Company: Company tab

ROVER RAIL, S.A.

Versión en castellano

Postal address Ochandiano, 18 - Edif. A
Parque Empresarial El Plantío
E-28023 Madrid. Spain
Telephone +34 91 444 44 80 Fax +34 91 444 44 81 Web www.rovergrupo.com
Company data
Management team

Director of Construction: José Luis Letón. Production Manager: Rafael Domingo. Chief Financial Officier: José María Ros. Technical Manager: Miguel Angel Prieto. Machine Head: Jorge Gallego. Director of Quality, Safety and Environment: Andrés León.

 

Main products and services

As a specialist in railway projects, primarily engaged Rover Rail both the assembly and the maintenance of way, either high speed and / or conventional. Also involved in the construction of infrastructure in new development, variants of lines in service, track corrections and renovations. His areas of activity extend to the entire railway sector, including urban rail trams, light rail and metro.

 

Top product: MAINTENANCE: Maintenance of Track Superstructure and Platform. High-Speed Lines and Conventional Network

 

Activity Infrastructure Construction and Via. Maintenance and Other.

Activities by year

Activities in 2019: Maintenance of high-speed railway line (AVE) Madrid-Barcelona-French border for a period of five years (2014-2018). Maintenance of High Speed Railway line (AVE) Valladolid-Burgos and Venta de Baños-León for a period of four years (2015-2019). Maintenance of high speed railway line (AVE) Olmedo-Zamora for a period of twenty five years (2015-2040).Work on the project to build platform-Northwest North Corridor High Speed Madrid-Galicia Tunnel La Canda. Installing the High Speed track Madrid-Galicia on its stretch of the Olmedo-Pedralba de la Pradería. Platform for High speed stretch-Torrejón de Velasco Pinto (Madrid). Building and track renovation in line Chinchilla-Cartagena Section Minateda-Cieza, Camarillas. Building of platform in Plasencia Station of high speed railway line (AVE) Madrid-Extremadura. Various maintenance works ADIF conventional network, both in infrastructure and track superstructure works in the field of investment, and seconds performances emergency interventions. Saudi Arabia: Construction of Medinah workshop for the HST line. Phase II. Algeria: Construction of tramway in Ouargla. Poland: Renovation of track lines nº140 and nº158 of the Rybnik-Chalupki railway line. Track renovation and modernization in the Kościerskyna-Gdynia railway corridor. Proyect T2B. First stage of expansion of the terminal T2. Colombia: Administration, maintenance, monitoring, operation and traffic control among other activities on the Bogota – Belencito and La Dorada- Chiriguana lines.

Innovations

Innovations in 2019: System for measuring the amount of ballast in the track profile. Security system for the execution of maintenance operations on railway tracks. Platform for monitoring and control of maintenance workforce on the railway lines. Advanced intelligent predictive maintenance system.  Development of new intelligent topographic tools. Industry 4.0 for the integral management of landfills and land disposal.

Areas Algeria, Colombia, Peru, Spain, Poland, Saudi Arabia, United Arab Emirates, Sweden and Turkey.

Certifications Quality and Environment:ISO 9001, ISO 14001, OHSAS 18001.

Activities Infraestructure, Maintenance, Others, Track.
Previous company
see other company tabs
Next company