines and Conventional Network. TRACK: 2. Execution of any project on metric gauge railways lines (Adif RAM, FGC, FGV, Metro, Euskotren, etc.), even with the use of heavy railway machinery.

 

Activities by year

Maintenance of infrastructure, track and switches of the Madrid - East high-speed line (Requena and Monforte del Cid bases). Maintenance of infrastructure, track and switches of the Antequera - Granada high-speed line. Maintenance of high speed railway line (AVE) Olmedo-Zamora for a period of twenty five years (2015-2040).
Maintenance of infrastructure and track of conventional and metric gauge lines. ADIF 2022-2023. Northeast Operations Subdirection. Construction project for the integral improvement of the Huesca – Canfranc line. Ayerbe – Caldearenas section. Execution of the construction project works for the implementation of the standard gauge in the Mediterranean corridor. Section: Castellbisbal-Murcia. Subsection: Vinaroz - Vandellós. Track and Electrification. Execution of the construction project works for the implementation of the standard gauge in the Mediterranean corridor. Section: Castellbisbal-Murcia. Subsection: Vandellós – La Boella. Track and Electrification. Adaptation of track and infrastructure of the Sagunto - Teruel section to promote freight traffic. Track assembly and electrification of the Nudo de la Teja - Mogente - Alcudia del Crespins section. Construction project for de renovation of switches and level crossing on the line 1 and 2 of Metrovalencia. Execution of the works of the construction project of a gauge changer in Granada.

Innovations

Expansion of the machinery park with the purchase of the a dynamic stabilizer machine DGS Compact capable of working on 3 track gauges (1000-1435-1668), a turnouts laying system PEM-LEM of Geismar, a metric gauge machinery set consisting by a switch tamping machine, a profiling ballast machine, a locomotive and ballast hoppers, and a first category switches tamping machine and a profiling ballast machine in international and conventional gauge. System for measuring the amount of ballast in the track profile. Security system for the execution of maintenance operations on railway tracks. Platform for monitoring and control of maintenance workforce on the railway lines. Advanced intelligent predictive maintenance system. Development of new intelligent topographic tools.

Areas Algeria, Colombia, Peru, Spain, Poland, Saudi Arabia, United Arab Emirates, Sweden and Turkey.

Certifications Quality and Environment: ISO 9001, ISO 14001, OHSAS 18001.

Activities Infraestructure, Maintenance, Others, Track.
Previous company
see other company tabs
Next company